Loading…
Loading…
2,712 results • Best match
Providing New 315KVA Transformer with all its HT accessories for CT Scan Machine at Area Hospital, Malkajgiri, Medchal Malkajgiri District
Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables from 95 Sqmm up to 400 sqmm covering the cable with bricks and back filling of Trench duly providing Cable route Indicators of size 152mm round / 102mm x 102mm / 152mm x 152mm at every 8 Mtrs distance embedded in C.C including cost and conveyance of materials and labour charges etc., complete.
Earthwork in formation and in cutting, Blanketing, Construction of Minor Bridges, Major Bridges, Drain, Retaining Wall, Toe Wall, Track Works, Station Building, Level Crossing Works, Passenger Amenities Works, Signalling & Telecom works, Electrical works in connection with execution of 3rd Line between Barabanki to Burhwal section, on EPC mode, under Lucknow Division of North Eastern Railway.
Cutting of CC work for road/wall etc & covering/ cum plastering of cutted CC work under or side of road/wall by cement & sand mortal after laying of cable/fixing of pole/laying of CI pipe/GI pipe/wiring or for making new cable trench work Complete in all respect.
Renovation of Central Library at Gandhinagar (Phase-II)
GI perforated cable trays for laying power & control cables between HVAC Shaft
SPECIAL REPAIR OF OR MD ACCN FROM P-451 TO P-458 AT JOGINDER SINGH ENCLAVE NEW CANTT PRAYAGRAJ
M&L for sand cushioning with Ganga Sand to underground cable (8 cm thick before laying and 15 cm thick after laying the cable) complete all as specified and directed.
SPECIAL REPAIR OF OR MD ACCN FROM P-335 TO P-342 AT JOGINDER SINGH ENCLAVE NEW CANTT PRAYAGRAJ
M&L for sand cushioning with Ganga Sand to underground cable (8 cm thick before laying and 15 cm thick after laying the cable) complete all as specified and directed.
ADDN/ ALTN TO CERTAIN MD ACCN AT 3 WG AT AF STN PALAM UNDER GE (AF) PALAM, DELHI CANTT - 10
M&L for sand cushioning to under ground cable provided with layer of sand (8cm deep before laying the cable and 15 cm deep after laying the cable ie total 23 cm) complele all as specified and directed.Note: Punned thickness shall be measured for payment only.