Loading…
Loading…
504 results • Best match
Structured Cabling work at ISTRAC
SC-LC Single Mode Optic Fiber duplex patch cords (male):1M Min Qty per order: 20 Nos. , Max Qty per order: 50 Nos. , Total Qty: 100 Nos.
ESTABLISHING 2X8MVA, 66/11kV SUB STATION AT A B VAJPAYEE LAYOUT AT CHIKMAGALURU
Fibre Optic Approach Cable
(A) Signalling work for Construction of ROB in lieu of LC-415-A at Km 1313/0-1 and (B) Construction of Grade separator with stair (FOB) at LC no. 34L at KM 1348/31-33 in NYN-MKP section of Prayagraj Division.
... is done. Important: The laying of OFC cable independently or along ...
Single Phase Auto transformers to 220/132 kV GIS Substation at Paonta Sahib (4 Nos.) , 220/132 kV AIS Substation at Kala Amb (3 Nos.), District Sirmour and 53.33/66.67 MVA, 220/132/11 kV, Single Phase Auto t/fs to 220/132 kV AIS S/stn at Kunihar
... in all respects including Fibre optic temperature measuring system ...
Supply of IT items
Fiber Optic Mechanical Bamboo Closure
Work of Design, Supply, Erection, Testing and commissioning of new Generator Relay Panels in place of old panels for Unit No. 3 & 4 of Gandhinagar TPS.
Ethernet / USB / fibre optic port shall be provided for rear
Construction of Nuclear Medicine Block at SKIMS Soura(Balance Work).
Supply & instalation of optical fiber 3mtr. Patch cord.
Additional Estimate for Construction of Judicial Court Building with Garrage (2 Nos.), Sentry Post (2 Nos.), Internal Boundary Wall and C.C. Pavement in the Judicial Court Complex at Amingaon, Guwahati. (Furniture and Electrical Works)
... Testing And Commissioning of optical fiber 6 core, Armouring: Corrugated ...
Supply, installation , testing and commissioning of Main & Intercom exchanges along with augmentation of various telecom infrastructure at various locations/ office in Mumbai Divisions.
Splicing of Optical Fiber Core and routing in joint closure/FDMS as per instruction of site Engineer. (For FDMS). Inspection by consignee.
Enhancing safety by replacingdefective/ worn-out TLJBs, Track leads, point insulations,ground connections, Location boxes & foundations, Signalassemblies & foundations including trenching, laying ofcables, terminations etc. in the section of ADSTE/ BTE onKota Division.
Splicing of Optical Fiber Core and routing in Numbers joint closure/FDMS as per instruction of site Engineer. Total 6652883.16