Loading…
Loading…
15,711 results • Best match
Construction of Koovappady Varavattappady Foot bridge and side protection wall
OD33269/2025-2026:Engaging coolie labor for conveying the construction materials by head load from the stack location to the construction site. Head load distance is 100 m.
Repair work of the bridge constructed on the Gauda Moazzamnagar road from Lucknow-Haradoi road in Lucknow district
Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2605 of MoRTH specifications for road & bridge works. (Excluding G.S.T.)
Repair work of bridge at Km 8 of Jugail to Parsoi road
Earthwork in excavation for structures as Per drawing and techanical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Repair work of bridge at Km 3 of Jugail to Bailgadhi road
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. As per MORTH 4.01/ 401 A
ANNUAL REPAIR WORK FOR EXISTING BRIDGES AND APPROACHES IN P.W.D. BRIDGE SUB DIVISION MANDSAUR
ANNUAL REPAIR WORK FOR EXISTING BRIDGES AND APPROACHES IN P.W.D. BRIDGE SUB DIVISION MANDSAUR
Repair work to Iron foot bridge in km 18 of BBC and repair to minor 6 other releted works