Loading…
Loading…
28,421 results • Best match
Fabrication and Erection of Additional Platforms and Structures at various locations at 2 X 660 MW Udangudi Supercritical Thermal Power Project, Tuticorin Dt, Tamilnadu
Improvement to Navyug School Vinay Marg under Education Wing. SH Design Supply Fabrication and Installation of Tensile Structure Shed at Navyug School Vinay Marg
Design, Supply, Fabrication & Installation of Tensile Structure, Supply of Tensile Fabric, with necessary accessories, Supply of Membrane with M-tex or eqivalent Fabric M 850 -opeque GSM, support MS structure with MS column 139mmX thickness 3.5 mm , Outer Frame pipe 76 mm X thickness 3mm, arch pipe Truss Section pipe 60 X 2.5 mm thick, base plate 200 X 200 & thickness 8 mm, Foudation Boalt , MS Purling pipe tyrod ,Aluminums flat bar, zinc primer then painting with Deco Spray etc. , waterproof Membrane double sided coated all complete as per the satisfation and direction of Engineer In Charge. The area of shed shall be measured for payment.
FABRICATION OF WATER CHAMBER
FABRICATION OF WATER CHAMBER (RIGHT SIDE) TO DRG NO.- 01602370025, VAR-00, REV-07, ASSY OF ALL ITEMS AS PER MID-411750200 (EXCEPT MID ITEM # 15). QTY- 02 NOS.
Fabrication of Bulk Head
FABRICATION OF BULK HEAD AS PER DRG. NO.- 12025122501 REV.00 ASSY. OF ITEM NO.- 01 TO 05.
Fabrication of MS expander
Fabrication of MS Expander of 500x600 mm dia and 1.5 mtr long , work includes marking and cutting of 10 mm MS plate , Bending , rolling and aligning edges and welding on inner and outer side of pipe and making its edges smooth also fabrication of MS flange(25 mm thick) and stiffners as per drawing provided and direction of engineer- in -charge including all cost of labour and T&P required for proper completion of work for Koda pump canal, Fatehpur.( MS material will be provided by department).
Fabrication of MS REDUCER
Fabrication of MS Reducer of 700x600 mm dia and 2.5 mtr long , work includes marking and cutting of 10 mm MS plate , Bending , rolling and aligning edges and welding on inner and outer side of pipe and making its edges smooth also fabrication of MS flange(25 mm thick) and stiffners as per drawing provided and direction of engineer- in -charge including all cost of labour and T&P required for proper completion of work for Koda pump canal, Fatehpur. (MS material will be provided by department)