Loading…
Loading…
28,233 results • Best match
Supply, Fabrication and Erection of GI steel structures, earthing materials, etc., for establishment of Edaicode 110KV SS
Labour, machinery consumables for the Fabrication for steels structures
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in Crusher house,conveyor 8C,9C,10C,11C,1C and 2C in CHP Phase-I and Phase-II
Fabrication and erection of structural in RB#3 and new evaporator in SRP Mech at TNPL Unit -1
Fabrication and erection of Light Structurals (GEN)
In situ fabrication and erection of stainless steel and carbon steel outdoor storage tanks including supply for KKNPP 5and6 units and AFR facility
In-situ fabrication, erection and assembly of Desalinated water storage tank (00 UGX10BB002) of 2000 CUM capacity made up of Stainless steel which includes preparation & submission of fabrication drawing, supply of raw material, preparation of IMIR, de-preservation, storage, handling, marking, cutting, bending, rolling, drilling, tapping, threading, in-situ assembly at location, alignment & welding using GTAW / SMAW process (Including supply of filler wires and electrodes), carrying out inspection and fill testing of the tank as per approved procedure, carrying out painting/passivation on inside & outside of the tank and secondary concreting as per drawings and technical specification. This work also includes supply and installation of all accessories as specified in drawing, datasheet/ specifications such as pipe & pipe fittings, flanges, relief valves, earthing lugs, davits, reinforcement pads, external & internal Ladders/ stairways, platforms, Hand railings, stiffeners, fasteners, gaskets etc., supply of spares, arranging necessary plant & machineries, tools & tackles, welding consumables, cleaning consumables, argon gas of required purity, scaffolding, preparation of WPS, PQR, work procedures, JHA, QAP, erection reports, CCC, material accounting and submission for acceptance.
Custom Bid for Services - FABRICATION OF NEW STORAGE UNIT FOR 21 BASSCA SET AND FABRICATION HEAVY DUTY METAL HANGER Similar Category Hiring of Agency for Achieving Climate Action Targets
Custom Bid for Services - FABRICATION OF NEW STORAGE UNIT FOR 21 BASSCA SET AND FABRICATION HEAVY DUTY METAL HANGER Similar Category Hiring of Agency for Achieving Climate Action Targets
Fabrication of Structural Garland for diversion of water seepage from Vertical Shaft at Katghodi, East Block of Churcha Mine (RO).
Provision of Strctural Garland for diverting heavy downpour of water in the Vertical Shaft Scope of Work : 1. Fabrication of Structural Garland with the use of 3.15 mm MS Plate with 2" GI Pipe Nipple 2. Fitting of Stuctural MS Garland in the Shaft 3. Fitting of 2 1/2" Hose with fitting to divert seepage of water 4. Funnel Installation in the Shaft and it will entirely depend on the water leakage points 5. Roof is babricated to Hold back soil and prevent blockage of water flow. Roof will be fabricated by 3.15 mm thick MS Plate and should be fixed to the upper side of Funnel 6. Funnel and Roofs should be fixed by Anchor Bolts Note : 1. Matereal i.e. 3.15 MS Plate, 2 1/2" Hose Pipe and Cement Capsules are to be provided by SECL