Loading…
Loading…
11,066 results • Best match
Electrical Infrastructure Works for evacuation of Power generated from 1200 MW Solar Power park in District Jalaun, Uttar Pradesh (03 Nos. Pooling Substation (33/400 KV).
Development of 400 kV GIS with 03 Nos. of 250/125/125MVA, 400/33/33kV Step-up Power transformers, 33 kV switchgears, Solar Park Control Monitoring System and associated auxiliary systems including civil & structural works at Madhogarh as per GTS for PSS including Bay Extension works at Orai PGCIL S/s tools and tackles and all accessories as per General technical specification
Erection & labour work of supply, laying, testing & commissioning of 11/22 kv underground XLPE cable (XLPE cable will be supplied by DGVCL) with cable end termination & straight through jointing kit (to be supplied by contractor) on ARC basis under all scheme under Althan sub division under Piplod Division as well as all Sub-division in jurisdiction under Piplod Division or within the jurisdiction of Surat City Circle.
surface after laying cable in trench. This will provide
Construction of new 33 kV UG line by microtunneling and laying of 200 mm dia PE80 PN6 HDPE pipe and laying of 33 kV 3C 400 sq mm XLPE cable at different places from Singhti 3311 kV Sub-Station to Sheagori 3311 kV SS of Howrah II Division.
Micro-Tunneling work with laying of HDPE pipe of 200mm diam., PE-80, PN-6 as per instruction of site engineer and as per site condition for laying of UG cable including supply of HDP pipe as per IS:4984-1995 including preparation and submission of drawing for such cable laying
Electrical General work in Connection with "ABSS: At Aluabari Road Jn. - Provision of Approach Road and Improvement of Circulating Area at 2nd Entry".
ground level for laying of cable & refilling the soil
Electrical work for "Rewiring of staff quarters with latest scale of fittings along with Copper wiring for 2nd phase in Colony area PLW/PTA
Excavation of trench under soft soil minimum 1 meter deep & 400 mm wide for laying of PVC/XLPE aluminium armoured cables of all sizes as per site requirement and provide sand 16 cushioning of 75 mm thick layer around the cable and top protection with class B bricks, (the sand, bricksetc are in the scope of the tenderer). The trench to refilled back after laying of cable, ramming, levelling and watering the excavated area after laying of cable to bring the surface to original level as per technical specifications and site requirements.
Erection & labour work of supply, laying, testing & commissioning of 11/22 kv underground XLPE cable (XLPE cable will be supplied by DGVCL) with cable end termination & straight through jointing kit (to be supplied by contractor) on ARC basis under all scheme under PIPLOD sub division under Piplod Division as well as all Sub-division in jurisdiction under Piplod Division or within the jurisdiction of Surat City Circle.
surface after laying cable in trench. This will provide