Loading…
Loading…
6,415 results • Latest
Construction Of Cross Regulator Cum Escape at Chainange 1940 m on Donala Dy. Offtaking at Kapsi Sub Branch Canal of Vyahad Branch Canal of Asolamendha Main Canal, Tal - Saoli, Dist.- Chandrapur.
Construction of Additional Structure,CD at Km 20.675, SLR Bridge at Km 26.470, Foot Bridge at Km 25.860 and 27.630 of KRMC
M and R to K.T.Weir at Dehu, Nighoje, Chimbali and Charholi on Indrayani river Tal - Haveli , for the Year 2026-27 (Removing and Plugging)
Repair and maintenance of air conditioners at the O/o E-in-C, WRD, Bhopal, O/o C.E., E/M and O/o S.E., E/M Circle, WRD, Bhopal
Repairs and maintenance to the Radial gates of size 12 X 5.5 mtr -18 Nos , maintenance of Hoist 20 MT cap Manjara Project Dhanegaon
Hiring of inspection vehicle under E/M Sub Division - Jeerapur for Kundaliya Dam Major Project
Hiring of inspection vehicle for local run and inspection of sites under L/M and E/M Sub Division No. 01, Bhopal (M.P.)
Residual work for 77.00 mt, Length of E/W, P.C.C Lining and Construction of retaining wall/Guard wall and drainage work at Subway Km 27.110 of KRMC
SUPPLY INSTALLATION TESTING COMMISSIONING OF WEIGH BRIDGE 100 TON CAPACITY AT AATMA COTTON PRODUCER COMPANY LIMITED KAMTHA TQ MURTIJAPUR DIST AKOLA
Repair and maintenance of dessert cooler at office of the Chief Engineer Chambal Betwa Basin Office, WRD, Bhopal.