Loading…
Loading…
47,308 results • Best match
Upgradation of Electric and allied works of RSQ-6 by way of fabrication of modular kitchen and other allied works, Jammu. CNo-119 P (2nd Call)
Fabrication and erection of damaged MS pipeline from fresh water pond to fitter plant and replacement/providing of PVC/CPVC pipelines for ensuring uninterrupted water supply.
Fabrication and erection of damaged MS pipeline from fresh water pond to fitter plant and replacement/providing of PVC/CPVC pipelines for ensuring uninterrupted water supply.
Facility Management Services - LumpSum Based - Fabrication Eraction work related to boiler tubes of Texmeko Make Boiler; As per Tender Document; Consumables to be provided by buyer
Custom Bid for Services - Proposal for layout, fabrication, erection and commissioning of fire spray system for HFO tank 2 Similar Category AMC/CMC of Fire Extinguishers
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; FABRICATION AND ERECTION OF STORAGE SHED FOR SLUDGED OIL BARRELS AT NPM; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; FABRICATION AND ERECTION OF STORAGE SHED FOR SLUDGED OIL BARRELS AT NPM; Service Provider
Custom Bid for Services - HIRING OF SERVICES FOR FABRICATION AND INSTALLATION OF WATER PIPELINE FOR GARDEN AREA Similar Category Operation And Maintenance Of Water Supply Systems
Custom Bid for Services - HIRING OF SERVICES FOR FABRICATION AND INSTALLATION OF WATER PIPELINE FOR GARDEN AREA Similar Category Operation And Maintenance Of Water Supply Systems
Costruction of Inspection chamber, Desilting of well and Fabrication of MS Grill work and Supply ,delivery and Erection of 5.00HP submersible pumpset at Ward No. 12 Arasan Thottam Street in kancheepuram Corporation
Providing precast perforated slab using RCC 1:1/2:3 including moulding charges and steel fabrication charges.
Custom Bid for Services - Fabrication of Bearing shell of connecting rod for 3PP 300 Mud Pump of Rig ROM 50 I, MHN Asset Similar Category Repair and Overhauling Service Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Fabrication of MC Store rack arrangements along with installation of sunmica with illumination arragements Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Fabrication of MC Store rack arrangements along with installation of sunmica with illumination arragements Similar Category Repair
Custom Bid for Services - Repair & fabrication of ODP1 of GGS III Gandhar Ankleshwar Asset Similar Category Repair and Overhauling Service Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Fabrication and erection of Pontoons frames along with fitting of MS Barrels with departmentally provided MS angle, MS flat, ISMB, MS Barrels at Bhatadi OCM Chandrapur Area, WCL Similar Category Operation And Maintenance Of Electro-Mechanical Installations
Custom Bid for Services - Repairing and fabrication of damaged spares of 80LPS 200Mtr head pump of MKDIII OCM Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Fabrication of pump base frame and installation of pump along with all mechanical fittings at E&M, KOCP Similar Category Operation And Maintenance Of Electro-Mechanical Installations
Custom Bid for Services - Fabrication of pump base frame and installation of pump along with all mechanical fittings at E&M
Supply, Fabrication, Installation and testing of Ducting along with supports, insulation and all associated accessories for TL-3 and TL-10 in BARC(V) main campus, Atchutapuram near Visakhapatnam
... angle,channel and other structural sections for fabrication of filter frames. Preparation of fabrication drawings / site erection... weight of SS 304L used for fabrication.
Supply and Fabrication of 01 No. Street Light maintenance received vehicle (SKY LIFT) with 8-9 Mtr. working height on Tata Ace Intra Diesel B.S-6 Model
Supply and Fabrication of 01 No. "Street Light Maintenance received Vehicle (Sky Lift)" with 8-9 Mtr. Working height on Tata Ace Intra Diesel B.S-6 model.
Supply, Fabrication, Transportation, Erection and Commissioning of Gangway/ Walkway and Railing of Padampurnalla MIP in Padampur Block under Minor Irrigation Division, Padampur for the year 2025-26.
... PM Tender Title: Supply, Fabrication, Transportation, Erection ...
Fabrication (Casting, Machining), supply and fitting of 200mm size and 250 mm size cast iron coupling for skip, Tippler and all vertical section belt for Moonidih Project
... 03-Mar-2026 10:52 AM Tender Title: Fabrication (Casting, Machining), supply ...
Custom Bid for Services - Relocation of Machines from HMS Complex to CWS & New Fabrication Shops of Shops Complex Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - Relocation of Machines from HMS Complex to CWS & New Fabrication Shops of Shops Complex Similar Category Customized AMC/CMC for Pre-owned Products
Supply Fabrication Installation and Handing Over of Ladies Frisking Booths LFB for Phase I C1 and C2 Metro Stations of CMRL with One Year Defect Liability Period
... square tube (1"), including fabrication, welding, buffing, complete ...
