Loading…
Loading…
15,679 results • Best match
GENERAL-Vakkayil Bridge-Budget Work 2017-18-Construction of Vakkayil Bridge across Pozhichal in Aroor LAC in Alappuzha District-Providing Lighting arrangements.-General Electrical Work
Electrical works
Repair work of bridge on Nagina Badhapur Pakhro road km 6 on Kho River.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Repair and Protection work of Minor Bridge at Anjan Saheed Chhihi Road km 2
Dismantling brick work or stone work in lime or cement mortar,RCC Work and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 meters(200 feet)
Repair work of bridge on Nagina Badhapur Pakhro road km 11 on Nakta River.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Repair and Protection work of Minor Bridge at Jiyanpur Muhammadabad Link Road km 9
Construction of subgrade and earthen shoulders :-Construction of subgrade and earthen shoulders with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (Carted up to 3.00 KM.)
Repair and Protection work of Minor Bridge at Chilbilla Dan Chilbilla Road km 3
Construction of subgrade and earthen shoulders :-Construction of subgrade and earthen shoulders with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (Carted up to 3.00 KM.)