Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
458 results • Latest
Repairing and Maintenance of pipe line and distribution chamber at Jotsudam HDTW of Kushmandi Block of Gangarampur(A-I) Sub-Division within the jurisdiction of Balurghat(A-I) Division.
Repairing and Maintenance of RCC pipe line at Gazipur DTW of Balurghat(A-I) Sub-Division within the jurisdiction of Balurghat(A-I) Division.
Decoration of Inspection Bunglow of Balurghat(A-I) Sub-Division under Balurghat(A-I) Division.
Construction of Shed near stackyard of Balurghat(A-I) Sub-Division under Balurghat(A-I) Division.
Construction of Shed near cycle stand of Balurghat(A-I) Sub-Division under Balurghat(A-I) Division.
Supply of Mobil and Grease for running / Maintenance of Disel Engines at Ghatal (Agri-Mech) Sub-Divisional Store within Midnapore (Agri-Mech) Division under Non-Plan Programme 2025-26.
Rewinding and Repairing works of 20 nos 20 H.P,440 V, 3 Phase squirrel cage, 1440 RPM induction type electric motor for different R.L.I. Schemes under Jhargram-II (Agri-Mech) Sub-Division under Midnapore(A-M) Division. under NON-PLAN 25-26.
Repair, Modification works and Internal Wiring, Misc. electrical works inside the office Establishment of Kalyani (Agri-Mechanical) Division
Supply and delivery of GI top cover plate, nut and bolt of Alfa-Alfa valve, MS shaft, combined tail piece etc. for smooth running of different Major RLI Scheme under Malda-II (A-M) S/D within Malda-I (A-M) Division under Non-Plan maintenance.
Supply and installation of Inverter and tubular Battery for uninterrupted power supply for smooth functioning of establishment work of Malda-I (A-M) Division and Malda-I (A-M) Sub-Division under non-plan maintenance.
Yearly maintenance work of Malda Inspection Bungalow under Malda-I (A-M) Division, Malda for the period of 01.08.2026 to 31.07.2027 under Non-Plan Maintenance for F.Y 2026-27.
Repairing and Rewinding of 25 nos. 20 H.P 3 phase 440 volt Heavy duty squirrel cage electric motor for electrically operated Major RLI schemes under Gazole (A-M) Sub-Division Within Malda-I (A-M) Division under Non-Plan Maintenance.
Repairing and Rewinding of 23 nos. 20 H.P 3 phase 440 volt Heavy duty squirrel cage electric motor for electrically operated Major RLI schemes under Malda-I (A-M) Sub-Division Within Malda-I (A-M) Division under Non-Plan Maintenance.
Hiring of Maxi Cab Non Air Conditioned Pool Car 6 for use at office of the Bankura DPMU Division on daily as and when required under WBADMIP Programme 2026 2027
Hiring of Maxi Cab Non Air Conditioned Pool Car 1 for use at office of the Bankura DPMU Division on daily as and when required under WBADMIP Programme 2026 2027
Supply of different types of Terminal Plate, Flange Adapter, Combined Nipple, Coupling etc. for maintenance the Pump-Motor Set of different Govt. Owned RLI Schemes under Ghatal (Agri-Mechanical) Sub-Div under NP 25-26.
Re-excavation Development of Water Harvesting Tank ( Mondal Bandh Pukur WDS)with Allied structure at Mouza -Parashia, JL No -49, Plot No - 2512, 2512/2773, 2511 under Tantipara Gram Panchayat within Rajnagar Panchyat Samity in the District of Birbhm
Renovation of Pump House and Pipe Line with Spout Chamber at Kubajpur D.T.W. (BN-281) under Purbasthali-II Development Block within Patuli (AI) Sub Division under Burdwan(A-I) Division in the District of Purba Bardhaman under Core Sector Programme
Re-Drilling against Defunct Tube Well at Hatsimla-II D.T.W. (BN-114) at Mouza-Hatsimla,Block-Purbasthali-I in the District of Purba Bardhaman under the Executive Engineer (A-I),Burdwan (A-I) Division under Core-Sector Program
SLGAIIPDIV/NP/eNIT2/202627
Construction of Solar Operated Pump Dug-Well (PDW) (4nos.) at Mouza- Sahabazar, JL No-182, Plot No-374, 393, 354 and 369 G.P.- Nagari under Suri-I Dev. Block within Birbhum District under Burdwan(A-I) Division under Core-Sector Programme
Re-Drilling against defunct Tubewell at Dampal D.T.W. (BN-26) under Purbasthali- II Development Block under Burdwan (A-I) Division, in the District of Purba Bardhaman under Core Sector Programme.
