Loading…
Loading…
47,751 results • Best match
1 Construction of Cremation Shed Palayakottai in Palayakottai Panchayat at KOTTUR Block in Tiruvaur District Package No 1 KTR MLACDS 2026 27
Supplying & fabrication of steel including cost of steel, binding wire, labour charges etc complete
Vellore District Katpadi Block Construction of Mini Community Sanitary Complex Mini CSC at Primary Helath Center in Serkadu Panchayat
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc Complete
TNVPM-Vallam-Illodu-SBMG
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc.,
Service Contract for Overhauling of Mechanical system for Ash Handling plant of Unit-4 (500 MW) under AHP (MM-II) at SGTPP, WBPDCL.
Checking/replacement if required of drop pipe below each eco hopper & Fabrication & erection of adaptor below each Economizer hopper.
General Electrical Wor - Annual Plan-Vamanapuram BP 2025-26 Construction of Toilet Complex near Aliyad Swimming pool- Koliyakodu Division-Prj. No. 51/26 - Manikkal GP
90.14.1.2:Fabrication, supply, conveyance, installation... & complying to IS 8623. Fabrication of fully partitioned, dust... sheet alone be used for the fabrication. Angles/ flats/ slotted ...
various maintenance work of 11 KV and L.T. Lines in the area of EUTD-II, 11KV and L.T. Network, Aligarh
Fabrication of T-off Channel as per RESSPO Norms.
REPAIRING AND ALLIED WORKS OF CME(CIVIL) OFFICE BUILDING, UNDER BR -XI.
... WORKS??(2)Labour charge for fabrication and installation of composite... alloy aluminium sectios, fabrications, including cutting to proper ...
Providing Green Space Development Compound wall Foot Path Water Supply Arrangements Sitting Arrangements Street Light Arrangements at Valluivar Nagar Near Venthamarai Kulam in Minjur Town Panchayat in Thiruvallur District
... of simple vault tensile fabric work and Steel structure using Belgian make tensile polyester fabric, steel frames by ISO standard acclaimed ...
Inter-Connection for By-Pass line between Rising main and Delivery main line with supply and fittings of necessary mechanical (Water Supply) fittings at Ramkrishna Park Overhead reservoir in Ward No. 04, under Khardah Municipality
... 16mm. Thick ms plates incl. Fabrication of ms pipe of different dia. Cutting the plates, machine, fabrication of ms specials testing, ...
Special repairing with replacement of damaged AHU Cooling coil for Court Room No. 8 at Main building in Honorable High Court, Calcutta.
... M.S pipe with necessary fabrication for fixing with existing ...
Repairing Old Pontoon (9 Sets) and making of New Pontoons (4 Sets) for Installation During Monsoon in the Coal and East Section of Dudhichua.
Fabrication and Errection of dismental part of pontoon (Steel material are Provided departmentally) (Scope of work:-Damage part of all nine nos. of boxes to be fabricated accordingly)
Improvement of fortification at different locations in Dr. R. N. Cooper Mun. Gen. Hospital
... specifications and approved fabrication drawings (which are to be... paint of 30 microns after fabrication including touching up with ...
Repairing and Rewinding 165 HP, 1470 RPM, 550V CG make motor and Complete repairing and rewinding 40HP B.B. make 720RPM, 550Volt tapper shaft haulage motor at Madhaipur Colliery
Fabrication of fan cover with materials
Enhancement of compound wall fencing at various locations in Dr. R. N. Cooper Hospital
... specifications and approved fabrication drawings (which are to be... paint of 30 microns after fabrication including touching up with ...
Under Water Replacement of Upper Emergency sluice gate and T-guide of Dam at Matatila Dam in District Lalitpur
Fabrication, fixing and alignment of... machineries, divers etc. Fabrication, fixing and alignment of ...
Construction of Segregation Shed at Ramapuram H/O Ayilam Panchayat in Arcot Block
Provision for Square hollow section 25x25x2.6mm including fabrication in all labour charges in all etc
ONBOARD PIPING AND STRUCTURAL OUTFITTING WORKS SERVICE OPERATION VESSEL BY 166 (SOV)
Rate per kg for fabrication of chequered frame structure as per the scope of work
Prabhag kr.17 prabhagamadhil vividh thikani drainage line va concretikaran karane.
