Loading…
Loading…
2,031 results • Best match
REPAIRS TO PCC FOOTPATH HARSTANDING INTERLOCKING TILES AND CHEQUERED TILES AND ALLIED CIVIL WORKS AND REPAIR TO AREA STORM DRAINAGE SYSTEM DRAIN COVERS CULVERT RCC SLAB ETC INSIDE CABS CEMILAC AND STIR UNDER AGE BR II AT BANGALORE
Material and labour for sand filling under floors or in foundations including watering and consolidation for laying of interlocking paver blocks complete all as specified and as directed. NOTE :- Mining sand/stone dust shall be of approved quality and should be free from lumps / broken / flaky aggregate.
Annual Rate contract for Construction and Commissioning of 200 mm dia tube wells with Submersible pump sets etc. complete work in all types of strata including defect liability period of 2 years at various villages/Towns of Division Bundi and Lakheri
Construction of Tube Well from ground level and upto 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Nominal bore 200 mm dia.
REINFORCEMENT OF KAKHADI-V RL, BHUINBAREI RL AND DWARBATIPUR RL LIPs Project
Miscellaneous item like cleaning of site, overburden earth cutting etc
Hill Protection work to stabilise CISF Patrolling Road near Ch 2200, Lalbatti, North Site, BARC, Trombay, Mumbai.
In overburden /highly weathered rock/fractured rock
Construction and Commissioning of 200mm dia three phase Tube Well on Annual Rate Contract basis in Combination strata including defect liability period of two years in urban/rural area of District Bharatpur.
Construction of Tube Well from ground level and up to 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe.
Formation of New Reservoir in Kovalam Sub Basin in between ECR and OMR Road in Thiruporur Taluk of Chengalpattu District. (Phase1). Package - 2 Western and Northern side
Earth work in all soils except Medium rock / hard rock requiring blasting conveying for Formation of bund with a lead 2 km deploying earth moving machineries and tipper including benching formation of bunds, breaking clods, sectioning with a extra watering and consolidation by power roller and including hire charges etc. complete complying with standard specifications and as directed by the departmental officers (Formation of Overburden berm and Spoil berm with 2 Km lead with consolidation)