Re-Drilling of Dharmadanga (Govt. Owned) HDTW (BN-358) Scheme at Mouza-Dharmadanga, Block-Kalna-I G.P.-Hat Kalna, Mouza-Dharmadanga, JL No-95,Plot No-358, Latitude-23.22221 Deg.N, Longitude-88.33213 Deg.E. in the District of Purba Bardhaman
Redrilling against Defunct Tube Well including Conversion of Damaged RCC Pipeline and Renovation of Pump House at Balarampur DTW (BN- 296) at Mouza-Balarampur, Block-Monteswar in the District of Purba Barddhaman under the Executive Engineer (A-I), Bu
Re-excavation and Development of Water Harvesting Tank ( Maheshpur Dighi Pukur WDS ) with Allied structure at Mouza -Maheshpur, JL No -162, Plot No - 275, 277 under Panchra Gram Panchayat within Khoyrasole Panchyat Samity in the District of Birbhum
Re-Drilling against defunct at Majhigram H.D.T.W. (B.N.-494) under Mangalkote Development Block within Katwa(AI) Sub Division under Burdwan(A-I) Division in the District of Purba Bardhaman under Core sector programme.
Re-excavation of Jhamre Pukur Water Detention Structure (WDS) at Mouza-Danya, Block Pandaveswar in the District of Paschim Bardhaman under the Executive Engineer (AI) Burdwan (AI) Division under JALATIRTHA (Phase-XI) Program
Re-drilling and Repairing Renovation of Pump House,pipeline of deep tube well at Rasulpur DTW (BN-307)under Kalna-I development block within Kalna-I(A-I) sub-division under Burdwan (A-I) Division in the district of Purba Bardhaman under Core sector
Re-Excavation of Madanpur Bandh Water Detention Structure (WDS) with Allied Structure at Mouza-Madanpur,Block-Andal GP-Madanpur, Mouza-Madanpur, JL No-48 Plot No-361,Latitude-23. 575767Deg.N,Longitude-87.158967Deg.E. in the District of Paschim BDN
Re-Excavation and Development of Water Harvesting Tank (Tala Pukur WDS) with Allied Structure at Mouza-Mondalpur, Block- Mayureswar-II, G.P.-Daspalsa,No-137, Plot No-168,Latitude/Longitude-23.979084Deg. N/87.782462Deg.E. in the District of Birbhum
Re-Excavation and Development of Water Harvesting Tank (Kotalipukur WDS) with Allied Structure at Mouza-Shibdaspur, Block-Rampurhat-I, G.P.-Kusumba, in the District of Birbhum under the Executive Engineer (A-I), Burdwan (A-I) Division under MATIR-SRI
Drilling and Installation of 150mm Dia New Light Duty Tube Well as Bartikra Solar LDTW Cluster (04 Nos) at Mouza-Bartikra, Block-Jamalpur,G.P.-Jarhgram,JL No-63,Plot Nos-905, 1239, 1462 and 948
Re-Excavation and Development of Water Detention Structure (Dotalbona Pukur WDS) with Allied Structure Mouza-Shibdaspur,Block-Rampurhat-I G.P.-Kusumba, JL No-13, Plot No-373,Latitude-24.214731Deg.N, Longitude-87.745545Deg.E.in the District of Birbhum
Re-Excavation and Development of Water Detention Structure (Bene Pukur WDS) with Allied Structure Mouza-Shibdaspur, Block-Rampurhat-I G.P.-Kusumba, JL No-13, Plot No-328,Latitude/Longitude-24.211961 Deg .N / 87.745540 Deg.E.in the District of Birbhum
Repairing and Rewinding of 17.5 H.P./ 20 H.P. 3 phase, 440 Volt Squirrel cage Induction Electro Motor for Maintenance of different RLI schemes under Memari(Agri-Mech) Sub-Division under Burdwan (Agri-Mech) Division f.y.2026-27
Repairing and Rewinding of 17.5 H.P./ 20 H.P. 3 phase, 440 Volt Squirrel cage Induction Electro Motor for Maintenance of different RLI schemes under Kalna (A-M) Sub-Division under Burdwan (Agri-Mech) Division F.Y.-2026-27