2.00 SHREE ABHI CONSTRUCTION AND FABRICATION (GSTN-27AVOPT9247P1Z9) BID ID -7385920 843709.000 -40.100 505381.690 Five Lakh Five Thousand Three Hundred and Eighty One
Construction of Segregation Shed at KathiyavadiADC H/O Kathiyavadi Panchayat
Provision for Square hollow section 25x25x2.6mm including fabrication in all labour charges in all etc
02/EDC(Ayodhya)/2026-27
Fabrication and Errection of Singal ...
Construction of Segregation Shed and Storage Shed at Labbapettai H/O Mangadu Panchayat in Arcot Block
Provision for Square hollow section 25x25x2.6mm including fabrication in all labour charges in all etc
Hadapsar-Manjari kshetriy karyalay antargat pr.kr.17 yethe swachha sarvekshan antargat yenarya sulabh shauchalayamadhye dekhabhal durusti vishayak kame karane.
1.00 SHREE ABHI CONSTRUCTION AND FABRICATION (GSTN-27AVOPT9247P1Z9) BID ID -7349791 352470.000 -27.500 255540.750 Two Lakh Fifty Five Thousand Five Hundred and Forty
Supply and Installation of Lantern house doors at Point Calimere and Muttom Point Lighthouse stations under chennai directorate.
... house door,Assembly related fabrication charges, Lifting, shifting, ...
MTPS I BM Unit IV Boiler AOH 2025 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Charges for fabrication of divider plate (both left ...
Miscellaneous Repairing work of bed frame 0f 03 nos. pump(i) 75HP SI no.WTP/75HP/02 (ii) 15HP SI.No WTP/15HP/02 (iii) 50HP SI.No.WTP/50HP/03 at Bilebra Filter Plant under Govindpur Area
Fabrication of base frame & fixing by we
Purchase of 1 Nos of 9000 liter capacity drinking water distribution vehicle on Heavy Vehicle chassis with cabin for East Zone of Coimbatore City Municipal Corporation.
Supply, fabrication and fixing of 9,000 litre ...
Purchase of 1 Nos of 9000 liter capacity drinking water distribution vehicle on Heavy Vehicle chassis with cabin for West Zone of Coimbatore City Municipal Corporation.
Supply, fabrication and fixing of 9,000 litre ...
Purchase of 1 Nos of 9000 liter capacity drinking water distribution vehicle on Heavy Vehicle chassis with cabin for South Zone of Coimbatore City Municipal Corporation.
Supply, fabrication and fixing of 9,000 litre ...
Replacement of damaged deck plate,channel, angles after top and bottom frame with idler and replacement of new conv. belt, driving tail, 02 nos. bend, pulley adapter shaft sleeve changing, guide channel arrangement, replcmnt f 304 B/c of KW
(d) Fabrication & erection of as above said work,
AMtc for Water Supply scheme Pataudi and Haily Mandi Town Connection between existing pipe line to increase pressure via 100mm id DI water supply pipe line in village Malikpur Block Pataudi Distt Gurugram
3.00 Shri Hari Fabrication (GSTN-NA) BID ID -1516831 109180.80 25.00 136476.00 One Lakh Thirty Six Thousand Four Hundred and Seventy Six
MTPS I BM Unit III Pressure parts Removal of deteriorated and peeled of Insulation and re insulation of Boiler burner corners and SADC with new insulation
Fabrication charges for as per PWD schedule of rate 2025-26,
BTPS-CHP-Regular maintenance and minor repair works of all mechanical equipment of stacker cum reclaimers-1 and 2 and preventive and breakdown maintenance of belt conveyors and conveyor equipment for BCN-8, BCN-9, Boom conveyors intermediate conveyors and tipper conveyors as and when required in MM-IV sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of utilization of work to 31.03.2027
... all types of scrappers, fabrication and erection of new scrappers, ...
Purchase of 1 Nos of 9000 liter capacity drinking water distribution vehicle on Heavy Vehicle chassis with cabin for Central Zone of Coimbatore City Municipal Corporation.
Supply, fabrication and fixing of 9,000 litre ...
