Loading…
Loading…
16,925 results • Best match
Supply, delivery and installation of LED light fittings , power cable and street light pole foundation work at WBIIDC Falta Industrial Park sector-IV dist south 24 parganas pin-743504
Laying of cable one No. cable upto 35 sq ...
Rehabilitation of electrical HT/LT distribution systems and Rewiring of service buildings & other rewiring works over Bilaspur division.
"Laying of cable of lower size (upto 4x35 ...
DG VILE BHAGAD GROWTH CENTER INDUSTRIAL AREA M and R to Street light at Vile Bhagad Industrial area Comprehensive AMC for maintenance of Street lights and highmast for two years at Vile Bhagad industrial area.
... excavation of trenches for laying cable, replacing mains, replacing ...
Drawing of Lighting overhead line 2 ph ( 230 V P-P), 4 wire from 11kv main substation to Four point crossing for mine illumination at Gourangdi (A) OCP under Salanpur Area.
Power cable laying & connection overhead pole to switch (with earth cutting)
Electrical work for Provision of 07 nos. of Lifts at Bhaga(2 nos), Madhukunda( 2 nos) and Ondagram ( 3 nos) stations over Adra Division.
Laying underground through excavation of cable trench laying with end termination connection with necessary accessories
Supply and fixing of Steel Tubular Pole with LED fittings and restoration of damaged items at different places of EE, ED and DL block along with main road and park within ward no-32 under BMC.
Micro-tunneling across road including supply of HDPE Pipe for 4 core 16 sq. mm. PVC armoured cable & laying of cable through HDPE pipe by jack push method.
SPL REPAIR TO REPLACEMENT OF BER SUBMERSIBLE PUMP AND IMPROVEMENT OF LIGHTING SYSTEM WITH CONTROL GEARS LIGHT FITTINGS AT TCP GATES AND SHOPPING COMPLEX AT MIL STN GANDHINAGAR
... kept it in stack, after laying of cable all damaged / removed path/ ...
at water logging areas and between IB sections/Block section for easy maintenance/isolation of induced voltage over SBC division.
... thickness as per Drg.No.SDO/Cable laying/ 007 (Annexure-10) as detailed... 'Guidelines on signalling cable laying'.
Increasing Capacity Works
... Making of Chulla for safely laying of cable at incoming switchgear end.... by brick. On both side of cable by laying brick vertically and bricks ...
Increasing Capacity Works
... Making of Chulla for safely laying of cable at incoming switchgear end.... by brick. On both side of cable by laying brick vertically and bricks ...
Electrical work connection to (i) Construction of S&T Goomti under work Provision of Second goods shed common running line of CSL-730m at Pharia (ii) Provision of modular Sewage Treatment Plant at NGT nominated stations Belthara Road (BLTR) & Khorshan Road(KRND) Stations.
... refilling the trench etc as req. Cable laying work shall be governed by... trench in the ground and laying cable(s) on a bedding of minimum ...
Electrical Works for: (1)Construction of 100 Beded RPSF Barrack at Dibrugrah Station. (2)Construction of RPF (OP) Office building and 12 bedded modern RPF barrack at Dhamalgaon (DMGN) station. (3)At FKG- Construction of RPF/OP/FKG office building.
Cable laying for 70 SQ MM 4 Core by excavation... spread over the ground before laying the cable and the cable shall be covered ...
Cradling of 11KV O/H line 2 span (NH Road Crossing) and Erection of 2 span 550V O/H line (MMV room to IV seam UG incline mouth) for rectification of violation identified by DMS (Elect.) under ABG Colliery
Laying of Aluminium cable 120sqmmx3core
HT works Cabling, O/H Line work, Earthing, Package Substation foundation work and LT Cabling upto LT switchgear at Gorbi Mines
Laying of HT cable in ground for 1CX150
SUPPLY, FITTING-FIXING OF NEW LED ACCESSORIES FOR CLARIFLOCCULATOR NO-2,4,ENTRANCE GATEAND CHLORINATOR ROOM OF WTP-II WITH OTHER ALLIED WORKS UNDER CLEAR WATER CAMPUS GRWW.
Laying through Underground Trech.(a)Laying of one No. cable upto 35 sqmm in underground ...
