Loading…
Loading…
1,212 results • Latest
Construction of new 33 kV UG line by micro tunneling 590 Mtr and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable from Bhuiapara Khatal to Rajchandrapur Zero Point under Howrah 1 Division
Construction of new 33 kV UG line by micro tunneling 600 Mtr and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C400 sq mm XLPE cable from Anmol Complex Main Gate to Uttar Joypur Bill Shiv Mandir under Howrah 1 Division
Construction of new 33 kV UG line by micro tunneling 650 Mtr and laying of 200 mm dia PE 80 PN 6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable from Anmol 33 11 kV Sub Station to Anmol Complex Main Gate under Howrah 1 Division
MINOR RENOVATION OF INSPECTION BUNGALOW UNDER KALIMPONG DIVISION
Schedule of Labour for Augmentation of BALAGARH 33 11Sub-station from 1 10 1 6.3 MVA to 1 10 2 6.3 MVA Other allied works under Mogra Division
Laying of 33 KV 3X400 sqmm 450mtr and 11 KV 3x 95 sqmm 500 mtr XLPE cable through micro tunneling with HDPE pipe and other allied works at location Nandakumar more and others location for drawal of 33 KV Banbhera PHE line.
SETTING UP OF ANY TIME PAYMENT (ATP) TOUCH SCREEN KIOSKS ON BUILD, OWN, OPERATE AND MAINTAIN (BOOM) BASIS FOR COLLECTION OF PAYMENT OF ENERGY BILLS AT VARIOUS 150 NOS. OFFICE LOCATION OF WBSEDCL IN WEST BENGAL FOR A PERIOD OF (3) THREE YEARS
Construction of pathway by paver block boundary wall bike stand and other allied civil works for staff quarter access in the premises of Power House Complex under Krishnagar (D) Division
Construction of CT PT Cable support foundation cable trench pathwayyard development and ther allied civil works at Santipur 33/11 Kv Sub Station under Ranaghat Division in the district of Nadia
Repair and maintenance of boundary wall at karimpur 33/11 Sub station
Annual repair maintenance and tit bit civil sanitary works at Krishnanagar Administrative Building and other buildings including staff quarters inside the campus of Krishnanagar Power House Complex in the district of Nadia
Renovation and maintenance work at Aranghata CRB under Ranaghat (D) division in the district of Nadia
SUPPLY OF 20 NOS 11KV I/D HS Ter.Jnt.FOR3x400SMM XLPE CAB And SUPPLY OF 20 NOS 11KV O/D HS Ter.Jnt.FOR3x400SMM XLPE CAB
SUPPLY OF 25 NOS 33KV O/D H.S TER JNT.FOR3x400SMM XLPE CAB UNDER NEWTOWN DIVISION
SUPPLY OF 51 NOS. LT FEEDER PILLER BOX AT NEWTOWN DIVISIONAL STORE UNDER NEWTOWN DIVISION AS PER SPECIFICATIONS MENTIONED IN ANX
SUPPLY OF 60 NOS 11KV I/D HS Ter.Jnt.FOR3x95SMM XLPE CAB UNDER NEWTOWN DIVISION
SUPPLY OF 30 NOS 33 KV ST THR. HS JNT. FOR 3x400SMM XLPE CAB UNDER NEWTOWN DIVISION
SUPPLY OF 60 NOS 11KV O/D HS Ter.Jnt.FOR3x95SMM XLPE CAB UNDER NEWTOWN DIVISION
SUPPLY OF 40 NOS 11KV I/D HS Ter.Jnt.FOR3x185SMM XLPE CAB AND SUPPLY OF 40 NOS 11KV O/D HS Ter.Jnt.FOR3x300SMM XLPE CAB AT NEWTOWN DIVISIONAL STORE UNDER NEWTOWN DIVISION
SUPPLY OF 30 NOS. LT METERING KIOSK AT NEWTOWN DIVISIONAL STORE UNDER NEWTOWN DIVISION
SUPPLY OF 65 NOS. 11KV ST THR. HS JOINTING KIT FOR 3x300SQMM XLPE CABLE AT NEWTOWN DIVISIONAL STORE UNDER NEWTOWN DIVISION
System improvement work by drawl of HT and LT line with installation of RMU, DTR, LT Kiosk, FPB, DB etc at CA and CB block, AA- I under Newtown Division
System improvement work by drawl of HT LT line with installation of RMU DTR LT Kiosk FPB DB etc at BA BG block AA I under Newtown Division
Drawal of 33 KV 3X400 Sq. mm. XLPE cable one from ID 132KV GSS another from NT AA IIIG 33/11KV Substation along with construction of 01 no Feeder bay at NT AA IIIG Substation upto 33 KV 4 -Panel Shunt Trip RMU with VCB at WIPRO LTD AA-IIIG New T
System improvement work by drawl of HT LT line with installation of RMU DTR, LT Kiosk FPB, DB etc at DE DF block, AA- I under Newtown Division
System improvement work by drawl of HT LT line with installation of RMU, DTR, LT Kiosk, FPB, DB etc at DA DB block AA- I under Newtown Division
Supply and Delivery of FXD and MVG CONTACT 400A RTYPE and COPPER FLEXIBLE BRAIDED TAPE 400A under Raghunathganj Division as per drawing andspecification provided.
