Loading…
Loading…
2,712 results • Best match
Erection of 25KVA transformer and necessary electric installation for giving electric supply to 55 KLD STP fixed in GLR Sy No. 129, Belagavi Cantonment.
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 3x95 to 150 Sqmm
Installation 37 nos. Electric Street Light
Laying of cable upto 2 core 25 sqmm on wall/surface Incl. S &FMS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting
As mentioned and described in BOQ
Supply and laying UG cable XLPE insulated screened PVC bedded,galvanized steel strip or wire armoured electric power cables (heavy duty) 1100V with screened aluminium conductor of size 4 core 25 sqmm, complete all as specified and directed .
1) Electrification of Unwired pit lines/sidings of Solapur Division. 2) Electrical TRD portion of work in connection with the proposed construction of 2 lane ROB in lieu of LC-40 at km 387/3-4 and LC-42 at km 391/8-9 of Daund- Solapur section in Solapur Division.
Erection Total 243705.00 Item- 39 Excavation of cable across track/road, laying of cable in pipe as per specification. S No. Item Description of Item Unit Qty Rate Amount No
Conversion of old KVS building into community Hall at Divisional office complex Nanded-Electrical Arrangements.
Cutting of esphated road/ concrete/ cement/under the track etc., and excavation of 26 cable trench 30cm wide x 90cm deep oad etc., for laying of HT/LT UG cable. After laying of cable the trench should be brought to its original position by providing tar/ concrete/ cement as per the site conditions and as per directions of Rly.Engineer.
Special EI work at Labour Department at New Administrative Building (4th floor) , Jhargram.
Laying of cable upto 3/4 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting. 4 core 25 sqmm