Loading…
Loading…
167 results • Latest
CONSTRUCTION OF HR CUM CR WORK AT CH.857 and SLR BRIDGE AT CH.1261 OF PUNASI MAIN CANAL
Repair work of Hydra Crane 3.35 tonne capacity, CMU, Bhopal.
Supply Of H. S. C. Centrifugal Pump 10 Cusec 30m Head With Suitable Motor, Starter, Capacitor And All, Supply Of H. S. C. Centrifugal Pump 05 Cusec 35m Head With Suitable Motor, Starter, Capacitor And All, Days Supply Of H. S. C. Centrifugal Pump 05 Cusec 23 M Head With Suitable LT 3 Phase Motor, Suitable Fully
MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 15 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 18 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 21 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 24 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 27 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 30 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 33 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 36 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 42 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 48 MTR HEAD SUMERSIBLE PUMPSET, MANUFACTURE AND SUPPLY OF 1.5 CUSEC (153 m3/hr. ) DISCHARGE CAPACITY & 54 MTR HEAD SUMERSIBLE PUMPSET
On Turnkey Basis Construction of Kheda Galti Barrage on river Mod, as per detailed scope of work but not limited to that.
Construction of retaining wall to nallah bank in Survey no 74 0 near Sahakar Bhavan VP Curti Khandepar in Ponda Taluka.