Loading…
Loading…
2,016 results • Best match
Construction of Recharge Shaft for Aquifers PS Nadbai Under MJSA 2-2
Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Nominal bore 250 mm dia.
Pkg No. 12/PMKKKY/Mines and Minerals/2025-26 in Kundadam Block of Tiruppur District
Drilling of 150mm dia vertical borewell in overburden soil including all cost etc,.complete
Civil Works for Providing Protection to Wharf Wall at Temporary Railway Siding under Mungoli Sub Area.
Providing empty cement bags ( 50 kg capacity) of good quality, filling them with approx. 1 cft of available sand / overburden/ non-cohesive soil etc. in each bag, sealing / stiching them properly, and placing the bags at the desired places, etc. all complete as per instruction of the Engineer-in-charge or Mine authority or representative of any of them.
Flood Mitigation Work to the Eroded portion by using Construction of Gabion wall and groynes in Left Bank of Cauvery River in Melur Village and Right Bank of Coleroon River in Vellithirumutham Village of Srirangam Taluk in Trichy District.
Supplying hard granite stones of weight 0.50MT to 2.00MT for Armour layer upto 8.00m water depth including Quarrying, loading at quarry, conveying in contractors transport by tipper including pre weighing and post weighing for the purpose of measurement and dumping in to the River bank slope with required Width and side slope with necessary equipment and device asper Drawing and specification etc., complete and as directed by the departmental Officers.
Rejuvenation of Themra near Mandir, Gudhali Bandh, ward no-39 under SMC Sambalpur.
Supplying ,Filling of sand in foundation and plinth base of road surface including cost of material with taxes , watering, ramming and labour required for the work etc.Complete as per direction of E-I-C.
Beautification of Chilika Shore in Ward No.02
Earth work in excavation of foundation in hard soil with in intial lead and lift including rough dressing and levelling the bed etc. complete.