Loading…
Loading…
2,036 results • Best match
"Yard remodeling works of Junction cabin Gondia (Dawwa), Hirdamali, Wadwgaon, Wadsa, Nagbhir and other Engg works in connection with Gondia- Chandafort doubling in Nagpur Division of South East Central Railway."
Providing Centre Line / Rail Level, reference Pegs on formation at an interval of 30 metres on one side or at centre of proposed / existing track, as directed by engineer in-charge for 27 linking of new track / CTR / Deep Screening / Lifting / Lowering works, duly embedding in formation including marking with contractor's paint. Note: (1) Rails/tie bar of suitable size bar shall be supplied by the Railways from nearest Stores Depot. In case of hard wood peg, the hard wood will be supplied by the contractor. (2) Excavation and concrete work, if required, will be paid separately. With contractor's hard wood pegs of 50 mm dia and 60 cm long
Kharagpur Division : Transportation of P.Way materials by road from any station of Indian Railway to Work Site/ Store Depot.
1840.00 118.45 handling is possible a n d traffic block is not required. Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
Construction work RCC Nala from Pole no 01 to pole no 11 railway line west side moh Lohiya Nagar
R.C.C. work for Drain wall and bottom 1:2:4 cement C/ sand and app stone grit including centering shuttering Excluding rein forcemeant supply of all material labour T&P all complete
"Yard remodeling of Talodhi, Rajoli, Mul Marora, Kelzar and Chandafort Engg works in connection of Gondia- Chandafort doubling Project of Nagpur Division of SEC Railway."
Providing Centre Line / Rail Level, reference Pegs on formation at an interval of 30 metres on one side or at centre of proposed / existing track, as directed by engineer in-charge for 27 linking of new track / CTR / Deep Screening / Lifting / Lowering works, duly embedding in formation including marking with contractor's paint. Note: (1) Rails/tie bar of suitable size bar shall be supplied by the Railways from nearest Stores Depot. In case of hard wood peg, the hard wood will be supplied by the contractor. (2) Excavation and concrete work, if required, will be paid separately. With contractor's hard wood pegs of 50 mm dia and 60 cm long
Supply , installation ,testing and commissioning ,of telecom equipment- including , Trenching, Laying , blowing, splicing, jointing, termination, testing of OFC & Quad cable-in connection of various work of Dy.CSTE /const/ Vadodara juriduction - ... Pratapnager work shop ... phase-II work - ... Western Railway
A1-Supply portion
South East Central Railway (Construction Organization)- Engineering Procurement and Construction (EPC) Contract for Construction of Gondia ByPass Line Between Gudma and Pratapbagh Stations Including Yard Remodeling, 1x25 KV Electrification, Signaling ... Shifting works in ... Central Railway .