Loading…
Loading…
2,454 results • Best match
Ajmer Division-"Provision of 72 CCTV cameras with monitoring and recording system at all Major Booking office & PRS counters, 22 Stations (29 Locations)."
Legrand or superior. Cable will be supplied by Railway and all other fixing material will be supplied by contractor. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after execution.
Carrying out Zone works for period ending 30.06.2027 on Zone No-14 Patiali(Excl.) to Fatehgarh(Excl).
Operation of all required sluice valves at Colony/ Per station including supplying valvemen to provide Month timely water supply in Railway colony both in day and night shift i/c visiting all pump houses to see whether they are runningor not and informing to SSE/W. Visiting Over head tanks to see they are filled full or not, also visitng all times during valve operation in colony to water is being supplied in Rly. Qtrs and remain all time alert complete with all man-power,T&P,GST taxes etc. (Total 02 person require per day each in day and night shift)
Jacketing of bridges including design & launching of PSC slabs and other allied works of bridges in c/w Replacement of steel girder of PSC slab at bridge no. 7, 38 ,39 (MB-CH) , Br. No 106 ,121A (CH- ALJN) and Br. No. 20(JNPT-CH) & 6 on (RJK- SHTS) under Sr.DEN/HQ/MB
260.00 ballasted deck bridges with any type of rail section and PSC sleeper including leading free rails/welded panels available along the alignment on to bridge, leading and spreading all fittings and fastenings, leading & spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails & guard rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. 3. This item shall be applicable only when track is with Guard Rail. Linking without guard rail be paid under relevant item for plain track linking. Total 172308.65 Item- 9 All items of Ch.13 (Maintenance Activities) SOR 2021 S No. Item Description of Item Unit Qty Rate Amount No First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
Electrical TRD Works in connection with OHE modification work at NCBD Station against the Engg. Work "Provision of Direct reception at NCBD by providing crossover at MYGD end at NCBD"
Supply, laying, commissioning & testing of CI Pipe 100 mm dia Class LA type (IS 78 1536-2001) to be laid partly along the pole and partly through ground under railway track/road in cable trench for protection of cable with suitable fixing arrangement by MS clamp, nut, bolt,washer etc.as per instructionof Engineer incharge at site.
Construction of New Loco Trip Inspection Facility in Existing Washing Line at Bhagalpur and Capacity augmentation for air brake testing & Painting by extension of WRS-V towards South end in Workshop Jamalpur in the Jurisdiction of Dy. CE/Con/BGP.
Dismantling of existing LWR/SWR track of TRM any structure, removing rails, sleepers, fish plates, cutting of rails, segregation and stacking of released Rails, Sleepers and fitting at nominated location in countable manner within a free lead of 500m, levelling of ballast to correct profile for laying new track over it, all as per direction of Engineer-in-Charge. Linking of BG track (except at LC, Bridges and SEJs) with any type of rail section and sleeper of specified density, on ballast bed spread and compacted with suitable roller, over prepared formation including leading free rails/welded panels available along the alignment on to formation, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item.
Electrical work in c/w Development of infrastructure/maintenance facilities for trains at Suratgarh Station, Work for shifting ARF at other location in Suratgarh Yard to facilitate coaching terminal at Suratgarh Junction and Upgradation/ Augmentation/Creation of Disaster management Rolling Stock maintenance facility at Suratgarh over BKN Div.
Railway representative taking all necessary safety precautions related track and movement of trains. Horizontal boring will be done at minimum 1.5 Mtr. Below from ground level at railway track portion.