Loading…
Loading…
226 results • Best match
IPGMER-SSKM Hospital - Providing Fire Check Doors, Sealing of Electrical Ducts and M.S. Structural Stair case as per Revised Fire Safety Recommendation of Trauma Care Centre , New OPD Bldg. Sports Medicine Bldg. and BIN New OPD Bldg.with other allied
FIRE DOOR AND RELATED ITEMS Sealing of Electrical Shaft, ELV, Plumbing, Fire duct floor opening by supply & application of 50 mm thick FISCHER Fire Stop Mortar or equivalent specially formulated gypsum based compound (Consumption @ 40 kg/Sqm dry weight) over Mineral Wool backing surface which when mixed with water can be trowelled or poured around service penetrations in either vertical or horizontal applications. Tested to BS 476-20, IS 12458 standard, NBC2016 FFSC can provide 2 hours integrity and insulation. it has been design to set within 30-45 Min depending on ambient temperature, and is capable of accommodating foot traffic within 72 hours. Formulated to be halogen and asbestos free the FFSC exhibits excellent load bearing capacity and can be help to maintain the sound reduction index of a structure. All peripherial contact of pipes, cables, HVAC ducts shall be sealed with a joint filler FiAM intumescent sealant (For metal pipes, upto 25 mm PVC pipes, Cables)/ (FiGM/UFS310) intumescent sealant (For insulated HVAC Duct)/FiPWE2 intumescent graphite based synthetic wrap strip (For above 50 mm dia PVC pipes) (Cost of sealent & pipe wrap to be paid seperately). To be installed in accordance with the detailed instructions or the approved system at all level & floor inclusive of all materials, labour, tool & tackles, and backing arrangements etc all complete as per direction of Enginer-in-Charge. (Load Bearing Solution for floor upto 200 Kg/opening) Backing materials details are as follows- 8mm Dia ISI TMT Bar (spacing @ 200mm c/c) with Anti Corrosive Paint (Red oxide) (including charges of drilling, fixing in position, painting, grouting but excluding cost of renforcing bar), Consumption of reinforcement - 5.3 kg/Sqm. GI Welded wire net of 30 sqmm Mesh should placed over Rebar structure. Mineral Wool of 64 Kg/cum density, 50 mm thick to be placed over GI welded wire net.
Electrical work of Redevelopment of Pali-Marwar Railway Station of North Western Railway.
should be available, contrast ratio: 1200:1, OPS slot, viewing angle (H/V): 170°/ 170°, response time less than 12ms, Display control shall be on monitor screen and programmable with remote (remote shall be supplied with system), Key Board, Optical Mouse, etc. as required. a. 32 Inch a 2.00 Numbers 398425.82 796851.64 AT Par 796851.64 Description:- Software for Building Management System : Supplying Installation Testing Commissioning of Necessary Software (UL listed) Packages containing Building Management with Capability of Collection, Storage, Processing and Controlling all the Data. Software shall support Open Standard Protocols like XML, BACnet, Modbus, Lon works etc. and without the use of Proprietary Protocols, with Enterprise Level Database Like MS SQL complete Lifetime Licenced & capable to collect, store & access all points from Fire Alarm Systems, IT Systems, Automation Systems, HVAC System, Lift, Energy management, Water Management System, etc. to create & monitor historical & event data, event management data, alarm management data & reporting data, Email Alerts for Critical alarms for all the systems. The scope includes additional software required
Design, Engineering, Supply & Procurement, Civil Construction, Erection, Testing, Commissioning and Taking over of the complete BESS project rated for 20MW/120MWh at the point of injection (132kV GIPCL substation) of Gujarat Industries Power Company Limited
Fire Protection, HVAC, Ventilation, Safety, Security and CCTV System Mandatory
Selection of Agency for Design, Project Management & Site Supervision for Construction & Upgradation of Schools and Allied Site Infrastructure Works in 15 Tribal Districts of Gujarat
Electrical, HVAC, FPS, PHE, Lifts, ELV, Multimedia, CCTV, Wi-Fi, Security Systems etc. shall be
Construction of Group Vocational Training Centre (GVTC) at Jagannath Area of MCL (2nd Call).
UVGI / NCC-PHILIPS/ TRIMED/STERILE AIR Supply, installation, testing and commissioning of coil mounted NCC (Natural Catalytic Converter) comprises of high output, hot cathode medium 4 pin single ended type soft glass lamp with Average Life of lamp Shall be 9000 hrs, generating wavelength of 254nm, for microbe neutralization & Energy Savings. The system shall comply with UL standard ABQK.E526448 to usage of the system in HVAC equipment. The NCC System shall consist of high output 254nm wavelength lamp, reflector(fabricated in Aluminium Alloy with minimum 80% reflectance),its mounting assembly. The entire system should be installed under the guidance of OEM/ Channel partner for proper installation & healthy functioning. The System shall be calculated to ensure the minimum wattage as per selection chart based on 4016 microwatt. sec/cm2 dosage over 4 air changes. Lamp & Ballast should be from same OEM Manufacturer. Country of origin for Lamp & Ballast should be US/Europe/India. Ballast shall be UL 935 certified. Vendor to comply all tender specifications. 4.0 TR Ductable unit M.S
PROVN OF CENTRALISED HEATING AND COOLING SYSTEM WITH HUMIDITY CONTRAL FOR DANGER BUILDING AT AFS THOISE
Central Air Conditioning System Incl Central Heating system (HVAC) Supply and fixing central air conditioning installations including AHUs, Water pump sets, cooling towers,ducting and electrical connection suitable for 3 phase, AC supply direct expansion system of capacity of 7.5 Ton for P-2 Danger Building. The system should be able to work under following condition : (i) Altitude 3070 m at Thoise. (ii) Outside temp condition is 30 +/- 2 degree celcius (iii) Inside condition to be maintain 20 +/- 2 to be maintain (iv) The equipment propsed should cater for derating factor for thoise area.