Repairing and Rewinding of 17.5 H.P./ 20 H.P. 3 phase, 440 Volt Squirrel cage Induction Electro Motor for Maintenance of different RLI schemes under Burdwan (Agri-Mech) Sub-Division under Burdwan (Agri-Mech) Division F.Y.-2026-27
Repairing and Rewinding of 17.5 H.P./ 20 H.P. 3 phase, 440 Volt Squirrel cage Induction Electro Motor for Maintenance of different RLI schemes under Katwa(Agri-Mech) Sub-Division under Burdwan (Agri-Mech) Division F. Y. 2026-27
Repairing and Rewinding of 17.5 H P/ 20 H P 3 phase, 440 Volt Squirrel cage Induction Electro Motor for Maintenance of different RLI schemes under Durgapur (Agri-Elec) Sub-Division under Burdwan (Agri-Mech) Division F Y 2026-27
Repairing of store room and office gate of Burdwan(A-M) Division Office Building under Burdwan (Agri-Mech) Sub-Division under Burdwan (Agri-Mech) Division under Non Plan in the District of Purbo Bardhaman.
Repairing work of 20 H.P Electro-Motor Pump Set with Base Plate an Coupler with Pipe Fittings or Pump or Electric Motor (any make) used at RLI installations along with ancillary works under Kalna(A-M) Sub-Division under Burdwan(A-M) Division
Installation of Pump at new PH and ancillary connection from new installed point by laying of MS pipe at Nabasta Major RLI Scheme, Block Bhatar under Burdwan (Agri-Mech) Sub-Division under Burdwan (Agri-Mech) Division under Non Plan.
Repair Maintenance of P H and WTA of dept. own and operated tube well with necessary wiring and including supply of materials at Khempur HW 83, Debipur I HW 12 D.T.W under Unpur Dev. block under Howrah AI Division under Core Sector 2025-26 Prog
Repair Maintenance of P H and WTA of dept. own and operated tube well with necessary wiring and including supply of materials at Mullick Chak HW 07, Kumirmora HW 33 D.T.W under Unpur Dev. block under Howrah AI Div. under Core Sector 2025-26 Prog
Reconstruction of Boundary Wall, Septic Tank, Soak Pit and Maintenance of Office Building at the Office of the A E AI, Udaynarayanpur AI Sub Division under Howrah AI Division in the District of Howrah under Core Sector 2025-26 Prog
Repair Maintenance of P H and WTA of dept. own and operated tube well with necessary wiring and including supply of materials at Kalikapur HW64, Kanupat HW 32 D.T.W under Unpur Dev. block under Howrah AI Division under Core Sector 2025-26 Prog
Rewinding and Repairing of 17.5 H.P. A.C. 3 phase, 2800-2900 R.P.M., 50 Hz submersible motor of different make with repairing of submersible pump bowl assembly under Jalangi (A-I) Sub-Division under Berhampore-I(A-I) Division under Non-Plan.
CONVERSION OF UTTAR SIMLA PATPOCHA MAJOR RLI (GOVT. OWNED AND OPERATED) SCHEME AT MOUZA UTTAR SIMLA, JL- 217,PLOT- 370, G.P- LACHMAPUR, BLOCK- KHARAGPUR-II, UNDER CORE-SECTOR 2025-2026 PROGRAMME. PROJECT ID-WI252645807S000.
Rewinding and Repairing of 20 H.P. A.C. 3 phase, 2800-2900 R.P.M., 50 Hz submersible motor of different make with repairing of submersible pump bowl assembly under Jalangi (A-I) Sub-Division under Berhampore-I(A-I) Division under Non-Plan.
Urgent Repair and Restoration work of Collapsed Boundary Wall of Stockyard and Inspection Bungalow under the E.E. (A-M), Malda-I (A-M) Division under Core-Sector Program during the F.Y. 2026-2027