MAINTENANCE OF ELECTRICAL INSTALLATION IN NRB AT CHANDIGARH. (PROVIDING TEMPORARY CCTV CAMERAS IN THE POST GRADUATE GOVT. COLLEGE (CO-ED) AT SECTOR-11, U.T CHANDIGARH UNDER THE JURISDICTION OF ELECTRICAL SUB DIVISION NO. 10, AT CHANDIGARH). (FOR SEME
... wherever required.In case of underground laying, the cable shall be laid in ground... incidental expenses, including cable, supports, accessories, laying, and complete execution ...
MAINTENANCE OF ELECTRICAL INSTALLATION IN NRB AT CHANDIGARH. (PROVIDING TEMPORARY CCTV CAMERAS IN THE POST GRADUATE GOVT. COLLEGE FOR GIRLS AT SECTOR-11, U.T CHANDIGARH UNDER THE JURISDICTION OF ELECTRICAL SUB DIVISION NO. 10, AT CHANDIGARH). (FOR SE
... wherever required.In case of underground laying, the cable shall be laid in ground... incidental expenses, including cable, supports, accessories, laying, and complete execution ...
as per NIT
Providing casing pipe line for laying cable to breaker plinths with ...
SPECIAL REPAIRS TO HT UG CABLE FOR COMMERCIAL LINE FROM POWER HOUSE TO K TOP AT AF STN KANHERI HILLS UNDER GE AF THANE
Excavation in trenches not exc 1.5 m in depth and not exc 1.5 m wide for taking out/laying cable and getting out in Hard rock complete all specified/directed
Development of track machine siding alongwith other infra structural facilities at 18 stations.
Under ground cable laying through RCC/GI pipe/ Metre Track crossing/ rd. crossing as per specification.
Dismantling & Shifting of existing KR line SCADA server system of M/s ASHIDA at RCC/VSKP and installation, testing and commissioning of the same equipment at RCC/RGDA along with supply, installation, testing and commissioning of necessary UPS and battery system.
... necessary new electrical cable, LAN cable laying through trenches and termination ...
OHE work in connection with provision of Electronic Interlocking System with Digital Axle Counter (MSDAC) at SWM 'A', SWM'B' & SWM centre with dual VDU ( 2 nos 25KVA & 02 nos 50KVA AT) in Kota division.
Supply & laying of HDPE pipe of 75/80 mm dia, wall thickness 3mm. The work 08 involves laying of HDPE pipe (In this work 2 cable will be laying which will be separated by each other).
OHE work in connection with provision of Electronic Interlocking System with Digital Axle Counter (MSDAC) at SWM 'A', SWM'B' & SWM centre with dual VDU ( 2 nos 25KVA & 02 nos 50KVA AT) in Kota division.
Supply & laying of HDPE pipe of 75/80 mm dia, wall thickness 3mm. The work 08 involves laying of HDPE pipe (In this work 2 cable will be laying which will be separated by each other).
Conversion of LT over head conductor to under ground cable and connected works at TCP-IV to 17 No Post under GE Gurdaspur.
... in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified ...
Electrical Installation work for power augmentation at Polba Block Primary Health Centre in the District of Hooghly
Laying of cable after cutting floor/pavement/wall as per GS for the following Sizes.
REPAIR/MAINT/IMPV OF SERVICE CONNECTION /POWER DISTRIBUTION SYSTEM AND ALLIED WORKS AT LEBONG UNDER AGE (I) DARJEELING
Supply, Laying & testing cable XLPE insulated screened ...
REPAIR/MAINT/IMPV OF LT UG CABLE, LT PANEL/FPB, JUNCTION BOXES AND OTHER ALLIED WORKS AT JALAPAHAR UNDER AGE (I) DARJEELING
Supply, Laying & testing cable XLPE insulated screened ...
REPAIR/MAINT/IMPV OF SERVICE CONNECTION SYSTEM/ POWER DISTRIBUTION SYSTEM INCL ALLIED WORKS AT JALAPAHAR/KATAPAHAR UNDER AGE I DARJEELING
Supply, Laying & testing cable XLPE insulated screened ...
Repair/maint to perimeter lights and other lights in AOR of CPH and other locations under GE (Utilities) Udhampur
... exc. 1.5 mtr in depth for laying of underground cable and getting out in soft/loose ...
Electrical general service portion of work in connection with Improvement of Pit line lighting arrangement at SUR & KLBG coaching complex of solapur division.
Excavation of trench and laying of cable in open yard/along the track/ Platform surface as per
Shifting of 4000 GPM pump motor set at Jharna sump and shortening of delivery range of 4000GPM pump at 3rd patch due to increasing water level under Muraidih, AMP Colliery.
