Loading…
Loading…
47,471 results • Best match
CONSTRUCTION OF ADDITIONAL CLASS ROOMS IN THE EXISTING ZPHS BALAJINAGAR (V) KAPRA (M) UNDER CORE URBAN REGION ECONOMY IN MEDCHAL MALKAJGIRI DISTRICT
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
CONSTRUCTION OF ADDITIONAL CLASS ROOMS IN THE EXISTING ZPHS MAILARDEVPALLY (V) RAJAENDERNAGAR (M) UNDER CORE URBAN REGION ECONOMY IN RANGA REDDY DISTRICT
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class rooms in the existing MPHS Chilakanagar (V) Uppal (M) under Core Urban Region Economy in Medchal Malkajgiri District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class Rooms in the Existing at MPUPS Mallapur, Balapur (M) under Core Urban Region Economy in Ranga Reddy District.
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class rooms in the existing ZPHS (Boys) Malkajgiri (V) Malkajgiri (M) under Core Urban Region Economy in Medchal Malkajgiri District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class Rooms in the Existing at MPPS Kuntloor, Abdullapurmet (M) under Core Urban Region Economy in Ranga Reddy District.
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class rooms in the existing MPPS Ring Basti (V) Quthbullapur (M) under Core Urban Region Economy in Medchal Malkajgiri District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class rooms in the existing PMSHR ZPHS Bourampet (V) Dundigal (M) under Core Urban Region Economy in Medchal Malkajgiri District.
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class Rooms in the Existing at PMSHRI ZPHS Ragannaguda, Abdullapurmet (M) under Core Urban Region Economy in Ranga Reddy District.
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class rooms in the existing MPPS Bourampet (V) Dundigal (M) under Core Urban Region Economy in Medchal Malkajgiri District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Additional Class rooms in the existing MPUPS Ahmedguda (V) Keesara (M) under Core Urban Region Economy in Medchal Malkajgiri District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Toilet block and Bath Rooms to TW AHS (G) Muduchekkalapally (V) Nallabelly (M) of Warangal District ( Reserved for ST Community as per GO 59, Dt: 21.05.2018)
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Strengthening of Additional Infrastructure Facilities to Existing KGBV Building at Laxmanchanda (V) Laxmanchanda (M) in Nirmal District under CBF
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Health Sub Center at Gopalraopet (V) of Ramadugu (M) in Karimnagar District
... complete but excluding cost of steel and it’s fabrication charges for finished item ...
Construction of TW Sub Division Office at Palvancha (V) Palvancha (M) in Bhadradri Kothagudem District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
CONSTRUCTION OF ADDITIONAL CLASS ROOMS IN THE EXISTING PHSHRI ZPHS NAGOLE (V) UPPAL (M) UNDER CORE URBAN REGION ECONOMY IN MEDCHAL MALKAJGIRI DISTRICT
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Repairs to Toilets & Bathrooms, Doors & Windows, Roof, Flooring, Over Head Tank and Compound Wall at Govt.BC Boys Hostel Laddagiri 1 (V), Kodumur (M) in Kurnool District
... complete but excluding cost of steel and it’s fabrication charges for finished item ...
Repairs to Toilets & Bathrooms, Electrification, Doors & Windows, Painting, Roof, Flooring, Over head tank and Compound Wall at Govt. BC College Girls Hostel, Pattikonda
... complete but excluding cost of steel and it’s fabrication charges for finished item ...
Residual works in Colony STP Plant of TNPL Unit I
Fabrication and erection of Plant feedline 160 mm HDPE Pipeline
Construction of twin walled poly carbonate solar greenhouse dryer at Poombuhar in Mayiladuthurai district
Greenhouse dryer structural fabrication:- Greenhouse dryer structural fabrication:- (AREA 1020 Sq.ft) Roofing ...
Construction of poly carbonate solar greenhouse dryer at Pazhayar
Greenhouse dryer structural fabrication:- Greenhouse dryer structural fabrication:- (AREA 1020 Sq.ft) Roofing ...
Maintenance of Hogenakkal to Natrampalayam (Existing Damaged BT) Forest road in Anchetty Range of Hosur Forest Division from km0/000-7/000 during 2025-2026
... site but excluding cost and fabrication of steel and including cost of formwork, ...
Balance work of Auditorium in Bhupalpally Municipality under Nagarabhivrudhi
... seignorage charges, cost of steel and its fabrication charges for finished item ...
Providing Toilets for Girsl and Dining hall in ZP High school for Girls Jayanagar Colony, Kadapa
... complete but excluding cost of steel and it’s fabrication charges for finished item ...
Repairing/Replacement of Gate at 04 No. bypass of Little Rangit Hydel Power Station and Carrying out other different type of works at 05 (Five) different Hydel Power Stations under MiniMicro Hydel Division, WBSEDCL, Kurseong
Fabrication & Supply of new brass bushing for gear pump shaft of oil pressure unit of governors of Unit# 1 & 2 as per sample at LRHP.
Renovation of DE system at TP-7 and Unit#3 Bunker under Capex 2025-26 at KTPS.
Fabrication, Erection & Painting
Shifting of 4000 GPM pump motor set at Jharna sump and shortening of delivery range of 4000GPM pump at 3rd patch due to increasing water level under Muraidih, AMP Colliery.
