Loading…
Loading…
6,420 results • Best match
CONSTRUCTION OF 10 NUMBER SUNDRY SHOPS INFRONT OF OFFICE BUILDING IN MMY OF HANGAL APMC
Steel Fabrication
Additional Works to ongoing BWCC Building at 10Th Cross Parsi Garden in Ward no.51(57) Rajmahal Nagar
Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/w...
Ramanathapuram Municipality Providing Animal Shelter for Abandoned Sick Aged and Weak Animals at Fathima Nagar
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding, grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Construction of ACB Police Station (G + 1) at Botad, Dist. Botad. [Including Electrification]
123 Fabrication, Supply and Installation of stainless steel (Grade - 304) 24.00 Rmt 911.03 Rupees Nine Hundred Eleven
Renovation of Inspection Bunglow Coochbehar under Coochebhar Division, WBSEDCL
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. (Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For trusses spanning up to 12.00 m
as per NIT
Supplying, fabrication and placing inposition of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in possition as per specification including cost of all materilas, lead, lift, labour, cost of binding wire etrc., complete as directed by the department engineer at site.