Loading…
Loading…
47,455 results • Best match
Construction of Rail Flyover Between Multi Model Logistic Hub (MMLH) Dadri and WDFC New Dadri Station at Greater Noida Comprising of Earthwork in Formation, P-way, Rail Flyover, Bridges, Roads and other Allied Works including testing and commissioning.
... complete assembly to be of cast steel / fabricated structural steel, metal and elastomer elements complete ...
Chilled water line maintenance work in Energy Mechanical at TNPL Unit-1
Fabrication & Erection of 25NB CS SCH 80 Chilled Water Pipe line
Construction of Meeting Hall Shed with Dining Hall, Staff Rooms and Toilets beside the MLA Camp Office occupied by the Honble Minister at Husnabad in Siddipet District (2nd Call).
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
CONSTRUCTION OF INTEGRATED SCHOOL COMPLEX BUILDING IN THE CORE URBAN RESION ECONOMY AT SY.NO.323, TELLAPUR, RC PURAM IN SANGAREDDY DISTRICT
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
CONSTRUCTION OF ANGANWADI BUILDING IN BETAGERI-04 VILLAGE IN KOPPAL TALUKA
11 Steel Fabrication Supplying, fitting and placing ...
Widening from Intermediate lane to Two lane at km 0/0 - 4/700 and Strengthening at km 0/0 - 4/980 of km 109/6 of Dindigul Bangalore road to Seelakkampatti including Construction of culvert at km 1/10 (i), 1/10(ii), 3/2 (i), 3/2(ii), 3/6, 3/8, 3/10, 4
Supply and fabrication of steel Grade Fe-500D required for... schedule including cost of steel cost of fabrication labour charges for cleaning ...
REPAIR RENEWALS MAINT OF VALVE CHAMBERS SLUICE VALVES AND CI GI PUMPING MAINS AT AFA HYDERABAD
... mm x 1200 mm complete and fabrication of 3.15 mm thick MS Sheet ...
CONSTRUCTION OF INTEGRATED SCHOOL BUILDING FOR ZPHS (BOYS), KAMAREDDY IN KAMAREDDY DISTRICT
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Maintenance and Repairs to BC Community Hall in Kodavari Street, 18th division in RMC.
... complete but excluding cost of steel and its fabrication charges for finished item ...
Strengthening of Additional infrastructure Facilities for Existing KGBV at Kothakota (V) (M) in Wanaparthy District. (Under NABARD XXIX)
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Dormitory at AHS (B) Kagaznagar (V) of Kagaznagar (M) in Kumaram Bheem Asifabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Dining Hall to aHS (G) Modi (V) of Kerameri (M in Kumaram Bheem Asifabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Multi Purpose Center at Powerguda of Sirpur-U (M) in Kumaram Bheem Asifabad District ( Reserved for SC Community as per GO 59, Dt:21.05.2018)
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Multi Purpose Center at Boddiguda H/o. Eshwarnagar (V) of Indervelly (M) in Adilabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Multi Purpose Center at Kolamguda H/o. Ghanpur of Utnoor (M) in Adilabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Construction of Multi Purpose Center at Kamaipet (V) of Utnoor (M) in Adilabad District
... etc.,complete but excluding cost of steel and its fabrication charges for finished item ...
Deployment of Standby Power Facility for NICU and PICU at Dr. R. N. Cooper Hospital.
... specifications and approved fabrication drawings (which are to be... paint of 30 microns after fabrication including touching up with ...
Construction of Cement Concrete Drainage with Rcc slab at Rasipuram road to Jayankondan road near in Jayankondan pancahayat
Supplying and fabrication of steel including cost and conveyance ...
Under Missing link scheme, Replacement the conductor of 33 KV line (Raccoon to Dog) from 220/33 KV Tiloth to 33/11 KV S/s Dhanarigad for the evacuation of Solar Power under MSSY of EDD Uttarkashi
FABRICATION OF STEEL
Hanumankund ward me Abhaybila Kaushlesh kunj ke samne park ka sudhar ewam rang rogan ka karya As per NIT 23
mild steel for fabrication of grill and others
Work of Replacement of Bare Conductor by Covered Conductor of 11 kV Kaliyar Feeder under EDD Urban under EDC Roorkee
Fabrication of Steel
Construction of Strom water channal Retaining Wall at Kottai Vaikkal Old Karur Road to SS Kovil Pumping StationReachI in Ward No12 and North Andar Street Bw Butterworth road Channal in Ward No13
... site excluding cost and fabrication of steel but form work and centering ...
Construction of Strom water channal Retaining Wall at SS Nagar Channal From SS Nagar to Oyamari Madhura Garden Channal (From Sanjeevi Nagar Park Road to Nehru Street-ReachI in Ward No 15.
... site excluding cost and fabrication of steel but form work and centering ...