Fabrication of 10"dia M.S.tapper pipes for jointing in the delivery
MAINTENANCE OF TOILETS AND ALLIED WORKS WITHIN BOROUGH OFFICE PREMISES AT 11, BELVEDERE ROAD IN WARD 74
... WORKS??(2)Labour charge for fabrication and installation of composite... alloy aluminium sections, fabrications after cutting to proper ...
Shifting and erection of hydrogen peroxide tank from HWFL to CBP#2 in Pulp Mill Mechanical at TNPL Unit 1
Fabrication and Replacement of pump cum drive Motor bed in diffrent departments (Type - C/APP-1)
Construction of Bath Room Block to APTWRS for ST Girls at Vissannapeta (Kondaparva) of NTR District,Est.Rs:15.00 lalkhs
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of a compound wall at Gandhavaram(V), Chodavaram (M) of Visakhapatnam District.-STN
... CODE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING SEIGNIORAGE ...
Construction of Compound wall at Madambakkam Compost Yard ward No 70 at zone V inTambaram City Municipal Corporation
Supply and fabrication of steel using TMT & RTS bars with including cost and conveyance of all materials and including all labour charges etc complete
Construction of Compound wall at Madambakkam Old Compost Yard ward No 70 at zone V inTambaram City Municipal Corporation
Supply and fabrication of steel using TMT & RTS bars with including cost and conveyance of all materials and including all labour charges etc complete
Construction of Drainage and Culvert Arrangements at Ward No.28, Kamarajan Street in Karaikudi City Municipal Corporation.
Supplying and fabrication of steel for all RCC works including... wire and labour charges and fabrication and placing in position ...
Supply and erection of light weight steel roof structural sheet roofing for toilet blocks in TM#5 Plant area at TNPL Unit II
SUPPLY AND FABRICATION OF LIGHTWEIGHT STRUCTURAL MATERIALS SUCH AS MS ANGLES, ...
Construction of RCC Sluice culvert at Darika bund Right bank from AT Road to Dhaiali near Rajadhap.
Fabrication of shutter :- M.S. Plate 6 mm thickness for skin plate,frame for box type shutter.
06/EWC(G)/2026-27
Bus Isolator Structure - Fabrication of isolator structures 3.5mtr in height as per ...
Construction of New Toilets to 83 & 84 Secretariats at R&B Vambay Building (Sachivalayam Building) in 45th Division of RMC.
... complete but excluding cost of steel and its fabrication charges for finished item ...
Repairing and complete overhauling of 2000GPM capacity pump during monsoon for mines dewatering of mines at AKKOCP
Fabrication/casting and machining of 2 nos impeller (dia-490 mm )as per existing design
Construction of Bath Rooms and Toilets at PMS College Hostel (Boys)-1 at Rajahmundry of East Godavari District.
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of internal partition at the newly acquired area of Domjur CCC after shifting from old building to new Administrative building and Project Office at Domjur Administrative Building under Howrah II Division in the Dist. of Howrah
... requisite shape & size, fabrication including metal arc welding conforming to ...
CONSTRUCTION OF AGRICULTURE COLLEGE AT HUZURNAGAR (V and M) IN SURYAPET DISTRICT, TELANGANA
... practices but excluding cost of steel, its fabrication charges, centring, and shuttering ...
Construction of a tin shed and repair of the feeding trough at the Kanha Pashu Aashrya Sthal, Noorpur
Fabrication of Structure Steel angle and Channel including supply of all materials, labour and T&P etc. required for proper completion of work.
Modification to OHE in connection with Raising and Extension of PF @ NSG-6, HG-2 and HG-3 stations: KEY(PF 1&2), DST (PF: 1&2), LCR (PF1&2/3), TNGR (PF-1&2), KNNT (PF-1&2)
Erection of fabricated steel work other than masts by manual
MODIFICATION/SHIFTING OF 220KV D/C JODHPUR-CHB LINE (PRESENTLY CHARGED ON 132KV VOLTAGE LEVEL) FROM KHEME KA KUAN TO MUNICIPAL NALA USING 1200 SQ MM, 220 KV XLPE CABLE SYSTEM TERMINATING ON D/C MONOPOLE INCLUDING DETAILED ROUTE SURVEY, LAYING AND
Providing & fixing of steel fabrication made of angles, tees, square... including cutting welding and fabrication with printing coat of red ...
Construction of unfinished shops (9Nos) in Market Yard, Kanigiri of A.M.C, Kanigiri in Prakasam District
... complete but excluding cost of steel and its fabrication charges for finished item ...
Balance Works to Sri Vinayaka Swamy Temple at Fisherman Colony, Kuppam Municipality, Chittoor District.
... but excluding the cost of steel and its fabrication charges. a) Plinth Beam
Reconfiguration and revamp of the service interface through planned introduction of a structurally integrated overhead protection system and provision of protective enclosure at ML Store RAK Road Wadala First Shift Chowky Second Shift Chowky in FN
Fabrication of Purlin Square Hollow MS pipe 50mm x50mm 1.5-mm thckness
Repair and Maintenance of STP Mechanical and Electrical Systems in Nagapattinam Municipality.
Fabrication, erection and servicing of inlet gate shutter valve and screen conveyor chute including welding and allied works
Work of re Assembling of pipe line 6inch dia, 8inch dia delivery range near high well side at Jamunia patch of ABOCP Mine.
Cutting of "6" dia M.S pipe for fabrication of tapper, Bend and nipple etc (8nos.X 18.85")