Construction of 132 KV Transmission lines on ACSR Panther conductor approx 90 route Kms of UPPTCL on Turnkey basis
UNDERGROUND SECTION OF 132 KV SC SECTOR 28 YEIDA 220 to SECTOR 10 YEIDA LINE AND 132KV SC JEWAR 220 to SECTOR 10 YEIDA LINE 03 CABLES ON TURNKEY BASIS
Construction of 132 KV Partapur (Jagriti Vihar) (220)-132 kV UPEIDA (IMLC) Double circuit line with Panther equivalent HTLS conductor on DC tower
Construction of 1x401x63MVA 132KV S/S Meerut
Construction of 2x40 MVA 132KV S/S Budaun on turnkey basis
Construction of 132 kV Sector 28 YEIDA(220)- Sector 10 YEIDA SC LINE and 132 KV Jewar(220)-Sector 10 YEIDA SC Line
Construction of LILO of 220KV Metro depot Jalpura at 220 kV Ss Ecotech 10 and 220 kV Ecotech10 Avaada SC line with Zebra equivalent HTLS Conductor on MC and DC Monopoles and Narrow Base Multi circuit Lattice tower
Engineering, Supply, Erection and Commissioning for Increasing Capacity at 220kV Substation Hardoi from 02 Nos. 160 MVA to 03 Nos. 160 MVA on Turnkey Basis
132kV Main Bus bar Extension throught XLPE Cable, 132kV Switchyard Extension work, Construction of 05 Nos. 132kV AIS Bay, 132kV Main Bus Bar Strengtheing from Single Tarantulla to Twin Moose for IMLC Shahjahanpur on Turnkey Basis
Upgradation of the Existing SAS Based 132kV GIS Substation to 220kV GIS Substation with 02 Nos. 160MVA Transformers and Augmentation of Existing 132kV Transformation Capacity from 02 Nos. 63MVA to 3 Nos. 63MVA at Ecotech10, Gr. Noida