Loading…
Loading…
17,790 results • Best match
GENERAL-Dam safety- Renovation works to the Malampuzha dam LB main canal Cross regulator-Providing rubber seals for 3nos. cross regulator shutters at Malampuzha dam LB main canal- Ch 0/260 km-General Mechanical Work
OD17793/2025-2026:Fabrication and erection of Embedded parts of Canal shutters ( Up to 2 tonne weight ) and accessories as per approved specifications, drawings and directions of deptl. officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc. complete but excluding cost of material already supplied
COMPOSITE WORKS CNG STATIONS AT GAJAPATI GA ELECTRICAL, MECHANICAL, STRUCTURAL AND CIVIL WORKS
Government eProcurement System Created By: DINESH KUMAR BELLANI Created Date/Time: 18-Jun-2026 03:34 PM Tender Title: COMPOSITE WORKS CNG STATIONS AT GAJAPATI GA ELECTRICAL, MECHANICAL, STRUCTURAL AND CIVIL WORKS Tender ID: 2025_GAILG_260186_1
Operation And Maintenance Of Electro-Mechanical Installations - LAN across WB, CP, Office
Operation And Maintenance Of Electro-Mechanical Installations - LAN across WB
Electro Mechanical Works of 3x100 MW Lakhwar MPP on EPC basis.
220 kV Pothead yard equipment including gantry structure, lightning arresters, capacitive voltage transformers, wave traps, disconnectors, conductors/aluminum pipes, earth wire, insulators, hardware items etc., as per specifications and scope defined in Chapter 11 of Section IX- (PTS)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Biennial contract for the work of Upkeeping and Cleaning of Turbine Area and offSite Area, along with Mechanized Cleaning of TG floor of Unit No 5 a..
and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Biennial contract for the work of Upkeeping and Cleaning of Turbine Area and offSite Area
MTPS I TM I Unit IV Annual Maintenance work in Main Turbine and its Auxiliaries during 2025 26
Overhauling of Governing System: Dismantling front pedestal cover, overhauling of main oil pump, intermediate pilot valve, Speed load control assembly, Differentiator, EGPV, turbine trip switch, CVSM feed pack pilot Control pilot & over speed striker. Dismantling of front bearing pedestal top cover, disconnecting the oil pipe lines, dismantling the gear coupling inspection & rectification dismantling of main oil pump, rotor float checking, side and top oil clearance checking. Inspection of impeller, wear ring clearance checking inspection of bearings and doing correction works, replacement of bearings, gear coupling if required. MOP & HP rotor alignment checking and correcting the same and assembling the gear coupling and MOP cover. Dismantling the MOP NRV, lapping and blue matching and assembling, Dismantling, cleaning, inspection and assembling of follow pilot, summation pilot, load/speed control pilot, speeder gear assembly, EGPV, intermediate pilot, differentiator, CVSM feedback pilot etc., Speed governor sleeve to nozzle, EGPV lever to over speed striker to rubber.