Loading…
Loading…
10,402 results • Best match
33KV UG cable laying with HDD method
Cable Laying and Allied Works for Addition and Alteration in Power Distribution Network in Central University of Jammu
Laying of one number PVC insulated cable and PVC sheathed /XLPE power cable 1.1 Kv grade of following sizes directly into ground to depth of 0.9 meter including excavation , sand cushining of 75 mm , protectice covering and refilling the trench etc as required upto 185m2
Work of replacement of damaged LT AB cable and laying new cable under Purvi Feeder of Electricity Distribution Sub Division (Second) Jaspur
Erection & Laying of LT AR. Cable 4x25
Arrangement of making cable trench for laying HT cable at CESC room for 2nd point HT connection under Md. Ali Park BPS.
Work of replacement of damaged LT AB cable and laying new cable under Paschimi feeder of Electricity Distribution Sub Division (Second) Jaspur
Erection & Laying of LT AR. Cable 4x25
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - CAT 6 AND OFC CABLE LAYING FROM COMNETCEN TO VARIOUS OFFICES FOR NCN CONNECTIVITY; CAT 6 AND OFC CABLE LAYING FROM COMNETCEN TO VARIOUS OFFICES FOR NCN CONNECTIVITY
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - CAT 6 AND OFC CABLE LAYING FROM COMNETCEN TO VARIOUS OFFICES FOR NCN CONNECTIVITY; CAT 6 AND OFC CABLE LAYING FROM COMNETCEN TO VARIOUS OFFICES FOR NCN CONNECTIVITY