Loading…
Loading…
2,415 results • Best match
Providing Lighting Facilities to AMETHYST Hostel Cycle Shed
Supply and laying of following size Double walled Corrugated High Density Polyethylene pipe having corrugation on the outer wall and plain surface inner wall conforming to IS 14930 part- I and part -II complete with necessary HDPE fitting for protection and laying of 1.1 KV grade underground cable directly in ground at a depth 75cm including excavation and refilling the trench etc. as required.
33 KV LINE AUGMENTATION WORK UNDER EDD- PUKHRAYA
Laying, Digging, Sagging, Stringing, Binding and Jumpering etc. of 33 KV 3*300 XLPE Cable on the underground Laying by HDD Method as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
INTERNAL REPARING, RENEWAL, RENOVATION FASAD LIGHTING UPGRADATION WORK & INTERNAL RENOVATION WITH ELECTRIFICATION WORK OF DR. B.R. AMBEDKAR MEMORIAL HOSPITAL, AT RAIPUR , DISTT. RAIPUR.(DN. NO.2, RAPIUR).(DEPOSITE WORK) (Without Escalation and Bonus)
Supplying and laying of Cat 6 outdoor cable solid annealed Bare copper Conductor ,LLD PE/PE sheath Material For Video Power and audio Communication with laying cable Underground with suttable size Pvc conduit /Casing Caping and other accessories as per requirment.
SPECIAL REPAIRS TO WALLS, FLOORS AND ROOFS IN HVFTS AT HVF, AVADI.
Laying of cable by drilling under the stone set road for a lead distance of 45 meters and minimum diameter of 2.5" with HDPE pipe (without damaging the existing underground power cable and telephone cables)
GES/PKT/24/2026-27 PROVN OF GUARD ROOM WITH ATT TOILET AND BATHROOM ALONG WITH LADDER FOR ROOF TOP NEAR POST NO. 3 OF MSL REGT AND PROVN OF TOILET WITH BATHROOM AT NP- 3-5-7 (FWC) OF GR AND PROVN OF STORAGE ROOM NEAR BLDG NO. P-127 AT AD BDE UNDER
M & L for good quality dry sand cushioning to under ground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified and directed. Note: Punned thickness of sand shall be measured.
SPECIAL REPAIR TO BLDG NO P-95 OFFRS MESS (EXCLUDING ROOF TREATMENT AND NEWLY ADDN/ALTN PORTION) AT SRC, RAMGARH CANTT
Supply and spreading clean, dry, fine river sand for under ground electric cable in two layers (8cm thick before laying of cable & 15cm thick after laying cable to a total of 23cm) including gentle punning the sand upto 18cm (total thickness) and consolidated around cable for protection of UG cable complete all as specified and directed. NOTE:- For measurement purpose punned thickness shall be considered as per clause 19.75 of SSR Part-I.