Loading…
Loading…
1,212 results • Latest
Supply and delivery of 9000 nos of LT Spacer 1 Phase 2 Wire
Supply and delivery of 60 nos LT distribution KIOSK for 100 KVA TRNF (Macedon make)
Supply and delivery of 65 nos LT distribution KIOSK for 63 KVA TRNF (Macedon make)
Supply and delivery of 65 nos LT distribution KIOSK for 63 KVA TRNF
Supply and delivery of 8000 nos. of 3PH 4 wire LT Spacer
Supply and delivery of 1000 nos of MS Bracket 4 wire and as per standard specification
SUPPLY AND DELIVERY OF 8000 NOS OF 3PH 4 WIRE LT SPACERS
Supply and Delivery of 95 Numbers LT DISTRIBUTION KIOSK for 25 KVA TRNF SMC-FRP Type
Internal repair-renovation works at Project-IV HQ Office, 2-D Block, Vidyut Bhavan
Refilling of existing portable fire extinguishers at various buildings of LA Block Housing Complex, Salt Lake
Laying laying of 11 KV XLPE UG cable 300 sqmm R L 0.890 KM for drawal of new 11 KV line from Moipith temporary 33/11 kV Substation to Nagenabandh village under Joynagar Division
Construction of earth mat as per earth mat layout plan at Manirtat 33/11 KV Substation under Joynagar Division.
Lighting Mast at Bhagwanpur
Supply delivery of LT Dist Kiosk 100 KVA TRNF
Supply delivery of Porcelain Guy Insulator LT
Referred to NIT
Construction of new 33 kV UG line double by micro tunneling 1220 Mtr and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C400 sq mm XLPE cable from Bombay Road Subway to Bhuiapara Khatal under Howrah 1 Division
LT DIST KIOSK FOR 100 KVA TRNF
2nd Call for Laying of 33 KV and 11KV XLPE Cable for new Deganga 33/11 KV Substation under Barasat Division.
Installation and Commissioning of new 33 KV Lines and Feeder Bays for LILO arrangement with associated electrical and civil works at Regent Garment Substation under Barasat Division.
Entry and Mid Level Desktop Computer (Q2) ( PAC Only ), High End Laptop - Notebook (Q2) ( PAC Only ) (3 (3 ))
High End Desktop Computer (Q2) ( PAC Only ), High End Laptop - Notebook (Q2) ( PAC Only ) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Schedule of work for Supply and Erection of Earth mat and other allied work for construction of new 33/11 KV Sub Station at KELOMAL under Tamluk Division
Construction of one(01) no. of temporary 33/11 KV Sub-station at Sujali under Islampur Division.
Construction of one(01) no. of temporary 33/11 KV Sub-station at Kunor under Raiganj Division.
Proposal for painting of Switchyard as well as iron materials at Ranihati (Nabghora) 33/11 KV Substation under Uluberia Division
Construction of new 33 kV UG line by micro tunneling 1000 Mtr and laying of 200 mm dia PE 80 PN 6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable from Rajchandrapur Zero Point to Bally 33 11 kV Sub Station under Howrah 1 Division
Day to day and preventive maintenance, guarding rounding the clock at Rammam Intake and Forebay and cleaning of desilting basin at Rammam Intake under Rammam Hydel Project, Stage-II.
Repair, maintenance and minor civil works, water supply arrangement for I.B. Complex along with operation and maintenance of water treatment plant of I.B Complex under Rammam Hydel Project, St-II.
Repair, maintenance and minor civil works for C-type quarters, Field Hostel-D and Medical Unit at Lodhoma Colony, Medical Unit at Lingsebong Colony, Mungmung Khola Store and Water Supply line from Sarju Khola to Lingsebong Colony under Rammam Hydel
Laying of 11KV 3Cx300sq.mm. XLPE Cable (R.L. 1.780 Km) for evacuation of power from Banipur Substation of 2 nos. new 11 KV feeders under Habra Division.
Electrical Works for conversion from Group control to individual control against two numbers 6-3MVA PTR at Basirhat 33/11 KV Sub-Station
Supply of VHF base station WalkieTalkie sets and accessories with two years warranty followed by two years AMC
Supply and Delivery of LTDISTBOX 3PH CON.WH ST.STRAP BUCKLE ABC
Rate contract for repairing of Damaged_ Defective Power Transformers with_without OLTC of different Type and Capacity upto 10MVA
LT DIST. BOX 3PH CON. WH ST. STRAP AND BUCKLE (Make Should have ERDA/CPRI test certificate)
Supply and delivery of 55 Nos LT Distribution Kiosk for 100KVA Transformer
Installation of 33 KV Metering and protective equipment at the premises of M/s Metsil Exports Limited at Hatasuria for effecting the new 33 KV Bulk connection under Bankura Division, WBSEDCL
Installation of 33 kv metering as well as protective equipment at the premises of MS SBEG pvt ltd for effecting 33 kv bulk connection.
INSTALLATION OF 33 KV METERING AS WELL AS PROTECTIVE EQUIPMENT AT PREMISES OF ECL, KALIDASPUR
Laying of 11KV 3X185sqmm XLPE cable through micro tunneling with HDPE pipe of RL 500 mtr and other allied works regarding INSTALLATION OF NEW 02 NOS 160 KVA DTR
2nd Call for Construction of Cable trench, Switchyard development, Pathway and allied work at Haroa 33/11KV Sub-station under Basirhat Division, 24Pgs(N)
Construction of one numbers of OG bay at Gosaba substation for new 33KV line from Gosaba 33/11KV substation to new temporary Mollakhali Substation under Canning Division.
PTR Augmentation work at Gopalnagar 33 by 11KV substation with other allied works under Tamluk Division.
Construction of protection wall near Magazine House under Rammam Hydel Project, St-II.
Emergency construction of protection wall and other allied civil works at Lodhoma Car Point below Guest House under Rammam Hydel Project, St-II.
Laying of UG Cable at Farakka Bus stand for bifurcation of New Farakka 11KV feeder by NH12 and Railway crossing under Raghunathganj Division as per schedule and as per drawing and specification of WBSEDCL
Supply and Delivery of Flat Type Eye Hook for LT AB Cable under Raghunathganj Division as per drawing and specification provided
Cleaning and washing of PCC Poles and RAIL Pole structure and other Iron materials by wire brush to make them smooth. All PCC Poles and foundation Plinth above ground level are to be painted with two coat of cement primer and two coat of final paint