6,495 results • Recent activity
Strengthening of existing 230kV O.K.Mandapam - Myvadi feeder SC line on DC tower(loc 29-Udumalpet SS)Reach19.
As per NIT
Rectification Works to the damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to Mill Plant Operator Room South from CH 0m to CH 90m in Unit 4
Supply of Saw Tooth Expansion Joints style -01 of size 1837X1735 mm - 2 Nos and Saw Tooth Expansion Joints style -02 of size 1837X1735 mm - 6 Nos.
Remedial measures by Strengthening and Protective Coating in the RCC PSC Structures of Coal Jetty 1 Conveyor System 14 from JT 1E towards West Long Span 6 10 of TTPS in Red Gate area North Break Water of VOC Port at ECHS areas
MTPS-I ES Circle CI Unit-III Bunker 3D collapsed - Rectification restoration of mill area instrumentation Mill 3A,3B,3C 3F- both FSSS and Turbine 3 sub division