In-house Fabrication work for Cryogenic LNG Fuel Tank of Gross Capcity below 1000 ltr at Dindori as per Scope of Work and Tender terms and conditions.
... PM Tender Title: In-house Fabrication work for Cryogenic LNG Fuel ...
Repairing, overhauling, testing and painting of various HT Field Switches and Starters and Repairing, overhauling and fabrication of 04 nos. HT Isolators at BWS (EnM), Amlohri Project.
cutting and fabrication of damaged side of body of lower portion and foundation of starters and switches by welding, cutting, grinding and drilling work
Supply and fabrication and erection of 450mm and 200mm and 150mm dia MS pipes and MS flanges etc at Kabela drainage pumping Station in Circle 1 area
PROVISION OF COVERED PVC BADMINTON COURT AND FABRICATION AND INSTALLATION OF OBSTACLE NO 10 FOR GTO GROUND AT SSB (KOLKATA) DIAMOND HARBOUR UNDER GE (I) (CGN) KOLKATA
DISMANTLING OLD SHED AND FABRICATION OF NEW SHED ROOF 20 WALL 20FIT X 20 FIT X 3 FIT SIZE FOR COAL DUMPING POINT AT SIJUA KATRAS AREA.
New shed Fabrication size (RooF 20 x 20 + Wall 20 x 20 x 3) 01 High Skilled + 02 Skilled + 04 Semi-skilled (1 x 502.44 + 2 x 434.96 + 4 x 329.96)
Fabrication of universal joint moving units and MS Bends of different sizes and repairing of Non Return Valve Sluice Valve required for monsoon 2026 at Krishnashila Project
Fabrication of universal joint/ moving ...
Repairing of chute and allied fittings by fabrication work for smooth coal handling at Mini CHP of Pit No. B and 2 under Pandaveswar colliery, Pandaveswar Area
Repairing of chute and allied fittings by fabrication work for smooth coal handling at Mini CHP of Pit No. B & 2 under Pandaveswar colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
FABRICATION, FITTING AND FIXING OF GRILL GATES AND FENCING AT THE BACK SIDE BOUNDARY WALL INCLUDING PAINTING OF SURROUNDING BOUNDARY WALL AT TARAMONI GHAT ROAD CAPSULE BPS.
Fabrication of shed at Ludlow Labour Line Imambara In Ward No 15 Under Uluberia Municipality within Booth No 189 of 176 Uluberia Purba A.C. Under APAS 20252025
Work Contract for Electrification of Control room of newly proposed Mundakanniamman Koil Street 33/11kV Indoor SS and Labour Transportation works of Breaker Fabrication and erection works
II-FABRICATION ADAPTOR
Construction fabrication of Milk Booth as per our drawing design and specification complete in all respect for milk unions of Haryana Dairy i e Milk Union Sirsa
Construction/fabrication of Milk Booth as per our drawing/design and specification complete in all respect for milk unions of Haryana Dairy i e Milk Union Sirsa
Fabrication of universal joints for floating pumps, repairing of NRV/Foot valve/ Sluice valves of different sizes , bends and strainers for Monsoon 2026 at Block-B project.
Fabrication/repairing of 8"/10"/12"... MS nut bolts required for fabrication /repairing of one number ...
FABRICATION WELDED BLASTING SHELTER CAGE 4 FT X 4 FT X 4 FT HEIGHT FOR FIRE PATCH A(SNR) AND (STG) PATCH B RUNNING UNDER GOPALICHAK COLLIERY.
CUTTING/STRAIGHTEN OF MS PLATE 6 MM SIZE AND STRAIGHTEN, CHIPPING AND FABRICATION 3 NOS SIZE 4FT/6FT
Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from return water to 27 meter level in Hydro Cyclone Section of Kathara Washery
Engagement of an Agency for Tableau Fabrication, Scenic Development n Logistics for VB-G RAM G tableau for 79th Independence Day Walk Past at Red Road, Kolkata
Engagement of an Agency for Tableau Fabrication, Scenic Development & Logistics for VB-G RAM G tableau for 79th Independence Day Walk Past at Red Road, Kolkata
Design, fabrication, supply, installation, testing and commissioning of outdoor front double door with canopy, weather proof (IP56) MV Panel and requisite cables at KINFRA Petrochemical park, Ambalamughal
Design Fabrication, Supply, Installation, Testing ...
