Loading…
Loading…
788 results • Best match
SUPPLY OF AERIAL FIRE FIGHTING EQUIPMENT
Description Aerial Fire Fighting Equipment is an add on system to helicopter for emergency fire fighting operations. Fire fighting equipment shall be operated in fresh water, sea water and chlorinated pools. The equipment shall be designed to perform fire fighting operations by lifting a collapsible fire fighting bucket suspended to the cargo hook of the helicopter by means of lifting and dumping water or fire retardant chemicals. Fire fighting bucket shall be collapsible with multiple drop pattern valve. The multiple drop capability shall allow an operator to split the bucket load over several locations. The valve shall be opened & closed partially or fully and there shall not be any limit to the number of times it can be opened or closed. The fire fighting equipment shall have the option for fitment of Foam Injection System (FIS).FIS shall be attached to bucket such that foam chemical shall be clear of helicopter.FIS shall deliver a timed volume of foam to the water within the bucket. Types of fire (viz.class A,B,C,D,F & fire caused by electrical equipment etc.) that can be extinguished using foam,foam and water combination shall be specified.Vendor shall specify the following • Different type of chemicals apart from water & foam. • Minimum flying height over fire zone to protect bucket, sling system & its components. • Temperature limit for components of AFFE which are suspended to the cargo hook viz Bucket,cargo sling system,compressor,pneumatic lines, electrical cables etc. over the fire zone. • Max flying speed that AFFE is designed for( with full load & no load in bucket). Fire Fighting bucket shall provide bucket filling through rapid dip filling method and filling with the Shallow Fill Pump(SFP). The pump shall be fitted internally (desirable) within the bucket. Aerial fire fighting operation shall be performed either by cockpit or cabin crew by means of control pendent one each provided in cockpit & cabin. Aerial Fire Fighting Equipment shall be equipped with Load Indication System(LIS). The same shall provide continuous monitoring and display of the water load in the cockpit & cabin pendants. There shall be a provision on LIS to interface LIS with helicopter display system. Aerial fire fighting operation shall be performed either cabin door in open or closed condition.During cabin door open condition, operation of AFFE shall be performed by cabin crew by means of control pendent provided in cabin. During cabin door closed condition, operation of AFFE shall be performed by cockpit crew by means of control pendent provided in cockpit. UH-M will be equipped with Electro Optical (EO) system. The EO video will be available on MFDs. In cabin door closed condition, EO video will be used by the pilot/co-pilot to view / locate the fire zone to dispense water from AFFE. Permanent looming/patch cord shall be provided on helicopter for AFFE operational requirements with cabin door closed condition. Necessary electrical harness and pneumatic lines connecting power pack and bucket respectively shall be provided by the vendor. Electrical power for operation of the system shall be independent of helicopter power. Fire fighting equipment shall be easily jettisonable in case of emergency situations. The bucket shall be connected to the Power Pack by a breakaway plug. The purpose of the plug is to offer a clean “breakaway” if the bucket needs to be jettisoned from the aircraft in an emergency. The bucket will be suspended from cargo hook and the power pack shall be strapped/mounted on the floor of the helicopter. Characteristics • Water filling time: Max 7 sec. • Water discharge time: Max 7 sec in continuous discharge method. • Flight speed with aerial Fire Fighting equipment: Upto 55 Kt
1. TOURIST DEVELOPMENT OF VISHWAMITRA PLACE, VISAUL, LOCATED IN HARLAKHI BLOCK UNDER MADHUBANI DISTRICT.
69 9.147B Providing and fixing factory made uPVC white colour fixed glazed windows/ ventilators comprising of uPVC multi-chambered frame and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), , uPVC extruded glazing beads of appropriate dimension, EPDM gasket, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. 0
FINALIZATION OF RATE OF ITEMS IN SECURE SOFT ICW EXECUTION OF SCHEMES UNDER MAHATMA GANDHI NREGA IN COOCH BEHAR DISTRICT
Non-Asbestos fibre (high impact poly propelene reinforced) cement ventilator curves
Construction of 220KV D/C Transmission Line from PMTL, Chandauti to IMC ,Dobhi (RL - 22.9 KM ) with ACSR Zebra Conductor along with Construction of 02 nos. 220KV Line Bays at Chandauti PMTL Substation on Turnkey basis.
32 Providing and fixing factory made uPVC white colour casement/ Casement cum fixed glazed door comprising of uPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll formingprocess of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, zinc alloy (white powder coated) 3D hinges and one handle on each side of panels along with zinc plated mild steel multi point locking having transmission gear, cylinder with keeps and one side key, G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws, etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealent shall be paid separately). Note: For uPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable.Casement door with top hung ventilator with 3D and S.S. friction hinges (400 x 19 x 1.9 mm) made of (big series) frame 67 x 64 mm, sash 67 x 110 mm & mullion 67 x 80 mm all having wall thickness of 2.3 ±. 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. sqm 4.68 4.68 0.00 0.00 0.00 0.00 0.00 0.00
RUGGEDIZED AMLCD HEAD ASSEMBLY
3 Part – B: IPR Clause for indemnification of HAL in case of Infringement of Third Party IPR: a. HAL shall have the right to use the Supplies/Services procured under the contract that may contain any Intellectual Property/ Intellectual Property Rights. Vendor shall indemnify and protect at its own cost, HAL in respect of cost/claims/ liabilities (including attorney’s fees) arising from any violation of Intellectual Property Rights of any third party with respect to Supplies/Services provided by Vendor. If HAL or HAL’s customer/s are unable to put to use the Supplies/Services or a portion thereof as a result of violation of the Intellectual Property of any third party, Vendor shall within reasonable time at Vendor’s own cost either, i. procure for HAL and HAL’s Customer/s the right to continue using the Supply/Service or, ii. replace or modify the Supplies/Services so that it becomes non-infringing or, iii. compensate HAL the amount equivalent to the cost of supplies procured/ to be procured, development cost already paid to Vendor and damages suffered by HAL arising due to inability to put to use the supplies/ services or a portion thereof. Intellectual Property for the purpose of this clause includes inventions, discoveries and improvements; know-how, works of authorship, technical data, drawings, specifications, process information, reports and documented information; and computer software(including without limitation, source code, object code, source code listings and object code listings that would enable the software to be reproduced or recreated), topology of integrated circuits, databases or any other such results of intellectual activity.
Supply of GNSS NAVIC
52.iii c) Seller shall indemnify and protect at its own cost, HAL in respect of cost/ claims/ liabilities (including attorney’s fees and associated costs of legal proceedings) arising from any violation of Intellectual Property Rights of any third party with respect to supplies/ services provided by seller. If HAL or HAL’s customer/s are unable to put to use the supplies/services or a portion thereof as a result of violation of the Intellectual Property of any third party, Seller shall within reasonable time at seller’s own cost either, i. Procure for HAL and HAL’s customer/s the right to continue using the supply /service or, ii. Replace or modify the supplies/ services so that it becomes non-infringing or, iii. Compensate HAL the amount equivalent to the cost of supplies procured /to be procured, development cost already paid to seller and damages suffered by HAL arising due to inability to put to use the supplies/ services or a portion thereof.