Loading…
Loading…
503 results • Best match
SPARE 4, SPARE 6, SPARE 7, SPARE 8, SPARE 11, SPARE 12, SPARE 13, SPARE 14, SPARE 15, SPARE 16, SPARE 17, SPARE 18, SPARE 19, SPARE 20, SPARE 21, SPARE 24, SPARE 26, SPARE 27, SPARE 28, SPARE 29, SPARE 30, SPARE 31, SPARE 32, SPARE 33, SPARE 34, SPARE 35, SPARE 36, SPARE 37, SPARE 38, SPARE 41, SPARE 42, SPARE 43, SPARE 45, SPARE 48, SPARE 49, SPARE 50, SPARE 51, SPARE 52, SPARE 53, SPARE 56, SPARE 57, SPARE 58, SPARE 59
SPARE 31 Fiber optic LC-LC patch cord, Single mode
LED Vedio Wall and accessories
Fiber Transmitter and Receiver Supply of Fiber Optic Transmitter & Receiver pair for HDMI and Audio Signals as per the specifications
S&T work in connections with construction of new goods shed for provision of one loading line at Bagratawa station of Jabalpur division on West Central Railway (Signalling work).
... capable to map E1 on to optical fibre port , 8 Port built in Switch ...
Provision of Auto Signalling with Electronic Interlocking (OFC Based) between Tenganmada(TGQ)-Khongsara(KGS)-Bhanwartonk(BHTK)-Khodri(KOI)- Sarbahara(SBRA)-Pendra Road(PND) section with alteration in existing Panel interlocking, Electronic Interlocking & Supply, Installation, Testing, Commissioning of new Electronic Interlocking, MSDAC & IPS etc., execution of all indoor & outdoor works & construction and Electrification of the huts etc. in Tenganmada-Pendra Road section of Bilaspur Division of S.E.C. Railway.
... for OFC etc. There must be Optical Fiber link with loop back (Protection ...
Construction of 6 ROBs (i) 2-lane ROB in lieu of LC-42 (including LHS) at km 44.466 on Ludhiana -Dhuri section of Ambala Division of Northern Railway (ii) 2-Lane ROB in lieu of LC-43 (including LHS)at km 45.657 on Ludhiana -Dhuri section of Ambala Division of Northern Railway (iii) 2-Lane ROB on Railway cost in lieu of Level crossing No. 16 A(including LHS) at km 18.186 between Kila Raipur and Ahmadgarh Railway stations on LDH-DUI section of Ambala division. (iv) Construction of 2-Lane ROB in lieu of LC NO. S- 4( including LHS) at KM4/5-6 in between BHRL-SJNP stations of Jammu Division. (v) 2 - lane ROB (including LHS ) in lieu of LC- 39C at km 41.155 (OHE mest no 41/2- 4) between Mianpur- Rupnagar Stations on Sirhind - Daulatpur Chauk Section Ambala Division (vi) 2 lane ROB in lieu of LC no. 120/SPL (including LHS) at km 236/2-4, b/w GHG-CDG stations on UMB-KLK section of Ambala division of NR under Road Safety Projects Unit Northern Railway.
... amendment and splicing of optical fiber cables(24 Fibers and testing),. This includes ...
Provision of Electronic Interlocking System with Digital Axle Counter (MSDAC) in station yard, along with S&T service Building at HDN Route Station Hindaun (HAN) on Kota Division.
Splicing of Optical Fiber Core and routing Per Unit in joint closure/FDMS as per instruction of site Engineer. Item will be per fiber.
Rajkot Division: Provision of CCTV Cameras at manned Non-Interlocked LC gates over Rajkot Division.
... 23 placing of DWC pipes, Laying of OFC/STP/Power cable etc in Trenches ...
WORK SERVICES FOR RESURFACING OF PAVEMENTS AND OPERATING SURFACES AT AF STATION JAISALMER
... exceeding 3.0 meter for laying of OFC cable, and ensuring protection ...
Telecom related works for Standard RPF Post at ANGL, Extension of Network Connectivity at TTE Lobbies at 11 Stations ( BHC, JJKR, CTC, DNKL, ANGL, BBS, KUR, PURI, BALU, PSA , BAM ) , SSE(W) Office-cum-Store Buildings at Dhenkanal, Angul & Barang, 20-Bedded Running Room at CAP and Standard Post Building at Platform No.1, BAM over Khurda Road Division.
5 5 Laying of OFC/Power cable/CAT-6 cable/PA Metre 700.00 28.37 19859.00
Various AR/SR/Anurakshan and Deposit work of Govt. Resi. Qtrs. at 23 batalian under M-2 Sub Division, PWD Bhopal
... pipe lines, telecom lines, optical fiber lines, file pipe lines, ...