Biannual Civil Maintenance work for Khatra Division Office, Khatra CCC, Khatra 33BY11KV Sub station and one 3 storied staff quarter located at Khatra Administrative Building campus under Khatra Division, Bankura Region, WBSEDCL
Modification of bus arrangement to 1.5 Inch Pipe bus in fabricated structure at Barjora 33by11 KV Sub station for the proposed switching Sub station at WBIDC Industrial Park Barjora under Bankura Division
Repairing and Maintenance work at Kenduadihi 33 by 11 KV sub station.
Extension of Control Room Building, painting of existing CRB, Boundary wall, construction of Fencing, box culvert, approach road, cleaning and re-spreading of gravel and other allied civil works at Barjora 33by11 KV SS under Bankura Division
Installation of chequered tiles in pathway, painting of Control Room Building, cable trench cover slab along with other tit-bit maintenance work at Chhatna 33 by 11 KV sub-Station under Bankura (D) Division
Repair and renovation of Boundary wall, laying of chequerd tiles in pathway, concreting in front of CRB, painting of CRB and Boundary wall along with other tit bit maintenance at Jorehira 33by 11 KV Sub Station under Bankura Division
Construction of cable trench for evacuation of 33KV power from Jorehira 132by33KV GSS and other allied works at Jorehira 33by11 KV S Stn premises under Bankura Division, WBSEDCL
Repair Maintenance and Painting of CRB and boundary wall, broken cover slab replacement over cable trench, installation of chequered tiles on pathway, construction of new cable trench, washing and respreading of gravel at switchyard etc.
Renovation of 33 kV Switchyard, Construction of pathway, painting outside of Control Room Building along with other tit-bit maintenance work at Patradanga 33 by 11 KV sub-Station under Bankura (D) Division
Construction of VCB, PT and CT Foundations, Cable Trench and Switchyard Development and Painting of Control Room Building at Joypur 33by11 KV Sub station under Bishnupur Division
11KV cable laying work by installing 02 nos shunt trip switchgear at NT AA IIA IIB Substation for effecting HT Bulk service connection at Forum Group ,Newtown AA IIB under Newtown Division
Plotter Printers (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Drawal of 04 Nos. of 33 KV 3X400 Sq. mm. XLPE cable in LILO arrangement i.r.o 33KV Candor 2 feeder from NT ID 132/33/11 KV GSS upto 33 KV, 4 -Panel Shunt Trip RMU with VCB at M/S Candor Kolkata One Hi-Tech Structures Pvt. Ltd. , AA- IA, New Town, R
System improvement work by drawl of HT LT line with installation of RMU DTR, LT Kiosk, FPB, DB etc at AA and AD block, AA I under Newtown Division
Different Electrical and Civil works of 33 by 11 kV GIS substation at the OZONE Housing Complex within the South 24-Parganas Region under the Garia Division
3 phase LT Spacer
Printing, Supply Delivery of Stationery Forms for the Kolkata Zonal Stationery Store under Kolkata Zone, WBSEDCL
Construction and Erection of Temporary 33/11 KV Sub Station at Manirtat under Joynagar Division in the District of 24-Pgns(S)
Running Operation Supervision Maintenance of Canteen Catering Services including supply and delivery of foodstuff at our subsidized rate to the employees attached to Power Station I of TCFHP WBSEDCL situated at Leusipukuri Dist Darjeeling WB 734434
Entry and Mid Level Desktop Computer (Q2), Computer Monitor (V2) (Q2) (3 (3 ))
Procurement of HW Single Tension for wolf cond
RCC Road construction and allied civil works at Plassey 33/11 kv sub-station at Nakashipara Division in the District of Nadia.
Thorough Repair and Maintenance of Dhubulia CCC Building located at Dhubulia under Nakashipara Division in the dist of Nadia