Loading…
Loading…
226 results • Best match
Establishment of New Medical College (Centrally Sponsored Schemes) ie Repairing and Replacement of Compo Along with Shifting Realignment of Outdoor Unit and Ahus of Split Ducted Units of Bluestar Make Installed for MICU Ward at Govt Distt. Hosp UDH
Construction of foundation for HVAC equipment -Outdoor Unit and AHUs.The Job includes construction of reinforced cement concrete (RCC) foundations for the Outdoor Unit (ODU), Air Handling Unit (AHU), and Exhaust Air Handling Unit (EAHU) of size 12 feet × 30 feet, with 2 feet depth below ground level and 1 foot above ground level. The job includes detailed site survey, layout marking, and excavation of approximately 20.4 m³ to the required depth of 2 feet, preparation of a firm and level base, and provision of 3.35 m³ of lean concrete (M10) bedding over compacted soil. The main foundation shall be cast in 30.6 m³ of reinforced cement concrete (M20 with approximately 2.4 tons of steel reinforcement as per structural design, including proper placement of anchor bolts, embedded inserts, and holding-down fasteners for mounting the equipment. Shuttering for the foundation, including the sub-surface and 1-foot exposed portion, shall cover an area of approximately 57 m² to ensure level surfaces during casting. Provisions for condensate piping, floor drains, electrical and control cable entry sleeves, and adequate maintenance clearances shall be included. Exposed surfaces shall be finished neatly, cured for the recommended period, and protected until equipment installation. Prior to placing the equipment, final verification of dimensions, levels, alignment shall be carried out. The completed foundation shall ensure structural integrity, proper load transfer, vibration-free operation, and facilitating safe and reliable installation and operation of all HVAC units.The complete job include cost of material, labour charges, tool and tackles charges and all kind of taxes thereof.
COMPREHENSIVE REPAIR/MAINT OF CENTRAL AC PLANT AND DEHUMIDIFIERS UNDER GE NARANGI
Comprehensive Annual Maintenance Contract (CAMC) for 03 Nos. Carrier 30RAM401 air-cooled scroll chillers along with associated AHUs, primary and secondary pumps, hot water generators and complete HVAC system . Scope of work shall include quarterly preventive maintenance visits, checking of suction/discharge pressure, oil pressure, motor temperature, water flow, cleaning of electrical panels, tightening of terminals and contactors, testing of safety controls, inspection of refrigerant leakage, vibration and abnormal noise, software diagnostics, annual shutdown servicing, compressor overhauling, replacement of oil filters, driers, compressor oil, minor refrigerant leak rectification, servicing of AHUs, cleaning of filters and cooling coils, inspection of belts, bearings, motors, lubrication, pump gland and seal maintenance, water balancing, attendance of complaints and breakdowns, submission of preventive maintenance and MIS reports, and ensuring uninterrupted efficient operation of complete HVAC system. Contractor shall provide all necessary tools, testing instruments, consumables, PPE and safety compliance including lockout/tagout procedures and electrical safety measures.
Lot-III Electro-mechanical works package of 240 MW (2X120MW) Uri-I Stage-II H.E Project, Baramulla District of UT of J and K
HEATING, VENTILATION AND AIR CONDITIONING SYSTEM (HVAC)
Operation and Maintenance of Civil, Electrical Services, E and M Equipments such as VRV Systems, BMS, EPBAX, Housekeeping services and 24 x 7 Security Services, etc. at Pharmacy Council of India, 3rd Floor, Tower I, World Trade Centre, Nauroji Nagar, New Delhi
The Contractor shall provide comprehensive maintenance services for the complete HVAC system ensuring uninterrupted, efficient, and safe operation of all
Annual Maintenance Contract of E and M, Traction and PSI for 11 Stations, One Depot and 2 RSS of Navi Mumbai Metro Line-1 for 3 Years extendable up to 1 Year
TOTAL COST FOR MAINTENECE AND MATERIAL SUPPLY FOR HVAC System (EXCLUSIVE OF GST)
Arrangement of air-conditioning system and renovation of electrical installation works for the office chamber of the Coir Board officer, as well as the store room, toilet, and office room located on the ground floor of Block-C, N.S Building.
Supply & Installation of Extra Add-on items- HVAC grade 5/8"(for suction) & 1/4"(for discharge) copper refrigerant pipe with 9mm thick nitrile rubber insulation including shaddle,screw, insulation tape, fastner etc for above AC machine as per direction of EIC.