Loading…
Loading…
947 results • Best match
Improvement, development and overhauling of HVAC Plant installed in MCH block at Swami Dayanand Hospital under Shahdara (North) zone
Work Name: Improvement, development and overhauling of HVAC Plant installed in MCH block at Swami Dayanand Hospital under Shahdara (North) zone
Construction of New Judicial Court Complex Gurugram (Pdg. Extra Items required for HVAC Panel Connection and Fire pump panel)
SITC of 3200A Angular bend shall be in accordance with IEC 61439:2012 and from the same manufacturer as the busbar trunking system. The degree of protection of the busbar trunking system should be IP54/IP65 in accordance to IEC 60529. Rated operation voltage of the busbar trunking is 1000V. 3 - Phase, 4 or 5 Wire with 50% capacity continual integral/internal earth busbar. The neutral conductor should have the same cross-sectional area as the phase conductor. The earth busbar must be one continuous piece without bolting on housing. The electrical contractor shall be responsible for routing the busbar trunking to coordinate with the other trades. Final field measurements shall be made by the contractor prior to release to the busbar trunking for fabrication by the manufacturer and should pass full type tests specified in IEC 61439:2012. The certificate shall be issued by an international independent testing authority (e.g. ASTA, KEMA). A product safety mark (e.g. KEMA-KEUR, ASTA DIAMOND) should be on the product offering a visible assurance to all of full product safety testing, factory inspection and ongoing surveillance under independent authority to ensure the ongoing safety of product. The busbar trunking system should pass seismic tests with actual physical product and being certified complying with UBC seismic Zone 4 condition by an international recognized earthquake research body, e.g. Asian Pacific Network of Centers for Earthquake Engineering Research (ANGER). other specifications as per DNIT in PDF.
Up gradation and development work including internal and electrical, HVAC, ELV work for Tulsi Musuem at Ramvan distt. Satna.
eProcurement System Government of Madhya Pradesh Created By: Amit kumar Tiwari Created Date/Time: 22-May-2026 05:11 PM Tender Title: Up gradation and development work including internal and electrical, HVAC, ELV work for Tulsi Musuem at Ramvan distt. Satna. Tender ID: 2026_STDC_493774_1
Comprehensive operation and maintenance Contract (03 years) for HVAC work at GNIDA Office Building Sector KP-IV, Greater Noida.
eProcurement System Government of Uttar Pradesh Created By: PRANAV SINGH RATHORE Created Date/Time: 07-May-2026 11:31 AM Tender Title: Comprehensive operation and maintenance Contract (03 years) for HVAC work at GNIDA Office Building Sector KP-IV, Greater Noida. Tender ID: 2026_GNIDA_1129434_22
Comprehensive annual maintenance contract of 4 X 300 TR Air-cooled screw chillers at new HVAC plant in IIT Guwahati
Comprehensive Annual Maintenance of 4X300TR screw chiller (Total 1200TR) HVAC Plant with all accessories, associated equipments & consumables etc. mentioned in the scope of work,terms & conditions as specified in the tender document as directed for the PERIOD OF ONE YEAR
MO E&M equipment of office building for Income Tax department at Pratyashkar bhawan Ahmedabad SH:Lower side maintenance of HVAC