Loading…
Loading…
693 results • Latest
Providing and fixing of differential protection relay for 160 MVA T/F-II at 220 KV S/S Shamshabad Road under ETD-I Agra
Supply of material required for operation and maintenance of various 132/33 KV Sub-stations under Electricity Transmission Division-II, Basti H.Q. at Siddharth nagar
Unbranded Food Grade Plastic Round Plain Glass Coasters
Milton 1000 ml Vacuum Flask
Unbranded Ceramic Serving Tray or Platter
DESIGN, DETAILED ENGINEERING, MANUFACTURE, SUPPLY and ERECTION OF ROUTE MARKER ALONG THE 220 KV PANKI-KIDWAI NAGAR AND 220 KV PGCIL (BHAUTI-KIDWAI NAGAR) UNDERGROUND LINE
Erection of 33 KV Transfer Bus and associated work at 132 KV Substation Soraon, under Electy. Trans. Division-I, Prayagraj
SUPPLY OF SILICA GEL BREATHER WITH SILICA GEL
Replacement of damage/defective VCB of 33 KV Solar BAY at 132 KV Sub-Station, Begampur under ETD Bahraich
Work of Replacement of Pipeline for 160 MVA T/F-I and 160 MVA T/F-II including Dismantling of old mulsifyre pipe line and overhauling of mulsifyre system at 220 KV S/S Manth under ETD Mathura
Work of Providing and Fixing of Differential Line Protection Relay at 220 KV Manth 220 KV-Manth 400 KV Line under Electy. 400 KV Division, Manth, Mathura
Work of Replacement of Y-Phase AIS-GIS Bushing of 200 MVA ICT-III installed at 400/132 KV GIS S/S Agra South under Electricity 400 KV S/S Division Agra South
Supply of 03 Nos. SPS for ICTs at 400kV Substations of UPPTCL
Design Engineering Manufacturing Testing Supply Stringing Installation Testing Commissioning etc. for Construction of 132 KV Transmission lines on ACSR Panther conductor (approx. 123.97 route Kms) of UPPTCL on Turn-key basis
Design Engineering, Manufacturing Testing Supply Stringing Installation Testing Commissioning etc for Diversion Shifting Height Raising of 220 KV DC PGCIL Gola line approx. 21.047 route Km on Turn-key basis
CONSTRUCTION WORK OF OVERHEAD(OH) PORTION OF LILO of 132 kV NARA-BAGHRA LINE 132 KV S/S SUZRU ON TURNKEY BASIS
FOR SHIFTING, LOADING, CARRIAGE AND UNLOADING OF DIFFERENT MATERIALS FROM THE DIFFERENT SUBSTAIONS TO 220 KV SUBSTATION SAHUPURI WITH ALL ASSOCIATED WORK UNDER ELECTIRICTY TRANSMISSION DIVISION-III, SAHUPURI.
LOADING, CARRIAGE AND UNLOADING OF 120KN DISK INSULATOR FROM 132KV S/S TANDA UNDER ETD-FAIZABAD TO 132 KV S/S ITWA
COMPLETE OVERHAULING OF DIESEL GENERATOR SET SET INSTALLED AT 132 KV SUBSTATIONS MUNGRABADSHAHPUR UNDER ETD, JAUNPUR
work
HEIGHT RAISING WORK OF 132 KV SARNATH-CANTT LINE FOR CROSSING OF PROPOSED ELEVATED ROAD BETWEEN LOC NO. 10 and 11
Civil Maintenance Upkeeping work
Civil Maintenance Up keeping work
Supply of different Type Clamp, Connector and other material for 33 KV Breaker, Isolator and CT for various S/S Under ETD-I Prayagraj
Leg Repairing of 132 KV Rania-Jainpur Line under ETD I Kanpur
Replacement of Protection panels for 220 KV Basti-Bhaukhari line bay and 220 KV Basti-Bansi Line Bay and Replacement of C and R Panel of 145 KV Bus Coupler bay at 220 KV Sub-Station Gidahi Basti Under ETD-I, Basti.
Overhauling work of 132 KV SF-6 CB Installed at Different 132 KV Sub-Station Under ETD-I, Basti
Increasing Capacity at 220 kV Substation Sector 20 Noida
Thermal Scanning of different voltage transmission line twice a year under Electy. Trans. Circle-I, Prayagraj
Erection and installation of 63MVA T/F alongwith strengthening of 132KV Bus Bar from Single Moose to Twin Moose and splitting of 33 KV Bus at 132KV Sub-Station Khaga, under Electy. Trans. Division-Fatehpur
work
providing and fixing of 132/33 kV different make isolator mechanism boxes and CT junction boxes installed at 132 kV s/s Bhangel under ETDI Noida
SUPPLY FIXING OF 250 WATT YELLOW LIGHT AT 400 KV S/S BANDA
SITC of PAC
Different Repair and Maintenance work in different section UPSLDC Gomtinagar Lucknow.
Civil work for Renovation and Restoration of toilets in the Control Block AT SLDC BHAWAN, GOMTI NAGAR, LUCKNOW
DESIGN DETAILED ENG MANUFACTURE SUPPLY OF 132KV AL COND CORRUGATED AL SHEATHED XLPE CABLE WITH ACCESS LAYING ERECTION OF JOINTS TERMIN. AND TESTING COMM FOR TERMINATION OF 132KV LINE AT PROPOSED 132KV Subs IIT CAMPUS ON TURNKEY BASIS
Construction of UG portion of LILO of 132 KV NARA BAGHRA AT SUZRU 06 CABLES and spare on turnkey basis with 132kV 630 sqmm al Cond XLPE cable
Work for Replacement of Damaged equipment 33 KV OEF Feeder and Main Bus Ist AND III Section Isolator at 220 KV Substation RPH under ETD 1 Kanpur
Construction of 02 Nos 220 KV Bay
Design Engineering Manufacturing Testing Supply Stringing Installation Testing Commissioning etc for Construction of 132 KV and 220 KV Transmission lines on ACSR Panther and Zebra conductor (approx 94.86 route Kms) of UPPTCL on Turn-key
work
Work
acer Intel Core i5-13500 All in One PC
WORK FOR HIRING OF 01 NO DIESEL VEHICLE WITH DRIVER 12 MONTH and INCLUDING DIESEL FOR SUB DIVISIONAL OFFICER ELECTRICITY TRANSMISSION SUB-DIVISION KARVI, CHITRAKOOT UNDER ETD BANDA
Construction of 33 KV Bay
Revetment of tower foundation at tower location No.60 (A type) of 132 KV S/C Phulpur - KauriharLine and tower location No.17 (A type) of 132 KV S/C Handia - Jhunsi line, under Electy. Trans. Division-I, Prayagraj
Electrical Work
Electrical Work
For Supply and Replacement of OSR Relay of 40MVA TF at 132KV SS Malwan and 160MVA TF at 220KV SS Malwan and spring charging mechanism and motor set at 132KV SS Jahanabad under ETD Fatehpur.