Loading…
Loading…
2,407 results • Best match
etender for Replacement of old damage cable from main academic block to nursing hostel URC Goindwal
XLPE INSULATED ARMOURED CABLES (UNDERGROUND): Supply, laying and erection of aluminium conductor XLPE insulated PVC sheathed armoured and served cable 1100 volts grade as per IS:7098 (Part-1)1988 to be laid 1metre below ground level including excavation, sand cushioning, covering with sand & First Class bricks and back filling the trench etc., of the required size as per PWD General Specifications:-Overall size 240sq.mm (3½ Core) Armoured (Underground) 34.10 A (xxx) (1158.00 + 70% = 1968.6 + 5.35%= 2073.92)
"Construction of 3rd line work including earth work, blanketing, minor bridges, major bridges, LC work and other miscellaneous works for DFC feeder route of Indian Railway Standard Loading, execution of indoor & outdoor S&T works, execution of general electrical works, installation and commissioning of overhead equipment (OHE) for traction and power supply in connection with the 3rd Line work of Chandil-Purulia section in Adra Division of South Eastern Railway." on Engineering, Procurement & Construction (EPC) Mode.
Cables (Cable laying charges is
Construction of New Building (G plus 4) with foundation of (G Plus 8) in the Court Premises of Bongaon in the District of North-24-Parganas ---- External EI Work (Sub-Station and Compound Light).
Laying of two cables above 185 sqmm in an underground trench in single tier formation (horizontal), the trench size : 680 mm x 760 mm average depth, with brick protection on the top of each cable 8 (eight) Nos. bricks per Mtr. and 4 (four) Nos. bricks per Mtr. as separator between the bricks and cables and also trench to be filled up with shifted soil, levelling up and restoring surface duly rammed 2x4C 300 sqmm
Signalling work in connection with BCM work with Geogrid and Geo-Textile method (TFTR & TBR) in Solapur Division of Central Railway.
Excavation of cable trench as per cable route cum plan,1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid in trench by loose soil for a layer of 50mm thickness after clearing of route,bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8m or more. It if is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions proportionate payment will be made as per procedure. The work shall be done as per the extant practice on Central Railway and instructions of Railway Engineer at site. Drg. No. SK 805
CA NO. GE/K-34/2026-27 - SPL REPAIR OF BLDG NO T-29 (BN JA, HQ COY OFFICE) OF 508 ASC BN, T-12 (OR LIVING) AT OLD MARATHA COMPLEX EX 508 ASC BN, T-620 (SMS SHALTER), T-82 (COOK HOUSE), T-534 (BATHROOM WITH WC) OF 6121 (I) FD WKSP COY AND 03 BATHROOM
Excavation in trenches, not exceeding 1.5m wide and not exceeding 1.5m in depth, for foundation etc. or for shafts, wells, cesspits, manholes, pier holes, not exceeding 10 sqm on plan and not exceeding 1.5Mtr in depth & getting out of hard / dense soil for taking out cable & laying of cable complete all as specified and directed by the Engg-in-Charge.
CONSTRUCTION OF NEW 2X5) MVA 33/11KV SUBSTATION BABUGANJ, 33KV LINE AND 11KV FOR BABUGANJ, DIST. JAUNPUR ON SEMI TURNKEY BASIS.
Laying & dressing of 11 kV, 3*300 sqmm underground cable with Double CKT Configuration from 5MVA T/F to 11 kV incoming switchgear in the trench 650 mm wide, 1000 mm deep providing 75mm fine sand, cushion beneath and 75mm fine sand cushion above the cable. The cable shall be duly protected by bricks, sand & saparate stone slab. The work includes supplying of fine sand, bricks and stone slab are refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and burried in the trench in the shape of rings at both ends cable laying work includes unrolling cutting mage ring and sealing both ends of the cable. (All required materials likes sand, bricks & stone slab etc. will be provided by contractor)