MTPS I Mill Plant Unit III Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 3A 3B 3C 3F and Dismantling of seal air fan motor
Charges for dismantling and assembling the existing impeller from seal airline 3A & 3B in mill plant cleaning and inspection of impeller If necessary to replace the damaged parts and after completion of work the same will be assembled in the seal air motor and providing the gland rope with aligning the fan with motor including trial operation.
Custom Bid for Services - Erection and Fabrication of Cast Basalt Lined MS Pipe of Size 450 NB with fixed flanges at both sides in ADL line under AHP RTPS DVC Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Erection and Fabrication of Cast Basalt Lined MS Pipe of Size 450 NB with fixed flanges at both sides in ADL line under AHP RTPS DVC Similar Category Operation and Maintenance Power House/Power Plant
SH- Day to day operation and maintenance/repair of Electrical and Mechanical services and Electrical works at Circle M-21, M-23, Horticulture Div.-214, for Divn. M-211, Civil Divn. M-231,Electrical Divn. M-251)
Supplying , Installation, Testing and Commissioning of Air Cooled Hi Wall split type Air conditioners complete with Indoor unit(IDU), Out door unit (ODU), surface / concealed copper Refrigerant piping with insulation (closed cell elastomeric nitrile rubber tubular pipe section) upto 3 Mtr (IDU to ODU), copper power cable upto 3.5 Mtr (IDU to ODU) i/c drain pipe R-32/R-410/ R-407 Green Refrigerant, wireless Remote control, suitable for working between 180- 260V with low & high voltage cutoff and 50 hz ,1 phase AC supply capable of performing cooling, dehumidification, air circulation of following capacity with Scroll / rotary compressor. The system shall be able to deliver 100% of the rated capacity upto 42 0C. Min 5 year Original Equipment Manufacturer (OEM) warranty both compressor and Printed Circuit Board (PCB). Must comply : Electrical cable IS 694 or IS 9968 temperature sensing control IS /International Electrotechnical Commission (IEC) 60730, hermetic compressor IS 10617, heat exchanger IS 11329, capacitor IS 2993 and motor IS 12615. Complete as perCPWD specification and IS : 1391 Part II 2023. The system shall be able to operate up to 50 0C (out door ambient temperature) .2.0 TR with 5 Star BEE Rating
Maintenance of electrical installation of whole campus at Purta Bhawan------ Repair and replacement of existing cable tray and MS platform and grill guard of Split type AC machine with fabrication work and dressing of AC pipe line and allied works
MTPS 1 Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing airport rin
Charges for clearing the accumulated coal dust, fly ash and other waste materials and air washing of the feeder discharge chutes and its platforms, structural areas, coal pipes from mill to boiler, Centre feed pipe and its fittings, mill tops, mills, mill floor, below mill floor, gear box areas and ground floor, seal air system, cleaning the oil leakage in gear box area and ground floor etc .
Conversion of the 33KV outgoing feeder bus bar from conductor type to pipe type, Replacement of 33KV, 1250A GOAB switch, Fabrication of a steel platform, Sand and gravel filling in the substation yard, and Maintenance and reconditioning of two nos. 1
Supply and fixing of connector of alloy aluminium pipe to pipe suitable for bus pipe having outer dia 48.26mm