Loading…
Loading…
2,416 results • Best match
S&T work in connection with conversion of Chowrasi Siding as block station with block working system between Chowrasi and Ramkanali along with EI working system at Chowrasi.
Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 metre. For Track/ pucca road/platform crossing/ level crossing as per SEM Drawing No.15-D5 including supply, transportation and laying of RCC Pipes(full) with collar(for jointing pipes) Inner diameter/Outer diameter: 100mm/150mm to 9 Specification No. IS: 10262-1982 or latest and IS-456-2000 RCC structural drawings as per SEM Drawing No. 15-D3 (Sheet-2) in trench and drawing of cable through RCC Pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables (Cable laying charges is also included).This includes repairing and plastering of platform/pucca road after cable laying. Material inspection shall be done by Railway Site Engineer.
Various Telecom Works in connection with (i) Augmentation of existing SSE Signal store depot at Bhusawal (BSL) & Manmad (MMR) office and construction of new SSE office & store depot at Jalgaon(JL) on BSL division. (ii) Provision of Railnet connectivity at ROH Depot Bhusawal. (iii) Provision of telecom facilities at Admin Building ACL/BSL.(iv) Provision of internet connectivity at store shed/ACL/BSL (V) Development of Infrastructure and other needs of Railway school
Excavation of cable trench as per cable route plan,1.2 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid in trench by loose soil for a layer 13 of 50mm thickness after clearing of route,bushes etc.It shall be ensured that top of the cables laid is at a depth of 0.8 m or more If it is less,then the width and depth shall be suitably increased and accordingly proportionate payment shall be made .In case depth of trench is not achievable due to site conditions,Proportionate payment will be made as per procedure.The work shall be done as per the extant practice on Central Railway and instructions of Railway Engineer at site.Drg No.SK 805
Electrical work for Interlocking of 3 nos. of level crossing gates (KA-48, RC-2 & MR-35) where TVU is greater than 10000 over Adra division.
Laying of(Railway Supplied) cable in underground through excavation Metre of cable trench laying with end termination connection with necessary accessories , testing of cable providing bricks 'A' class, sand and refilling of trench by soil as per IS and CEE/GRC's Drg.No.CEE/ G/ A- 3/P-134 or latest with all accessaries and in case of road crossing/concrete path/track crossing, the same to be laid through pipe inclusive of supply of all requisite materials, cable route marker etc.Details in Expl note.
13/EDC(BLP)/2026-27
Looping, Hosting, Diging, Laying of XLPE cable in HDPE pipe with machine.
Under Business Plan 2026-27, Construction of New 11 KV line on semi turn-key basis in the area of Electricity Distribution Division, Deoria
Laying of XLPE Cable
Provision of 07 Nos. Electronic In-Motion Weighbridges(EIMWBs) over Chakradharpur Division.
Horizontal Drilling by using manual pushing Metre method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/HDPE/GI Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe.