Loading…
Loading…
4,906 results • Best match
At GPZ and HMY: Additional work required to complete the Phase-I of work of "Under ABSS - Soft upgradation of GPZ, HMY stations - Improvement of Facade, entry Porch, Waiting hall, & circulating area. (Project id: 08.04.53.25.3.53.011)
Sanitary, Water Supply & Drainage for Improvement of Facade, entry Porch, Waiting hall and other
Construction of a two-lane end-to-end Road Over Bridge (ROB) with LHS in lieu of LC No. 295/A at Km. 702/9 - 703/0 between Sarju - Jarwal Road stations in Gonda - Barabanki section and Construction of two-lane ROB (Railway portion only) in lieu of LC.No 300/Spl at km 713/4-5 between Chauka Ghat & Burhwal Railway stations in GD-LJN section of Lucknow Division of N.E. Railway.
Geo Composite Drainage Sheet (use ico Sqm Compsite Drainage Sheet in place of Filter Media)
Road Restoration of various road cut/damaged by various service providers under South Maintenance Zone, PWD during 2026-27
Providing and laying at or near ground level factory made kerb stone of M- 25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
Construction of Hitesh Deka path Hajalpara Chowk to Betna post office road with Soil Stabilization Method using Terrazyme under SDMF (ASDMA) for the financial year 2025-26.
Cross Drainage work 34/11.1 - Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil Upto 3 m depth
Flood restoration and reconstruction of play field at Arhama Shopian.
Supply, installation, Curbing and marking of FIBA approved synthetic modular suspended interlocking Sports Flooring (Tile) with specifications as size (340.8mmx304.8mmx15.8mm) :- weight not less than 370gm/Sft, thickness not less than 1.50 cm, UV resistant antiskid surface made of Polypropylene (PP), double layered structure / Mesh with side locks, minimum temperature bearing capacity -40°C to 70°C, stay for 24 hours, Ball rebound performance ≥ 90%, slip resistance 80s-110, vertical deformation :1.5mm-5mm & the Product shall be listed on official FIBA website. The product should be Modular Flooring with application of game lines and transition materials. The items should be inclusive of drainage, adjustment of poles, curbing of edges / corners etc. complete marking of game line with game line paint as per FIBA inclusive of all leads, lifts, GST and carriages etc. complete in all respects”.
(SH - Construction/ Repair of all components i.e Footpath, Drain, Central verge, MS Railling/Grill etc. of roads except Re-carpeting main carriageway under Sub Division SER-11, Division South East Road-1, PWD ) (Balance work).
Providing and laying at or near ground level factory made Kerb Stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).NOTE:1) Nothing extra shall be paid for fixing the kerb stone after cutting into size for filling the gaps between kerb stone/ wall/ obstruction/ discontinuity/ other blocks at the edges/ around the unpaved tree edges etc.2) The contractor shall be responsible for implementing measures to mitigate rat infestation issues that may potentially damage the footpaths and tiles. This includes the application of pesticides, rat-killing medicines, chemicals & the incorporation of ground glasses with sand and soil beneath the tiles as deemed necessary to deter rodent activity.3) Only paved portion of the footpath will be measured for payment process (i.e. excluding of unpaved portion around trees, green patches, soil patches meant for green areas).