Loading…
Loading…
2,746 results • Best match
Special Repairs to Khadir police station and barrack, Dist. Kutch. (Including Electrical Work (SBD) (6th Attempt)
106 Supplying and laying UPVC cable trunking system comprising unplasticised 20 Mtr. 275.00 Rupees Two Hundred Seventy
B VEHICLE REPAIR BAY WITH OVERHEAD COVER FOR 977 AIR DEFENCE REGIMENT (MOBILE) WORKSHOP AT KALINA MILITARY CAMP, PROVISION OF TWO ARTIFICIAL RECHARGE STRUCTURE INCL MICRO BOREWELLS FOR RECHARGING GROUND WATER IN KALINA MIL CAMP, PROVISION OF 02 X SPL
Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, or pole or laying of cable etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/dense soil include for dressing/trimming sides and levelling/grading and ramming of bottoms of excavation. all as specified and as directed by Engineer -in-Charge
CONSTRUCTION OF GDCC BUILDING AT AF STN KALAIKUNDA
Supply and lay dry river sand filling for under ground cable protection with a layer of 8cm deep before laying and 15cm covering above the top edge of cable after laying complete all as specified and as directed.
As per tender docus
Supply laying & testing cable XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy duty) with aluminium conductor, 1100 volts, (Earthed), grade cross sectional area 6 sqmm, 2 core complete all as specified and directed.
REPAIR AND MAINTENANCE OF HT LINES, VCBs, RMUs, HT CONTROLING DEVICES ALONGWITH MISC ITEMS UNDER GE NAGROTA
Sand cushioning to under ground cable laid in trenches for laying of HT UG cable 8 cm depth before laying the cable and 15 Cm after laying and punned down to depth of 10 cm as per MES SSR Part -I (2009), complete all as specfied and directed.
PROVISION OF DEFICIENT PACKAGE TYPE STP 02 NOs OF CAPACITY 0.3 MLD AND 0.5 MLD INCLUDING SEWER NETWORK AT INS HAMLA, MUMBAI
Taking Down Existing LT UG armoured Cable by Manual Excavation without make and physical damage to Cable while excavation including taking Out LT cable covers and HDPE Protection Pipe for Rerouting The old cable all as directed by the Engineer-in-Charge for the following size of Cables. Note :The rate for Excavation, Extra LT UG Cables, Extra Cable covers and Extra HDPE pipes will paid and measured Seperately if required while old cable laying in Rerouting including all as specified and directed by the Engineer-in-Charge.