Loading…
Loading…
6,291 results • Latest
Construction Of Bridges At RD 7800m And 8400m Respectively And Drain Crossing, Catch Water Drain In Affected Areas Of Chikhlapar Sub Branch Canal Of Mokabadi Lift Irrigation Scheme.
Preparation of Detailed Project Report for repair and maintenance of 10.00 numbers of aqueducts situated at different chainages (Total length length 1165.50 meter) in Tenu Bokaro Canal. under Tenughat dam division, Tenughat
Construction of retaining wall to nallah near the house of Dr. Shirish Borkar at Deulwada in V.P. Borim of Shiroda Constituency
CONSTRUCTION OF ENERGY DISSIPATION ARRANGEMENT OVER WASTE WEIR FOR PANGARDARWADI STORAGE TANK UNDER KMIP LIS 2 STAGE-3
Construction of WBM Road at Sukkarwada Distributary RD 0.00 M to 700.00 M.
Construction of Tar Road in Irrigation Colony Diversion Road Khargone
Survey and investigation for Extension near of village Itiya Bitiya Garha Medium Project
KMIP LIS 2 STAGE 1 BALANCE WORK OF BHOYRE PUMP HOUSE (INTERNAL WIRE MESH TO WINDOWS, CHEQUERED PLATE FLOORING OF PUMP FLOOR SLAB, RUBBLE SOLING AND LINING OF APPROCH CHANNEL AND INTAKE STRUCTURE, PROVIDING STONE PITCHING WORK NEAR APPROCH CHANNEL, EA
Construction of Escape in Sukkarwada Distributary at CH. 857 and Supply of Labour for Canal Work.
Survey and Investigation of Batalakhurd Barrage and Jamaniya Tank (Without Canal)