Loading…
Loading…
2,580 results • Best match
SITC of Addressable Fire Fighter Telephone System at ICMARD Building
Interconnecting Fire Survival Cable (As per NBC 2016 Part 4) in 'FR' PVC Rigid Conduit through saddles on wall, ceiling, cable duct of the building including Supply & Laying of Cable and Conduit as specified under Sl. No. 4 of Annexure - I (Scope of Work) of the NIT
Electrical work connection to 1.Provision of Interlocking LC gates irrespective of TVU on account of Restricted visibility in BSB Division with RTU & Power Supply arrangement (Total 08 No. LC).2.Provision of Interlocking of LC gates having more than 20000 TVU under jurisdiction of SrDSTE I BSB with RTU & Power Supply arrangement (BNRS-HDT-7C, GYN-BYH-42A B2, GYN-BYH-46A B2 & BYH-HDK-49B B3) (Total 04 No. LC).3.Provision of Interlocking of LC gates having more than 20000 TVU in BSB Division with RTU & Power Supply arrangement. (DDA-MHC-4C & MAU-SHG-31C) (Total 02 No LC).4.Provision of Interlocking of LC gates having more than 50000 TVU in BSB Division with RTU & Power Supply arrangement (SQW-RTU-35 Spl & POU-KKT-64 Spl) (Total 02 No. LC)
conductor cable direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc. as req. Cable laying work shall be governed by IS :1255/1983. (cable supplied by Railway).
Construction of proposed Substation at Body Guard Lines and allied EI worksElectrical installation works for shifting of primary school, provision for electrical power supply for 3 nos container, stores, temple etc and shifting of electrical panel
Laying of two cables above 35 sqmm and upto 185 sqmm in an underground trench in single tier formation (horizontal), the trench size : 680 mm x 760 mm average depth, with brick protection on the top of each cable 8 (eight) Nos. bricks per Mtr. and 4 (four) Nos. bricks per Mtr. as separator between the bricks and cables and also trench to be filled up with shifted soil, levelling up and restoring surface duly rammed [F2/2(b)]
CONSTRUCTION OF 33KV LINE FOR 33/11KV SUBSTATION SAHBADEPUR TAPPED FROM OLD 33KV KABBIRUDDINPUR LINE NEAR DHARMAPUR VILLAGE TO 33KV SUBSTATION IMLO AND 33KV LINE FROM 132KV SUBSTATION KERAKAT, DIST. JAUNPUR TO 33/11KV SUBSTATION TANDAWA JAUNPUR ON SE
Excavation and preparation of standard size cable trench for laying of 33 kV, 3×300 sqmm XLPE cable, including dressing and leveling of trench bottom, providing fine sand cushioning minimum 75 mm before the laying of cable (providing temporary barricading, caution boards and necessary safety arrangements during execution of work shall be arranged by the contractor ).
Modification of existing 33 KV OH Power Line Track Crossings (4-nos) by replacing with HT Cable running over OHE structures at different locations in between GDRA- NPML stations of PDPL-LPJL sections (Group 206) of South Central Railway under Railway Electrification Project/Secunderabad.
Excavation of cable trench in ordinary soil of RM size 450 mm width x 1250 mm deep and making original arrangement after laying of the cable.
PROVN OF SERVO TRANSFORMER FOR STABILIZED POWER SUPPLY FOR IPSS AT AF STN SALUA
Material and labour for sand cushioning for U/G cable 8 cm before laying the cable and 15cm after laying and stretching the cable.Complete all as specified and as directed.