Loading…
Loading…
278 results • Recent activity
Replacement of existing HPSV MH fitting with LED light fitting in Terminal Building and auxiliary building at Aurangabad Airport
SITC of various LED lights at Goa International Airport. SH Replacement of LED light of concourse Arrival and Departure and Verandah Entry side.
Construction of lift well for 4 storeyed residential building in AAI Colony at Vadodara Airport.
Annual maintenance term contract (Civil) for CISF Barracks at Vadodara Airport for Two years (2026-28).
AMC (Civil) for OTB, Service Block, Surrounding area of NITB and Residential colony at Vadodara Airport for Two years (2026-28).
Annual maintenance term contract (Civil) for New Integrated Terminal Building, Operational area and ATC Block at Vadodara Airport for Two years (2026-28).