Loading…
Loading…
225 results • Best match
SITC of Air Conditioner machine at Deputy CMOH - II office, Howrah.
Supply & Installation of Extra Add - on items - HVAC grade 5/8" (for suction) & 1/4" (for discharge) copper refrigerant pipe with 9 mm thick nitrile rubber insulation including shaddle, screw, insulation tape, fastner etc for above AC machine as per direction of EIC.
Construction of Biosafety level (BSL) -3 Laboratory for NCDC at AIIMS Nagpur, Maharashtra on Engineering, Procurement and Construction (EPC) basis
BSL-3 Laboratory Buidling with BSL-3 , BSL-2 and other lab works Specialized equipments, systems and works for BSL-2, BSL-3 and other Lab Specialized Works High Containment laboratory work in NCDC BSL-3 Building shall include specialized internal walls, ceiling and finishing works i/c aluminium coving, door, floor coving, self levelling epoxy flooring, HVAC works including HEPA filters works BIBO/containment housing, Electrical Works, Containment barrier double door autoclave with bio-seal, Effluent decontamination system, Building and Lab management system, CCTV system, Access Control system, Walk-thru-shower system + BLED room, Laboratory work stations, modular laboratory work stations, Double door class 100 dynamic pass box, biosafety door for transfer/decon air-lock and showers, Double door autoclave, compressors, dunk tank, Ventilated type garment storage cabinet, garment storage lockers, Effluent decontamination system for BSl-3 lab 2 nos 750 litre each (1W+1S) with steam boiler and accessories, Water treatment/softening plant, VHP pass Box, Eye-wash stations, Lockers, Biosafety Cabinet Class II Type A2, 6 Feet, HEPA H14 Filter, 415V AC etc and associated works including handing over, validation and certification from Department of Bio-Technology (DBT)// Department of Health Research (DHR) complete as per scope of work and directions of Engineer In charge.
Construction of Biosafety level (BSL) -3 Laboratory for NCDC at Kasturba Hospital, Mumbai on Engineering, Procurement and Construction (EPC) basis
BSL-3 Laboratory Buidling with BSL-3 , BSL-2 and other lab works Specialized equipments, systems and works for BSL-2, BSL-3 and other Lab Specialized Works High Containment laboratory work in NCDC BSL-3 Building shall include specialized internal walls, ceiling and finishing works i/c aluminium coving, door, floor coving, self levelling epoxy flooring, HVAC works including HEPA filters works BIBO/containment housing, Electrical Works, Containment barrier double door autoclave with bio-seal, Effluent decontamination system, Building and Lab management system, CCTV system, Access Control system, Walk-thru-shower system + BLED room, Laboratory work stations, modular laboratory work stations, Double door class 100 dynamic pass box, biosafety door for transfer/decon air-lock and showers, Double door autoclave, compressors, dunk tank, Ventilated type garment storage cabinet, garment storage lockers, Effluent decontamination system for BSl-3 lab 2 nos 750 litre each (1W+1S) with steam boiler and accessories, Water treatment/softening plant, VHP pass Box, Eye-wash stations, Lockers, Biosafety Cabinet Class II Type A2, 6 Feet, HEPA H14 Filter, 415V AC etc and associated works including handing over, validation and certification from Department of Bio-Technology (DBT)// Department of Health Research (DHR) complete as per scope of work and directions of Engineer In charge.
Appointment of Project Management Consultant (PMC) For Construction of Cyclotron & Nuclear Medicine Building Including Radiation Bunker and Associated Infrastructure at GCRI
9. Supervision of Associated All Services (Plumbing, Electrical, ELV, Fire Fighting, Lift, HVAC)
Replacement of 4 Nos existing AHUs with new AHUs having combination of chilled water DX type coil for O Ts at Advanced Eye Care Centre PGIMER Chandigarh
Supply, Installation, testing and commissioning including vaccumiazation and Nitrogen testing of following nominal sizes of soft / hard drawn copper refrigerant piping for HVAC system, complete with fittings ,with suitable adjustable ring type hanger supports, jointing / brazing including accessories, insulated with XPLE Class-O tubular insulation with Class-O closed cell elastomeric nitrile rubber tubular sleeves section so specified thickness as given below for Suction and Liquid lines, all accessories as per specifications etc. as required :
CWE/CHM(U)-140/2025-26 REPAIR AND MAINT OF CENTRAL AIR CONDITIONING SYSTEM OF CAPACITY 5 X 225 TR, 2 X 48 TR AND 3 X 50 TR INCLUDING LT PANELS, LT CABLES, HEATING SYSTEM, AHUs, FCUs AND DUCTINGS INCLUDING ALL CONNECTED ITEMS AT COMMAND HOSPITAL (WC)
Opening of AHU coil, supply duct & return duct , diffusers, grills, damper and any other installed component that part of the AC plant & duct of connected Area of Command Hospital (WC) Chm. All above part should be cleaned with following procedures and equipment :- Note : Cooling area will be taken for paymet purpose. (a) Vaccums collection : probably the most important component as this ensures that there is no cross contamination in plant premises. The units in use are equipped with a HEPA filter and high static fan. (b) Rotary brushes system self-propelled type with different types of brushes and used to agitate and loosen dirt with the duct. (c) Viper set used again to loosen dirt depending upon the type & size of duct. (d) Contact vacuuming method of HVAC system cleaning which incorporates agitation and vacuum collection principles into one operation. (e) Compressed air washing mechanical means to agitate and dislodge particulate from the interior surfaces of HVAC system. (f) Robotic camera used for inspection before, during and after the cleaning process. The video certified the duct clean and assist during cleaning. (g) All of the grill and differs are removed and cleaned. (h) Foam core boards are placed up to supply vent openings. The air movement holds these boards up to the openings, This also increases the air movement in the duct. All but one supply vent is covered. The open supply vent allows for the air to safety flow backward through the air duct system without creating adverse negative pressure.