Loading…
Loading…
17,790 results • Best match
MTPS I TM I Unit I Annual Maintenance work in Main Turbine and its Auxiliaries during 2025 26
Overhauling of Governing System: Dismantling front pedestal cover, overhauling of main oil pump, intermediate pilot valve, Speed load control assembly, Differentiator, EGPV, turbine trip switch, CVSM feed pack pilot Control pilot & over speed striker. Dismantling of front bearing pedestal top cover, disconnecting the oil pipe lines, dismantling the gear coupling inspection & rectification dismantling of main oil pump, rotor float checking, side and top oil clearance checking. Inspection of impeller, wear ring clearance checking inspection of bearings and doing correction works, replacement of bearings, gear coupling if required. MOP & HP rotor alignment checking and correcting the same and assembling the gear coupling and MOP cover. Dismantling the MOP NRV, lapping and blue matching and assembling, Dismantling, cleaning, inspection and assembling of follow pilot, summation pilot, load/speed control pilot, speeder gear assembly, EGPV, intermediate pilot, differentiator, CVSM feedback pilot etc., Speed governor sleeve to nozzle, EGPV lever to over speed striker to rubber.
Pipeline and structural works in SRP Mechanical at TNPL Unit-1
Pipeline & structural works in SRP Mechanical at TNPL Unit-1 (The rate quoted is exclusive of GST)
CONTRACT FOR HOUSEKEEPING WORK IN BOILER OF U-10 PART-D FOR 14 MONTHS.
STG-3 H/K OF U-10 BOILER PART-D
DAHIGAON LIS STAGE 1 AND STAGE 2 MECHANICAL COMPONENT REPAIR WORKS
DAHIGAON LIS STAGE - 1 AND STAGE - 2. MECHANICAL COMPONENT REPAIR WORKS. Schedule B
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - SERVICE WORK FABRICATION AND ERECTION OF CHIMNEY BOILER NO 1 AND 2; SERVICE WORK FABRICATION AND ERECTION OF CHIMNEY BOILER NO 1 AND 2; Buyer
and Installation of Plant Systems/Equipments (Version 2) - SERVICE WORK FABRICATION AND ERECTION OF CHIMNEY BOILER NO 1 AND 2; SERVICE WORK FABRICATION AND ERECTION OF CHIMNEY BOILER NO 1 AND 2; Buyer
Sina Mehekari LIS Mechanical Component Repair Works For The Year 2025 2026
Sina Mehekari LIS Mechanical Component Repair Works For The Year 2025-2026. Schedule B