Loading…
Loading…
505 results • Best match
Provision of Electronic Interlocking at Risama(RSA), Gundardehi(GDZ),Latabor (LBO), Balod (BXA) and Kusumkasa (KYS) stations including new loop line at Risama (RSA), Latabor (LBO) in Durg-Dallirajhara section of Raipur Division.
... Transportation, installation of Optical Fibre termination box(FDMS/FMS)and splicing of Optic Fibre Cable (24 fibre) inside the termination ...
1. Signaling arrangements for Elimination of end cabins by integrating their operations with Ramagundam station and the Bypass cabin. 2. Signaling and Telecom arrangements for proposed new crossing station at Km No. 8 - 9 between RDM - GDK line on deposit terms. (Deposit work)."
Supply of SC - LC Fiber Optic Patch Cables 3 Numbers Meter LC to SC... 9/125m OS2 Single- mode Fiber Optic Cable Jumperas per the requirement ...
Outdoor work in relation to LHS at JT-01 (BXQ-JSGR), JT-36 (ATS-DOBH), JT-69 (BRPL-DJX), ST-14 (SBPY-MANE), ST-59 (SRGP-HNPA) & ST-69 (SRGP-HNPA) in Sambalpur Division.
Supply ,transportation & installation of Optical Fibre cable joint enclosure and splicing of OFC (24 Fibre) and testing. OFC spicing shall be done in presence of Railway Representative.
CCTV CAMERA
2M LC to LC Fiber Optic Patch Cable
Construction of Library in the existing Ravidas Bhawan in MC GOHANA.
... and drawing following core Fiber Optic Cable having corrugated steel armoring. The Fiber should be SM Fiber Central... required. Single Mode 12 Core optical fiber cable.
Provision of safety fencing (Double W type) from MB-NBD on MB-SRE section
Drawing / Blowing of Optical Fiber Cable in PLB HDPE Duct. Inspection Authority: Site Engineer Technical Specification: As per technical specification provided in Part III of Tender Document
Supply, installation, testing and commissioning of passenger Information system, Public address system and other telecom assets at various stations of Mumbai Division.
... includes termination of optic fiber cables along and rack with mounting ...
SITC of Periphery Surveillance of NTPC Gadarwara by Smart CCTV Solution
Laying of OFC through HDPE Pipe
Construction of 132 KV Transmission lines on ACSR Panther conductor approx 90 route Kms of UPPTCL on Turnkey basis
(a) 96 Fibre (DWSM) OPGW Fibre Optic Cable route km 24
Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing and Commissioning etc. for Construction of 132 KV and 220 KV Transmission lines on ACSR Panther/Zebra conductor (approx. 74.11 route Kms) of UPPTCL, on Turnkey basi
(a) 96 Fibre (DWSM) OPGW Fibre Optic Cable route km 32