Shifting and laying of cable from the starter to the motor 80mtr
Electrical work in connection with Up gradation of maintenance facilities including provision of covered shed on washing cum pit lines to facilitates high speed trains maintenance at coaching maintenance complex at Anand Vihar.
... chase & plastering after laying of cable/digging of cable trench, ...
REPAIRING REPLACEMENT OF UTTARAN LIGHTING SYSTEM IN UTTARAN AREAS UNDER WD-22, BR-IV,KMC.
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
Construction of S&T Goomties at 5 No LC's RV-318, NG-36, NG-46, NG-49 & NG-56 in connection with the work of interlocking of LC gates over Waltair Division.
17 17 Single Cable Laying Along the road/Track Metre 1500.00 374.83 562245.00
10/SE/EWC/AYO/2026-27
... Dressing of 3x300 sq. mm XLPE Cable underground Double Circuit. Laying of double circuit 3x300... between 0.25 to 0.04 M. After laying the cable refilling and ramming of ...
Electrical work connection to Construction of 40 bedded RPF Barrack with furniture and electric fitting at Prayagraj Rambag.
arrangement. Cable laying work shall be governed by IS :1255/1983.(cable supplied by Railway).
400054098-SUPPLY ERECTION INSTALLATION AND COMMISSIONING OF CCTV SYSTEM FOR SURVEILLANCE AT DEEPANJALI NAGAR TOWNSHIP OF NTPC SIMHADRI.
HDPE Pipe for OFC and Power cable laying
RECTIFICATION AND REPAIR THE 6.00 SQM CABLE FROM VILATHURAI PUMPROOM TO WELL IN VILATHURAI VILLAGE PANCHAYAT OF MUNCHIRAI PANCHAYAT UNION
laying cable for proper grade and alignment etc
Erection of 6.6KV over Head line to feed power in SHCM at RIV seam from existing feeder of Khottadih Colliery
Trenc cuting and cable Laying
As per BId doc
Optic Fiber Cable laying & binding with
47/SE(T)/GNZ/2026-27
S/C Cable laying Mannual Method
PROVISION OF STANDBY THREE PHASE POWER SUPPLY FROM EXISTING DG SETS TO CERTAIN BLAST PENS AT AF STN ADAMPUR
... of 80 mm thickness before laying the cable and other layer of 150 mm thickness after laying the cable) complete all as specified ...
Providing electrification and S/L in new release pocket in various sector HSVP Gurugram and all other works contingent thereto (Including 6 year defect liability period for T/F and 3 year defect liability period for other item free of cost)
... mm dia (PE-63) NP-4 for laying of underground cable of 185 T o 400 SqmmX3 Core ...
Providing electrification and S/L in new release pocket in various sector HSVP Gurugram and all other works contingent thereto (Including 6 year defect liability period for T/F and 3 year defect liability period for other item free of cost)
... mm dia (PE-63) NP-4 for laying of underground cable of 185 T o 400 SqmmX3 Core ...
Development of Greenbelt Along Sector-25 Road Near Sadhu Forging, Ward No. 01, Ballabgarh, MCF.
Supply and Laying of underground cable in pipe /existing open/closed ...
Kota division: Replacement of defective signalling cables for enhancing safety of signalling system.
... 150mm x 300mm Metre deep for laying of cables in rocky area and refilling the duct (after cable laying) with concrete mixture of ...
Kota division: Replacement of defective signalling cables for enhancing safety of signalling system.:Replacement of Old & Outlived Batteries at 24 Stations and 2 IBH on Kota Division
... 150mm x 300mm Metre deep for laying of cables in rocky area and refilling the duct (after cable laying) with concrete mixture of ...
SPECIAL REPAIR TO DBS BUS BAR XLPE CABLES AND EARTHING WORKS FOR CERTAIN BILLETS AND SAFETY BAY AT 21 WG AF STN LEH
... sand, 80mm thick before laying of cable and 150mm thick (punned down to 100mm thick) after laying of cables, in trenches/ducts, complete ...
Laying underground HDPE Pipe line for dewatering flooded water from low lying area filed village Farmana khas outfall at RD 57200/L Karsola Minor.
[24.2.3.3]LT CABLE 3.3. Laying of underground cable 0.75 metre below ground ...
Construction of park in ward no 7 MC jakhal
[24.2.3.2]LT CABLE 3.2. Laying of underground cable 0.75 metre below ground ...