Work of Designing, providing , Fabrication and installation of various types of Flex banners signage with MS Frame for Bakari Eid 2026 at various locations in Deonar Abattoir
Work of Designing, providing , Fabrication & installation of various types of Flex banners with MS Frame for Bakari –Eid 2026 at various locations in Deonar Abattoir.
Annual Percentage Rate Contract on MES SSR 2020 for Joinery, Glazing, Fabrication, Roof/Roof members, False ceiling, painting and other related works in filling area at OFK.
... 2020 for Joinery, Glazing, Fabrication, Roof/Roof members, False ...
ARRANGEMENT OF SHIFTING RAW MATERIALS AND SEMIFINISHED PRODUCT FROM ONE UNIT TO ANOTHER UNIT FOR PRODUCTION PURPOSE UNDER FABRICATION SHOP,OUTDOOR SHOP AND PAINT SHOP OF EWS.
FABRICATION AND ERECTION WELDING, ALIGNMENT, SUPPORTING, FLASHING, HYDRO TESTING, PRE-COMMISSIONING, HANDING OVER ETC. OF ABOVE GROUND PIPING PACKAGE-1 FOR PFCC-PROPYLENE RECOVERY UNIT, NREP, ASSAM
Fabrication and Installation of A/G piping works.For detailed work Item description refer (Item no.2.1;Above Ground Piping Works of Annexure-I To SP-1 of Document Id.TK-1P25A-MP-RFQ-0048)
MTPSI CA CWS II Unit III Fabrication Erection of Cooling Tower ID fan 1 gear box base frame channel base plate and its auxiliaries in CT III
Charges for fabrication of Gear box base frame channels, ...
SUPPLY, TRANSPORTATION, LOADING, UNLOADING, DISMANTLING, FABRICATION AND REFITTING OF AIR PREHEATER TUBES ON TURNKEY BASIS OF 110 TPH BOILER IN COGEN PLANT AT SUGAULI, EAST CHAMPARAN, BIHAR
SERVICE PART : DISMANTLING, FABRICATION AND REFITTING OF APH TUBES AS PER BELOW DETAILS AS PER ATTACHED TENDER DOCUMENTl
Fabrication and installation of cable entry boxes for Transformer, Switchgear and Starter Protection against moisture and unauthorised access to the manpower installed at Bokaro Colliery, BNK Area
Fabrication, supply & installation of ...
SUPPLY, TRANSPORTATION, LOADING, UNLOADING, DISMANTLING, FABRICATION AND ERECTION OF FLUE GAS DUCT FOR ON TURNKEY BASIS OF 110 TPH BOILER IN COGEN PLANT AT SUGAULI, BIHAR - 845456
1. Dismantling, Fabrication, Erection and Commissioning... ID fan) 2. Dismantling, Fabrication, Erection and Commissioning ...
Supply, fabrication, erection, modification, testing and alignment of deflector pulley in the conveyor belt arrangement of P-Q-R circuits of New CHP at Dipka Expansion Project.
Supply, fabrication, erection, modification,... Scope of Work: 1). Supply, fabrication, erection, testing of Deflector ...
FABRICATION, ERECTION, TESTING COMMISSIONING OF MECHANICAL PIPING(SS GI MS) FOR FOAM FEEDING THROUGH FOAM TROLLEY BANK AND ALLIED WORKS AT BHARATPUR TERMINAL UNDER RAJASTHAN STATE OFFICE.
FABRICATION, ERECTION, TESTING & COMMISSIONING OF MECHANICAL PIPING(SS/GI/MS) FOR FOAM FEEDING THROUGH FOAM TROLLEY BANK AND ALLIED WORKS AT BHARATPUR TERMINAL UNDER RAJASTHAN STATE OFFICE.
SUPPLY DISMANTLING, FABRICATION AND REFITTING OF IBR VALVES, BENDS, VENTS AND DRAIN PIPES FOR 110 TPH, 110 KG/cm2 BOILER ON DOOR DELVIERY BASIS AT HBL-SUGAULI
... Job includes (dismantling, fabrication & erection of related drain ...
JCRDLIS Phase II 4L Distributory System - Balance Civil works, Fabrication, Supply Erection of gates for Cross regulator at Km 12.65 of JCRDLIS, RS Ghanpur Reservoir of RFMC
Providing repairs and fabrication to the 2 Nos Static Compactors and change over system of Closed Compaction System at Garbage transfer station in Cheemalapalli Zone of GVMC
Providing repairs and fabrication to the 2 Nos Static Compactors and change over system of Closed Compaction System at Garbage transfer station in Cheemalapalli Zone of GVMC
Providing repairs and fabrication to the 2 Nos Static Compactors and change over system of Closed Compaction System at Garbage transfer station in Cheemalapalli Zone of GVMC