Installation of 250 KVA T/F at near Bami MandirC-15Naryan Vihar Shimla bypass, Near Munni CK C15 Turner Road, Near Oslinline chota Bharuwala, Near Capital Avenue C-19 Turner Road, LN 2 Sankriti Lok Colony Tuner Roadand LN5EIISanskriti Lok Colony
FABRICATION OF STEEL
Chitraghput nagar ward me cc sadak va nali nirman karya as par Nit 55
Mild steel for fabrication of grill and others
Providing Paverblock road from Jesintha house to Jefrome house at Ward no. 08 in Kanniyakumari Municipality
... site excluding cost and fabrication of steel but soft water labour charges ...
Construction of Compund Wall at Mini Stadium in Poovalambedu Panchayat Gummidipoondi Union
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Maintenance of tilled pole transformer structure at Under Jailcamp S/S EDSD Sitarganj II (O and M Head)
FABRICATION OF STEEL
Construction of Drainage at Seenivasapuram Amman kovil to Pillaiyarkovil in Puliyoorkuruchi
Supplying and fabrication of steel including cost and conveyance ...
Providing Paver Block Ramakrishnapuram Vadakku Street in Puliyoorkuruchi Panchayat
Supplying and fabrication of steel including cost and conveyance ...
Work of Replacement of Bare Conductor by Covered Conductor of 11 kV Bharat Gas Feeder under EDD Rural under EDC Roorkee
Fabrication of Steel
SHIFTING OF LINES AT KUNTI NAALA ON REQUEST OF IRRIGATION DEPARTMENT UNDER DEPOSIT HEAD
FABRICATION OF STEEL
Replacement of 33 KV bare line by AAAC covered conductor from Kothiyalsain to Pursari against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
FABRICATION OF STEEL
Replacement of existing 33KV ACSR Dog Conductor with 33 KV AAAC-AL-59,160 Sq.mm Covered Conductor at different work site from Narsurari to Chinka to Kothgi under S/s Rudraprayag in Electricity Distribution Division Rudraprayag.
FABRICATION OF STEEL
Construction of RCC Culvert at Venkataraman nagar 3rd main road in Ward no37 Zone-3
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complet
Increasing Capacity Installation of New DTR work of 08 No. Different DTR on Avas Vikas, Gandhi Park Feeder under 33/11 KV S/S Jaspur, EDSD(First), Jaspur under the Head of Capital (SI).
Fabrication of Steel
Construction of Strom water channal Retaining Wall at Rettai Vaikkal From Sanjeevi Nagar Main Road-Near Miawaki to Balaji Nagar Cross Street Reach I in Ward No 15
... site excluding cost and fabrication of steel but form work and centering ...
Construction of storm water drainage and 1.50m span culvert at Annamalaiputhur in Melamaruthappapuram Panchayat in Alangulam Union
Supplying and fabrication of steel including cost and conveyance ...
Construction of Compound Wall at Munneerpallam Panchayat Union Primary School in Munneerpallam Panchayat of Palayamkottai Panchayat Union
Supplying and fabrication of steel including cost and conveyance ...
Providing Drainage with cover slab 1 work in Ayapakkam panchayat Under CMDA fund Pac.VKM 07
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
Replacement of existing 11 KV ACSR conductor with 11 KV AAAC, AL-59, 99 sq.mm covered conductor from Dhruvpur to Padampur under EDD Kotdwar on semi-Turnkey Basis
Fabrication of steel
Construction of RCC Culvert at Venkataraman main road to rajeswari nagar in Ward no 37 Zone-3
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complet
Replacement of existing 11 KV ACSR conductor with 11 KV AAAC, AL-59, 99 sq.mm covered conductor from Simbalchaur to Padampur and Simbalchaur to Nimboochaur under EDD Kotdwar on semi-Turnkey Basis
Fabrication of steel
Replacement of existing 33 KV ACSR Conductor with 33 KV AAAC AL-59 241 sq.mm. covered conductor from Balbhadrapur to Dhruvpur under EDD Kotdwar on semiturnkey basis
Fabrication of steel
REPLACEMENT OF BARE CONDUCTOR BY AAAC AL-59, 99 SQ. MM COVERED CONDUCTOR AT 11 KV TIMLI FEEDER EMANATING FROM 33/11 KV SUB-STATION HERBERTPUR UNDER EDSD, HERBERTPUR UNDER EDD, VIKASNAGAR
Fabrication of Steel
Construction Of additional 11KV Line from 33/11KV S/s Guptkashi To Fata under Capital head on Semi Turnkey Basis
FABRICATION OF STEEL
Erection of poles in long span and in place of Root rusted or Tilted PCC Pole in different area of Kaulagarh Section, Dehradun.
FABRICATION OF STEEL
REPLACEMENT OF BARE CONDUCTOR BY AAAC AL-59, 99 SQ. MM COVERED CONDUCTOR AT 11 KV JAMNIPUR FEEDER EMANATING FROM 33/11 KV SUB-STATION HERBERTPUR UNDER EDSD, HERBERTPUR UNDER EDD, VIKASNAGAR
Fabrication of Steel
Erection of poles in long span and in place of Root rusted or Tilted PCC Pole in different area of Vasant Vihar Section, Dehradun.
FABRICATION OF STEEL
Ward Sabha Repair and Maintenance of Drain at Ward No 17 Pattikaranpalayam area in Karamadai Municipality
... site excluding cost and fabrication of steel but soft water labour charges ...