Purchase of 1 Nos of 9000 liter capacity drinking water distribution vehicle on Heavy Vehicle chassis with cabin for North Zone of Coimbatore City Municipal Corporation.
Supply, fabrication and fixing of 9,000 litre ...
Providing New Emergency gate in Left Bank Canal Sluice of Bhadra Dam including repairs to Sill beam groove portion of Emergency Gate.
Design, fabrication, supply, erection and commissioning ...
T-06/EUDCB/2025-26
Fabrication & Erection of 11 KV Fuse ...
Rotation and Replacement with painting of Ash Disposal Line, BA, Silo slurry and BAOTP line of Unit-6 during upcoming OH under AHP-MM,STPS.
Fabrication & Erection of 300 NB MS/DRC/CI Bend/Enlarger
STREET LIGHT REPAIR
90.3.18.1:Supply, fabrication, conveyance and fixing the ...
NCTPS II M I circle - BM Division - 600 MW - Unit II - Attending annual overhaul works of rectification of corroded, eroded and damaged Economiser hopper duct structure area 4 Nosand Air preheater hopper duct structure area4 Nos during the year
Charges for fabrication and erection of MS structurals and patch up work. Charges including for T&P's and consumables. (Elevation -> 20 - 50 Mtr)
O and M of Barrage Gates
... includes design, supply, fabrication, assembly, wiring, testing ...
Tirupathur District - Provinding Existing Open well New 5.00 HP Motorpumpset with accessories at Veeraragavapuram in Somalapuram Panchayat at Madhanur Under Panchayat GF-2026-27
Supplying and fabrication of the following grill with flat steel including cost and conveyance and all charges etc complete.(Size 3.142*1.50*1.50 *14 Kg/m2 = 99.00 Kg
Structure repairs of gantry girders, realignment/ replacement and maintenance of gantry rails at Electric Loco shed, Ajni.
Supply, fabrication and erection of steel members... IS:2062 E250- Grade'B0'. Fabrication and erection to be as per ...
SUPPLY OF ECONOMISER COILS ALONG WITH DISMANTLING AND COMMISSIONING ON TURNKEY BASIS AT INTEGRATED HBL PLANT SUGAULI, EAST CHAMPARAN, BIHAR.
Dismantling, Fabrication, Erection, Alignment & Commissioning ...
Desilting open Channel in Kiskintha Road Near RTO Office in Ward no.52 in Zone-4
... as welding,grinding and fabrication charges, cost and conveyance ...
Construction of Bridge across the Dav River on Hayuliang Goiliang PWD Road (Gamliang) to Keletong (Span-50.00m).
Taking delivery of fabricated steel work from stacks at sitee... assembling and erection of fabricated steel structure to proper line level and ...
Construction of Bridge across the Dalai River on the Road from Hayulaing Chaglagam BRO Road (Chipru) to Kalabro, Span-80.00m
Taking delivery of fabricated steel work from stacks at sitee... assembling and erection of fabricated steel structure to proper line level and ...
Construction of Bridge across the Dalai River on the Road from Hayulaing Chaglagam BRO Road (Metengliang) to Khowegko, Span-80.00m.
Taking delivery of fabricated steel work from stacks at sitee... assembling and erection of fabricated steel structure to proper line level and ...
Construction of Two wheeler ROB/FOB between Varanasi - Prayagraj Rambag Section for 130 KMPH under Sr. DEN/III/Varanasi (Total = 19 Nos)
... vertical posts. Supplying, fabrication, assembling of all types... specifications. Note: 1. Detailed fabrication and erection drawings & ...
nstallation of 17 Nos New DT (03 Nos. 25 KVA), (08 Nos. 63KVA), (01 Nos. 100KVA) AND (05 Nos. 250KVA) Work at different places in the work area of (Assistant Engineer 11KV AND LT BKT) of 33/11 KV Substation, SADAMAU AND KUMBHRAWA
Fabrication, erection of sub-station ...
Installation of 16 Nos New DT (06 Nos. 63 KVA), (06 Nos. 100 KVA) and (04 Nos. 250KVA) Work at different places in the in the work area of (Assistant Engineer 11KV AND LT BKT) of 33/11 KV Substation, SADAMAU AND KUMBHRAWA
Fabrication, erection of sub-station ...