Loading…
Loading…
2,388 results • Best match
Improvements to road from (i)Venugopalapura to Chalaganahalli via Mavahalli, Kamandahalli (Road ID-120), (ii)Arimanahalli to AP Border via Thalampalli, Bisanatham Railway Station (Road ID-960), (iii)Dinnur- Budikote Road (MDR) to Budikote via Bommaganahalli, Bueldaynahalli, Marandahalli (Road ID-2211), (iv)Harati Road to Kenchapura via Harati Mallandahalli (Road ID-2485), (v)Yalaburgi to Ithandahalli via Nernahalli (Road ID-2789) in Kolara PIU - ADB FINANCED
Improvements to road from (i)Venugopalapura to Chalaganahalli via Mavahalli, Kamandahalli (Road ID-120), (ii)Arimanahalli to AP Border via Thalampalli, Bisanatham Railway Station (Road ID-960), (iii)Dinnur- Budikote Road (MDR) to Budikote via Bommaganahalli, Bueldaynahalli, Marandahalli (Road ID-2211), (iv)Harati Road to Kenchapura via Harati Mallandahalli (Road ID-2485), (v)Yalaburgi to Ithandahalli via Nernahalli (Road ID-2789) in Kolara PIU - ADB FINANCED
DC Work SC Railways Supply, Erection, Testing and commissioning of (i) Stringing of 132kV DC line from existing 132/33kV SS Kolanpaka to existing 132kV RTSS Alair (Conversion from 2 phase to 3 phase system) (ii) 2 Nos. 132kV Feeder Bay Extension at existing 132/33kV SS Kolanpaka (iii) 2 Nos. 132kV Metering Bay extension at existing 132/33kV RTSS Alair in Yadadri Bhongir District .
1)SBC-TK-SPGR Section- Proposed construction of ROB at LC.No50 @KM:85/700- 800 42m composite Girder 2)Proposed construction of RUB at LC gate No.48 @kM 81/500-600 between Mallasandra and Gubbi stations in ADEN/YPR sub division 3)SBC-TK-SPGR ... GBD Railway station ... Kengeri railway station ... of railway alignment ... of railway alignment ...
1 01 Design, supply, installation , testing and Numbers 167.00 11865.00 1981455.00
Bhavnagar Division: Supply installation, Testing, Commissioning of Signalling gears and alteration in Medha make Electronics Interlocking system in connection of Bhimnath- Provision of Additional Loop Line.
Fixing and wiring of DC track circuit equipments i.e. track feed charger, resistance, track relay, 29 battery, PPTC fuses etc., in the Apparatus Case and battery box as per standard practice. Termination of tail cable on M 6 / Screw less terminals WAGO or FINOLEX or similar approved make terminals/ fuse blocks / HRC fuse. Item includes testing /commissioning of track circuit. Complete wiring material (including PPTC fuses) which are not covered in Schedule will be supplied by contractor. (Supply of Track feed battery charger, track feed battery, resistances & 'B' type choke & Track relays will be supplied by Railways / covered in Schedule separately).
BORING WORK FOR CONSTRUCTION OF VARIOUS BRIDGES UNDER SUB DIVISION NO.-3 RAIPUR FOR 2026-27
4 4.37 DGPS Survey for Flyover/ ROB/ RUB/ Overpass/ Grade Separator and providing Autocad & KML files of survey data with details of all existing structures like road, kerbs, trees, drain, temple, buildings, railway tracks etc. along with utilities like electric poles etc. & superimposing on Google map including marking of coordinates at site location as per direction of Eingineer in-Charge 3100.00 Meter
Adra : Modification of OHE for removal of signal infringement.
Supply of OHE, excluding supply of catenary, contact, jumper, dropper wire and large span Per Track wire which will supplied by Railway. KM