Loading…
Loading…
2,416 results • Best match
Providing and fixing street light system on octagonal poles at SEZ-II, EPIP Sitapura, Jaipur
Add extra in item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by making pit at regular interval and repairing the pit after laying of cable with PCC/ Bitumin as required.
SPECIAL REPAIR OF HT CABLES, POLES STRUCTURES AND CONVERSION OF OVERHEAD HT LINES TO UNDERGROUND CABLES ALONGWITH ALLIED WORKS AT SILA GARRISON UNDER GE NAGROTA
Sand cushioning to under ground cable laid in trenches for laying of HT/ LT UG cables 8 cm wide before laying the cable and 15 cm after laying and punned down to a depth of 10 cm as per MES SSR Part-I (2009), complete all as specified and directed. Note: Punned thickness shall be measured and paid to the contractor.
PROVISION OF LIVING ACCOMMODATION FOR HALF DSC PLATOON IN VARUNA RESIDENTIAL COMPLEX AT NPOL, KOCHI
M&L for river washed and screened, dry sand for filling in trenches below 8cm laid before laying of cable and 15cm sand cable laid after laying the cable and around underground cables for cushioning of cables complete all as specified and directed.
Surveying, Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR cum Pump house , SCADA Automation of all CWR, Rising Main, Distribution Network, House connection, Boundary wall, MS gate etc
Erection H.T./L.T. panels, transformers, laying of cables & filling H.T., L.T. Cable end boxes as detailed above.
REPAIR OF DAMAGE UG XLPE CABLE, RESTRINGING OF OH CONDUCTORS AND REPAIR OF DAMAGED SWITCH SOCKET, LIGHT FITTING AND POINT WIRING AT VARIOUS LOCATION AT NAMKUM UNDER GE RANCHI
M & L for Sand cushioning trenches using fine sand to under ground cable, laid in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified and directed.
REPAIRS/ RENEWAL OF APFC PANELS, LT FEEDER PILLERS, LT SWITCH GEARS AND ALLIED WORKS AT MUDFORT, HANUMAN TEMPLE, HAVELOCK LINE, NCC, SAPPERS LINE, CE(FY) AND ADJOINING AREA UNDER AGE EM II OF GE (UTILITY) SECUNDERABAD
Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in hard/ dense soil for foundation of poles, structures, stay rods, laying of underground cable etc complete all as directed by Engr-in-Charge.