Loading…
Loading…
505 results • Best match
Transmission Line Package TL01 for A Construction of lines 1 Singrauli-III Vindhyachal PS 400kV SC Quad Line on D/C Multi Circuit Towers and 2 Shifting and termination of existing Vindhyachal V to Vindhyachal IV 400kV DC Twin line at Singrauli III under Singrauli StageIII project and for B Construction of 765KV SC interconnection Transmission Line from GT Generator Transformer Gantry to the existing NTPC 765KV Sipat Generation Switchyard under consultancy se
47 7000038200 10 OPGW SUPPLY 1000030941 85447090 18 48 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 4.215 INCLUDED 0.00 0 0
Construction of New Office Building of Sub-Collector, Rayagada in the District of Rayagada.
... mode OS2 Unitube Armoured Optical fiber cable through existing conduit:... should be OS2 Single Mode Optical Fiber Cable of Size 9/125µm. Outdoor ...
Request for Proposal for Rate Contract for Maintenance of Information Technology IT related Items and Services to National Health Mission, Madhya Pradesh
59 4 port , 10/100 mbps fast ethernet switch (fibre optical based) D link or Equivalent 1
S&T work in connection with Construction of 03 Nos of full length stabling Lines towards DN grid and additional stabling Lines for Coaching Rake at Adityapur.
... loading/unloading Kilometre of Optical Fibre Cable along with HDPE pipe from ...
Construction of Court Building at Nimapara.
... mode OS2 Unitube Armoured Optical fiber cable through existing conduit:... should be OS2 Single Mode Optical Fiber Cable of Size 9/125µm. Outdoor ...
1. Construction of 45 km 220 kV D/C Dahra (400 kV GSS)- Budhadeeth line. 2. Construction of 15 km 132 kV S/C Sultanpur- Budhadeeth Line. 3. Construction of 25 km LILO of 132 kV S/C Mangrol- Itawa Line.
48 Fibre (DWSM) OPGW fibre optic cable
Construction of 1 No. 400kV and 1 No. 220kV line for proposed 400 kV GSS SawaiMadhopur under BN-9074002601
48 Fibre (DWSM) OPGW fibre optic cable
Conversion of existing 220/132/33kV AIS to GIS, with transformation ratio of 220/132kV, 4x200MVA,132/33kV, 3x80MVA at Sarusajai Grid Substation of Assam with associated Transmission Lines with Provision for Future Upgradation to 400 kV Substation
... hardware set for above 96 Fibre, Fibre Optic Approach Cable vizties/clips/cleats, conduits, ...
Refer to BOQ
... following core Multi mode Fiber Optic Cable having corrugated steel... required. 12 Core Multi Mode Optical Fiber Cable
Construction of 2x40 MVA 132KV AIS S/S Unchahar, Raebareili
Optical fibre reqd. for SAS