Loading…
Loading…
28,233 results • Best match
Fabrication of stainless steel ladder inside the intake well at Dhanikhari Dam
Providing and fixing stainless steel ( Grade 304) railing "situated inside of intake well of Dhanikhari Dam by lowering the working staffs from level 66.00 mtrs. to level 45.00 mtrs with providing safety gier , hanging arrangement by pully and rope support , oxygen support and all other necessary safety arrangement" made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-incharge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).
Supply, Fabrication and Erection of GI steel structures, earthing materials, etc., for 33kV Intro at Pasumalai 110kV SS
Labour, machinery consumables for the Fabrication for steels structures
Dismantling, fabrication and erection of steel structure work of A side grizzly in PCH Section of Sawang Washery.
Fabrication, Dismantling and Erection of corroded Structural in Pipe rack at CLO2 Plant at Pulp Mechanical in TNPL Unit1
Fabrication, Dismantling & Erection of corroded Structural in Pipe rack at CLO2 Plant at Energy Mechanical in TNPL Unit1
Maintenance and Fabrication of 1 Nos. of Structural Shed at Hirakhand Bundia Mine under Rampur Subarea of Orient Area
Maintenance and Fabrication of 1 Nos. of Structural Shed at Hirakhand Bundia Mine under Rampur Subarea of Orient Area
Fabrication of steel structure (Transformer Stand) 06 Nos. for installation of Transformer at Mine place at Jarangdih Colliery.
Structural steel work riveted bolted or welding in built up sections trusses and framed work including cutting hoisting fixing in position and applying a priming coat of approved steel primer air complete. Without materials only labour charge & fitting charge. (04 Nos)