Loading…
Loading…
677 live585 closing this weekmost from Karnataka Forest Department and E-IN-C BRANCH - MILITARY ENGINEER SERVICES
677 results • Best match
CONSTRUCTION OF DISTIRCT LEVEL MULTIPURPOSE STADIUM, IN DIST. SURAJPUR (C.G.) ( DEPOSIT WORK). (Without Escalation and Bonus)
Providing and planting following herbs in garden including preparation of soil, base plantation, providing and spreading different fertilizers, soil and sand: Carpet grass (well developed)
DEVELPOMENT OF CITY CENTER AT KAVARATTI ISLAND LAKSHADWEEP
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserviceable material’s as per direction of officer in charge (excluding cast of plant & water) (A) Shrubs :
RENOVATION OF STATE GUEST HOUSE (CIRCUIT HOUSE) BUILDING, DEHRADUN, UTTARAKHAND
Suply and plantation of 90 centimeter FICUS VIRENS Ornamental Trees excavation of pit, providing manure and watering and caring for one year as per directions of Engineer-Incharge.
DEVELOPMENT & BUTIFICATION & CONSTRUCTION WORK OF KHARUN RIVER FRONT I/C. ELECTRIFICATION WORK AT DISTT. RAIPUR.(DN. NO.1, RAIPUR).
... preparation of soil, base plantation, providing and spreading ...
CONSTRUCTION OF D.I.E.T. BUILDING AT SURAJPUR. (Deposit work- without escalation and bonus)
... preparation of soil, base plantation, providing and spreading ...
Constuction of Annex Head Office Building for Canara Bank at Manyata Tech Park, Bengaluru
V TREE PLANTATION 7,87,916.00 - 7,87,916.00
Construction of 620 Capacity Atal kala Bhawan in Madhubani District for the year-2026-27 (With electrification work)
11 Landscape & Horticulture works 1856016.00 Fiurniture 25241093
Construction Work of C.M. Model Composite School Pre Primary to Class 12th at Village Harnathpur Kota Block Simbhavli in District Hapur
HORTICULTURE Clearing jungle including ...
Construction of New B.Ed. College at DIET Campus, Patan (Remaining Work) (2nd Attempt)
114 160.00 Plantation of tree in soil incl. digging 45x45x45cm size
Construction of 4th BG Line from Itarsi (Km 745.130) to Bina (Km 982.130) including Earthwork, Tunnels, Bridges, Road over Bridge (ROB), Road under Bridge (RUB), station buildings, track works, Electrification, Signaling & Telecommunication works, and allied miscellaneous works in connection with Itarsi - Bina 4th Line Project under West Central Railway in the State of Madhya Pradesh.
Item Breakup - A7-Horticulture
“Providing, Supply, Repairing and maintenance of Infrastructure Work and Other Road Amenities at Various Locations of Nava Raipur Atal Nagar,Dist. Raipur (C.G.).”
... through water tanker of Horticulture features i.e. lawn, tree, ...
CONSTRUCTION WORL OF TRANING CUM EXHIBITION CENTER WORK AND ELECTRICAL WORK AT LAXMAN BAGH, KANPUR UP
Plantation of Trees, Shrubs, and Hedge ...
Construction of New Sangeet Mahavidyalaya Building at Raigarh. i/c W.S.S.F. Electrification & Approach Road Works.
... preparation of soil, base plantation, providing and spreading ...
Construction of Prayash Residential School at Distt. Raigarh. (DEPOSITE WORK) (Without Escalation and Bonus)
Providing and planting following herbs in garden including preparation of soil, base plantation, providing and spreading different fertilizers, soil and sand 22.25.1 Hedges
Development of Water Supply Scheme Tube wells, rising mains, OHTs, Distribution System, House Service Connections including Allied Works with 2 years O and M at Rudrapur Town.
... Gate at start of stair, Landscaping, lightning arrestor with ...
Construction of Working Women Hostel Building at Raigarh. Distt. Raigarh.
... preparation of soil, base plantation, providing and spreading ...
Work of Construction of Intermediate CWPH at Kotra Baseri laying of Clear Water transmission main From Kotra to Naroli Nadbai via junction 2 at Naroli IPS Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli and Bhiwadi based on HAM model under JJM
Horticulture Work
CONSTRUCTION WORK OF INCOMPLETE BUILDING AND EXTERNAL DEVELOPMENT WORK AT GOVT. GIRLS INTER COLLEGE , MANIKPUR DISTT. CHITRAKOOT
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cost of plant & water)
Construction of office building and laboratory at various CPC sites
LANDSCAPING & HORTICULTURE
Construction of office building and laboratory at various CPC sites
LANDSCAPING & HORTICULTURE
Redevelopment of Geetanjali Lodge at Agartala.
Bill No. XIII: Horticulture
CONSTRUCTION OF 750 SEATER AUDITORIUM AT AMBIKAPUR
... preparation of soil, base plantation, providing and spreading ...
Renovation and Up-gradation of District Sports Complex Panchot, Dist - Mehsana
Lawn plantation : Grassing with selection No.1 Doob grass In rows 5 cm apart in both directions including watering and maintenance of the lawn for 3 months or
Construction of Integrated Command and Control Center at CMWSSB Head office Chintadripet Chennai
Bill No.9 LANDSCAPING
Work for Construction of Water Treatment Plants CWRs and CWPHs Near WTPs Clear Water transmission main From WTP various IPSs Laying of Rising mains to different ESRs Construction of ESRs Distribution system in villages providing FHTCs Including
Horticulture Work
Work of construction of CWR and Block CWPH at various locations for clusters laying of transfer main from block PS to block CPS rising main from block CPS to Block ESRs, construction of ESRs laying of cluster distribution mains CABP Pck 3 under JJM
Horticulture Work
Appointment of a Master Planning, Design and Tender Consultancy Agency for Planning and Development of an International Standard Hockey Stadium at Bhat, Gandhinagar
landscaping, circulation networks, spectator and athlete facilities, parking, media and broadcast facilities,